Manual Toshiba GF632

56 pages 1.33 mb
Download

Go to site of 56

Summary
  • Toshiba GF632 - page 1

    6F8A0883 NOTES Before using the equipment, please read this manual carefully and understand the contents, and then use the equipment correctly. • NEVER attempt to operate the equipment in any ways that are not described in this instruction manual. • After reading this manual, store it with care in a place where it can be referre ...

  • Toshiba GF632 - page 2

    - 1 - 6F8A0883 NOTICE We thank you very much for your purchase of our GF630 series electromagnetic flowmeter detector. Integral type GF630/LF600F and GF630/LF610F Separate type detector GF632 This instruction manual describes the notes on using an electromagnetic flowm eter detector, installation, configuration and maintenance ...

  • Toshiba GF632 - page 3

    - 2 - 6F8A0883 SAFETY PRECAUTIONS Safety signs and labels affixed to th e product and/or described in this manua l give important inform ation for using the product safely. They help prevent damage to property and obviate hazards for persons using the product. Make yourself familiar with signal words and symbols u sed for safe ...

  • Toshiba GF632 - page 4

    - 3 - 6F8A0883 SAFETY PRECAUTIONS Safety Precautions for Installation and Wiring WARNING  Do not disconnect while circuit is live unless location is known to be nonhazardous. DON ’ T Live part of electric circuit or a high temperature department can cause explosion .  Do not modify or disassemble the enclosure. DON ’ ...

  • Toshiba GF632 - page 5

    - 4 - 6F8A0883 SAFETY PRECAUTIONS (continued) Safety Precautions for Installation and Wiring CAUTION  Install a switch and fuse to isolate the GF630/LF600F, GF630/LF610F and GF632 fro m main s po wer.  Use an appropriate device to carry and install the GF630/LF600F, GF630/LF610F and GF632. DO Power supply from mains powe ...

  • Toshiba GF632 - page 6

    - 5 - 6F8A0883 SAFETY PRECAUTIONS (continued) Safety Precautions for Maintenance and Inspection CAUTION  Do not conduct wiring work with wet hands .  Do not conduct wiring work when power is applied . DON’T Wet hands may result in electric shock . DON’T Wiring while power is applied can cause electric shock .  Do ...

  • Toshiba GF632 - page 7

    - 6 - 6F8A0883 Handling Precautions To obtain the optim um performance from the GF630/LF600F, GF630/LF610F and GF632 for years of continuous operation, observe the following precautions. (1) Do not store or install the flowmeter in: ・ Where there is direct sunlight . ・ Where there is snow and ice Infrared switches may not ...

  • Toshiba GF632 - page 8

    - 7 - 6F8A0883 Handling Precautions (continued) (6) If the inside of the converter and detector's terminal box are wetted or hum idified, it may cause insulation deterioration, which can result in fault or noise occurrence . So do not conduct wiring in the open air on rainy days . Also, be careful not to wet down the conv ...

  • Toshiba GF632 - page 9

    - 8 - 6F8A0883 Table of Contents SAFETY PRECAUTIONS ····················································································· 2 Handling Precautions ········································· ...

  • Toshiba GF632 - page 10

    - 9 - 6F8A0883 1. Product Inspection and Storage 1.1 Product Inspection GF630 series electromagnetic flowmeter is shipped in a cardboard container filled with shock-absorbing materials. Open the package carefully and check as follows:  Make sure the following items are included in the package. For the integral type (when a ...

  • Toshiba GF632 - page 11

    - 10 - 6F8A0883 2. Overview The GF630/LF600F, GF630/LF610F and GF632 electromagnetic flowmeter can be use in the following hazardous (classified) locations. Class Ⅰ , Division 2, Groups A, B, C and D, Class Ⅱ , Division 2, Groups E, F and G Class Ⅲ The GF630 and GF632 electromagnetic flowmeter m easures the volumetric ...

  • Toshiba GF632 - page 12

    - 11 - 6F8A0883 3. Names of Parts 3.1 Appearance 3.1.1 Appearance of GF630/LF600F and GF630/LF610F Note: The ground cables are included in the package, so install them to flanges as shown in the Fig.4.5 as needed. (The screws are equipped to detector flanges.) Terminal block cover Flow direction arrow Ground terminal for con ...

  • Toshiba GF632 - page 13

    - 12 - 6F8A0883 3.1.2 Appearance of Detector GF632 Note: The ground cables are included in the package, so install them to flanges as shown in the Fig.4.5 as needed. (The screws are equipped to detector flanges.) Separate Figure 3.1.2 Appearance of Detector GF632 for Excitation cable 1/2 – 14 NPT Flow direction arrow Termi ...

  • Toshiba GF632 - page 14

    - 13 - 6F8A0883 3.2 Construction of the terminal blocks 3.2.1 Terminal Block Construction of GF630/LF600F and GF630/LF610F Type For the detail of the converter, check the converter LF600F and LF610F instruction manual. 3.2.2 Terminal Block Construction of GF632 Type Separate Integral To signal cable terminal (A,B and G) To e ...

  • Toshiba GF632 - page 15

    - 14 - 6F8A0883 4. Installation Safety Precautions for Installation WARNING  Do not active live circuits under environment of explosive atmospheres. DON’T Live part of electric circuit or a high temperature department can cause explosion .  Do not use parts of other products . DON’T Protective performance degradati ...

  • Toshiba GF632 - page 16

    - 15 - 6F8A0883 CAUTION  Ground the GF630/LF600F, GF630/LF610F and GF632 independently from power equipment. (100 ohm or less ground resistance)  Use an appropriate device to carry and install the GF630/LF600F, GF630/LF610F and GF632 . DO Operating this product without grounding can cause electric shock or malfunction ...

  • Toshiba GF632 - page 17

    - 16 - 6F8A0883 4.1 Notes on Selecting the Installation Location 1. Avoid places within the immediate proxim ity of equipment producing electrical interference (such as motors, transformers, radio transmitters, el ectrolytic cells, or other equipment causing electromagnetic or electrostatic interference ). 2. Avoid places wh ...

  • Toshiba GF632 - page 18

    - 17 - 6F8A0883 (2) Preventing an Empty Pipe Condition Fix the relevant pipes installed on both sides of the det ector by attaching fittings, etc. to support the pipe. By supporting the pipes, not only the pipe vibration is reduced but also the damage to the pipes by the electromagnetic flowmeter's weight and the fluid ...

  • Toshiba GF632 - page 19

    - 18 - 6F8A0883 4.2.2 Installation Procedure In addition, in the case of detector with FEP lining, make sure to install the gaskets between grounding ring and lining. The gaskets must be installed so as not to protrude into the measurem ent tube. And install the ground cables to each flange of detector using the M5 screw as ...

  • Toshiba GF632 - page 20

    - 19 - 6F8A0883 T o mount the GF63*, place it between the upstream and downstream pipe flanges and tighten it with flange bolts and nuts. See Figure 4.5 and follow the procedure below: 1. Insert two lower mounting bolts through the clearance holes in the upstream (or downstream ) pipe flange. 2. Install a gasket next to the ...

  • Toshiba GF632 - page 21

    - 20 - 6F8A0883 Table 4.1 Bolt length and Nut tightening torque * 1 : 1 [ N ・ m] is 0.7376 [ ft ・ lbf]. ANSI class 150 Machine Bolts Meter size P.C.S Diameter Length [inch] Tightening torque [N ・ m] *1 15mm 1/2” 4 1/2” 2” 7 to 9 25mm 1” 4 1/2” 2.16” 14 to 17 32mm 1 1/4” 4 1/2” 2.16” 19 to 24 40mm 1 1/ ...

  • Toshiba GF632 - page 22

    - 21 - 6F8A0883 4.2.3 Precautions in transportation To prevent the device from being damaged during tran sportation, the original packing should be left untouched until the device arrives near the intended installation site. The detector is equipped with hanging hooks. Lift it as shown in Figure 4.5. For information on the a ...

  • Toshiba GF632 - page 23

    - 22 - 6F8A0883 4.3 Piping Connections (1) Required Upstream Straight Pipe Length If various joints are used upstream of the detector outlet, the straight pipe length as shown in Table 4.3 is required. Table 4.3 Required straight pipe length on the upstream side L: Required straight pipe length—straight pipe length plus ha ...

  • Toshiba GF632 - page 24

    - 23 - 6F8A0883 (2) Pipe Orientation The detector may be installed in horizontal, vertical or sloping pipe runs as shown in Figure 4.6. However, except for horizontal installation, fluid should flow from lower to upper directions. If no air bubble, Vertical down flow application are acceptable under pressured piping conditio ...

  • Toshiba GF632 - page 25

    - 24 - 6F8A0883 (3) Flow Direction Install the detector in accordance with the flow direction arrow on the detector. See Figure 4.8. Figure 4.9 Flow direction arrow on the detector (4) Preventing an Empty Pipe Condition Design an upright pipe run (Figure 4.9) or sufficient head pressure (Fig. 4.10) at the downstream detector ...

  • Toshiba GF632 - page 26

    - 25 - 6F8A0883 4.4 Grounding CAUTION  Do not wire cables and replace parts when power is supplied.  Do not work on piping and wiring with wet hands . DON’T Wiring work and replacing parts in the power-on state may cause electric shock. DON’T Wet hands may result in electric shock . (1) Grounding of the GF630/LF 60 ...

  • Toshiba GF632 - page 27

    - 26 - 6F8A0883 (2) Grounding of the GF632 type Ground the external grounding terminal of the detect or and the FG terminal of the converter (or external grounding terminal of the converter) securely ( grounding resistance 100ohm or lower) . Use grounding wire material of IV wire 5.5mm 2 or more. Do not share a grounding wir ...

  • Toshiba GF632 - page 28

    - 27 - 6F8A0883 5. Wiring Safety Precautions for Wiring WARNING  DO NOT DISCONNECT WHILE CIRCUIT IS LIVE UNLESS LOCATION IS KNOWN TO BE NONHAZARDOUS. DON’T Live part of electric circuit or a high temperature department can cause explosion .  Do not active live circuits While assembly of all components is not over. DO ...

  • Toshiba GF632 - page 29

    - 28 - 6F8A0883 CAUTION  Install a switch and fuse to isolate the GF630/LF600F, GF630/LF610F and GF632 fro m main s po wer.  Turn off mains power before conducting wiring work. DO Power supply from mains power can cause electric shock or circuit break-down . DO Wiring while power is applied can cause electric shock . ? ...

  • Toshiba GF632 - page 30

    - 29 - 6F8A0883 Notes on wiring CAUTION (1) The apparatus does not be provided with the cable connections. Please prepare yourself for the cable connections which could be used in Division2 hazardous locations. The cable lead –in section must be tight ened securely to keep air tightness. (2) Select the cable runs away from ...

  • Toshiba GF632 - page 31

    - 30 - 6F8A0883 5.2 External Device Connections and Grounding For the notes on connecting, wiring and installation of the combined converter, check the model num ber of the combined converter and read the inst ruction manual of the relevant converter. 5.3 Notes on Wiring 5.3.1 Notes on Instrumentation-Converter Wiring To avo ...

  • Toshiba GF632 - page 32

    - 31 - 6F8A0883 5.4 Wiring 5.4.1 Terminal Treatment of Cables Follow the procedures below to treat the terminals (at the converter side) of various cables and install the cables to the terminal block. Use appropria te cables based on the description in Section 5.1 "Cables." Crimp a round type insulated crimp-type t ...

  • Toshiba GF632 - page 33

    - 32 - 6F8A0883 (3) Connecting the input signal cable Strip the sheath from the end of each conductor of a 2- core individually shielded cable as shown in Figure 5.4. Twist those shields and cover them with a thermal contraction tube or vinyl tube not to make contact with the case or core wires. Then a ttach an M3.5 crim pin ...

  • Toshiba GF632 - page 34

    - 33 - 6F8A0883 5.4.2 Cable Connection Connect and install the terminal-treate d cables to the terminal block. *Connect the cables to the terminal block securely. A loose connection may cause incorrect measurement. After connecting a cable, try to pull it to check whether it has been connected securely. (1)Referring to combi ...

  • Toshiba GF632 - page 35

    - 34 - 6F8A0883 6. Operation Preparatory check Follow the procedure described belo w to prepare before starting the flow measurement (described with regard to the entire flowmeter). Check the items listed below  Check the wiring between the converter and related instruments .  Make sure all the bolts of connection flan ...

  • Toshiba GF632 - page 36

    - 35 - 6F8A0883 7. Maintenance and Troubleshooting Safety precaution for Maintenance and Troubleshooting WARNING  Do not disconnect while circuit is live unless location is known to be nonhazardous. DON’T Live part of electric circuit or a high temperature department can cause explosion .  Do not modify or disassembl ...

  • Toshiba GF632 - page 37

    - 36 - 6F8A0883 7.1 Maintenance  Cleaning Adhesion might be created in the detector over a long period of time when used on certain materials. Try to confirm whether to cause the adhesion in the detector pipe when the phenomenon is seen, and and an abnormality (ex. decreasing indication, etc.) is confirmed. Please clean w ...

  • Toshiba GF632 - page 38

    - 37 - 6F8A0883 7.2 Troubleshooting If a problem occurs while using the GF630/LF600F, GF630/LF610F and GF632, follow the flowcharts described below. You may find a way to solve the problem. The flowch arts are based on three symptoms (1) to (3). If you cannot solve the problem, contact your nearest Toshiba representative. 7. ...

  • Toshiba GF632 - page 39

    - 38 - 6F8A0883 7.2.2 Flow rate indicated is not correct Is the flow range correctly set? Set correctly. Refer to combined converter's manual. NO YES Is zero point correctly set? Perform the zero adjustme nt. Refer to combined converter's manual. NO YES Is the excitation current value as stated on the flow directio ...

  • Toshiba GF632 - page 40

    - 39 - 6F8A0883 7.2.3 Flow rate indication is not stable Is power supply voltage within the specified range? Use a power supply within the specified range. Are cables securely connected? Connect each cable securely to the terminal board. Is the fluid carrying bubbles? Design piping so that the fluid does not carry bubbles. I ...

  • Toshiba GF632 - page 41

    - 40 - 6F8A0883 8. Principle of Operation The operating principle of the electromagnetic flowme ter is based on Faraday's Law of electromagnetic induction and it is designed to measure the volumetric flow rate of fluid. An insulated pipe of diameter D is placed vertically to the direction of a magnetic field with flux d ...

  • Toshiba GF632 - page 42

    - 41 - 6F8A0883 9. Specifications The flowmeter specifications and the type specifi cation code used when ordering the flowme ter are described in this chapter. 9.1 Specifications Meter size: 1/2", 1", 1 1/4", 1 1/2", 2", 2 1/2", 3", 4", 5", 6", 8", 10", 12", 1 ...

  • Toshiba GF632 - page 43

    - 42 - 6F8A0883 Connection flange standard: See Table 9.2 Type Specification Code. Principal materials Case Carbon steel Lining FEP (standard for meter sizes 15 to 250mm) PTFE (standard for meter sizes 300 to 600mm) Polyurethane (PU) (standard for meter sizes 15 to 400mm) Chloroprene rubber (CR) (standard for meter sizes 450 ...

  • Toshiba GF632 - page 44

    - 43 - 6F8A0883 Calibration range : I t c a l i b r a t i o n b y s t a n d a rd Range shown in the table below when Range is not specified. It calibration when there is sp ecification by flowing quantity Range in which the customer is specified. Is this specification Range flowing quantity of Figure 9.1. Please confirm beco ...

  • Toshiba GF632 - page 45

    - 44 - 6F8A0883 To select the meter size: See Figure 9.2 and find meter si zes within the velocity of 0.1 to 10 m/s for a specified full-scale (measuring range high limit) flow. Select one that has its full-scale velocity between 1 and 3 m/s. Make sure the full-scale flow rate used for the final planning stage stays within 1 ...

  • Toshiba GF632 - page 46

    - 45 - 6F8A0883 Flow velocity range Flow volume Meter size 0.328ft/s 0.98ft/s 3ft/s 10ft/s 32.8ft/s 1/2 inch 0.2801 gal/min 0.8403 gal/min 2.561 gal/min 8.538 gal/min 28.01 gal/min 1 inch 0.7781 gal/min 2.334 gal/min 7.115 gal/min 23.72 gal/min 77.81 gal/min 1 1/4 inch 1.275 gal/min 3.824 gal/min 11.66 gal/min 38.86 gal/min ...

  • Toshiba GF632 - page 47

    - 46 - 6F8A0883 9.2 Type Specification Code Table 9.2 Type Specification Code Model number Specification code Lining 1 2 3 4 5 6 7 8 9 10 11 12 Contents G F 6 3 Flanged connection electromagnetic flowmeter detector PU CR FEP PTFE 0 2 Integral type Separate type ● ● ● ● ● ● ● ● 0 0 0 0 0 0 0 1 1 1 2 2 3 3 4 4 ...

  • Toshiba GF632 - page 48

    - 47 - 6F8A0883 10. Outline Dimensions 10.1 Outline dimensions of GF630/LF600F and GF630/LF610F (1) Meter size of 1/2 inch to 6 inch (15mm to 150mm) (1) Meter size of 1/2 inch to 8 inch (15mm to 200mm) NOTES (1) For the detail dimention of conveter, check the converter LF600F and LF610F instruction ma nual. L3 ±5 (mm) Mass ...

  • Toshiba GF632 - page 49

    - 48 - 6F8A0883 (2) Meter size of 8 inch to 24 inch (200mm to 600mm) NOTES *1) L1 of PTEF Lining contains the thickness of grounding rings. *2) Mass of PTFE Lining contains the mass of grounding rings. (1) For the detail dimention of conveter, check the converter LF600F and LF610F instruction ma nual. Mass Approx. (kg) L3 ± ...

  • Toshiba GF632 - page 50

    - 49 - 6F8A0883 10.2 Outline dimensions of GF632 (1) Meter size of 1/2 inch to 6 inch (15mm to 150mm) Separate L3 ±5 (mm) Mass Approx. (kg) Meter Size L1 ±6 (mm) L2 ±5 (mm) ANSI 150 ANSI 150 15mm 1/2" 200 172 216 5 25mm 1" 200 182 236 6 32mm 1 1/4" 200 187 246 7 40mm 1 1/2" 200 192 256 8 50mm 2" 2 ...

  • Toshiba GF632 - page 51

    - 50 - 6F8A0883 (2) Meter size of 8 inch to 24 inch (200mm to 600mm) *1) L1 of PTEF Lining contains the thickness of grounding rings. *2) Mass of PTFE Lining contains the mass of grounding rings. Mass Approx. (kg) L3 ±5 (mm) PU, CR and FEP PTFE Meter Size L1 ±6 (mm) L2 ±5 (mm) ANSI 150 ANSI 150 ANSI 150 200m m 8" 350 ...

  • Toshiba GF632 - page 52

    - 51 - 6F8A0883 10.3 Outline dimensions of Grounding ring Option for Polyurethan, CR and FEP *1) When the grounding ring will apply to the FEP lining, please attach the gasckets between the grounding ring and lining. (Refer to Fig 4.4.) Meter size ANSI 150 (Unit: inch) JIS 10K (Unit: mm) inch mm Φ D1 Φ D2 T N Φ D1 Φ D2 T ...

  • Toshiba GF632 - page 53

    - 52 - 6F8A0883 Appendix 1 1-1 A system block diagram for GF630/LF600F and GF630/LF610F ...

  • Toshiba GF632 - page 54

    - 53 - 6F8A0883 1-2 A system block diagram for GF632 ...

  • Toshiba GF632 - page 55

    - 54 - 6F8A0883 USER'S FORM N O T E S Write down the address and phone number of the dist ributor from which you purchased this product, the product code, SER.NO. and so on. Distributor Address N a m e Phone number ( ) - Product code GF S E R . N O . ...

  • Toshiba GF632 - page 56

    6F8A0883 ...

Manufacturer Toshiba Category Automobile Parts

Documents that we receive from a manufacturer of a Toshiba GF632 can be divided into several groups. They are, among others:
- Toshiba technical drawings
- GF632 manuals
- Toshiba product data sheets
- information booklets
- or energy labels Toshiba GF632
All of them are important, but the most important information from the point of view of use of the device are in the user manual Toshiba GF632.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Toshiba GF632, service manual, brief instructions and user manuals Toshiba GF632. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Toshiba GF632.

Similar manuals

A complete manual for the device Toshiba GF632, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Toshiba GF632 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Toshiba GF632.

A complete Toshiba manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Toshiba GF632 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Toshiba GF632, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Toshiba GF632, that we can find in the current document
3. Tips how to use the basic functions of the device Toshiba GF632 - which should help us in our first steps of using Toshiba GF632
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Toshiba GF632
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Toshiba GF632 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Toshiba GF632?

Use the form below

If you did not solve your problem by using a manual Toshiba GF632, ask a question using the form below. If a user had a similar problem with Toshiba GF632 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)