-
Emerson 300 - page 1
381333–289 C 50 Hanove r Road, F lorham Park, New J ersey 07932–1591 USA For sales or service call 1 800 800–2726 (A SCO ) www.ascopower .com AS CO PO WER TECH NO LOGI E S CA NA DA PO Box 1238, 17 Airport R oad, Brantf ord, O ntario, Can ada N 3T 5T3 Operator’s Manual Seri es 300 Automatic T ransfer S witc hes J–de si gn, 600 A DANGER is ...
-
Emerson 300 - page 2
...
-
Emerson 300 - page 3
Namepl ate The T rans fer Switch nam epla te incl udes data for each sp ecific A SCO S eries 300 A TS. Use the A TS only wit hin the limits show n on this namep late. Ca talog Num ber Identif icatio n A typ ica l C ata l og Numbe r i s s hown be lo w wi th i ts elements ex plained . The ex ample is for a Series 300 A T Sw i t hs w i t c h e dn e u ...
-
Emerson 300 - page 4
...
-
Emerson 300 - page 5
SECT ION 1 INST ALLA TION 1 --- 1 Series 300 A utomatic T ransfer Sw itches are fac tory wired an d tested. Install ation requir es skid rem oval then sec urin g the enc los ure to the s uppor ting foundation. Remove th e Shipping S kid Open the fr ont door and rem ove the four l ag sc rews ( 2 in front, 2 i n rear) securing enc losure to the wood ...
-
Emerson 300 - page 6
ter min al b lock f or e ngin e s ta rt a nd auxiliary ci rcuit connections left s id e of transfer switch COMMON FEA TU RE 7 closes to start FEA TU RE 8 open s to star t COMMON FEA TU RE 14B closed on em ergenc y FEA TU RE 14A clos ed on nor mal COMMON FEA TU RE 14BA closed on em ergenc y FEA TU RE 14AA clos ed on nor mal Engi ne Sta rti ng Sig na ...
-
Emerson 300 - page 7
INST ALLA TION (cont inued) 1 --- 3 F unctio nal T est The F unctional T est consists of thr ee chec ks: manual operation, v oltage chec ks, and el ectrical operation. NOT ICE Do these checks in the order presented to avoid damaging the auto matic transfer s witch. R ead all instructions on the W iring Diagram and labels affixed to the autom atic t ...
-
Emerson 300 - page 8
INST ALLA TION (cont inued) 1 --- 4 Fi gure 1 -4 . Maintenance handle o peration and co ntact positi on indic ators. observe these l ights Figure 1–5. Standard contro ls and indicato rs. 2–V o l t a g eC h e c k s First check nameplate on tra nsfer swi tch; rated voltage m u s tb et h es a m ea sn o r m a la n de m e r g e n c yl i n e voltages ...
-
Emerson 300 - page 9
INST ALLA TION (cont inued) 1 --- 5 p r e s st h i sb u t t o n observe these l ights Figure 1–6. Standard contro ls and indicato rs. 3 – Electrica l Opera tion Th i s pr oce du re wi ll che ck t he e le ctr ica l o pe ra ti o n o f the A utomatic T ransfe r Switch. See Figure 1–6. Close th e transfe r switc h encl osure door a nd tighten t h ...
-
Emerson 300 - page 10
Hol d 15 sec .t o start t he engine generator and to transf er the load to emergency . Press to cancel the active exercise period (sto ps engine now or afte r cooldow n) Se e page 5– 1. Hol d 5 sec .t os e t 20 min. engine ex ercise perio d immediately (engine starts) and weekly thereaf ter . ³ blinks sl owly when button is r eleased (set) and d ...
-
Emerson 300 - page 11
SECT ION 3 TEST ING & SERVIC E 3 --- 1 PREV ENTIV E MAIN TENAN CE F or high rel iabil ity and long l ife for the A TS: Ope rate t he sw itc h at l east o nce a mo nth .P e r f o r m t h i s 4–step Electrical Operat ion T e st (te st with load t ransfer). T r ansfer Swi tch T est 1. Press and ho ld the door -mounted T ra nsfer T est button unt ...
-
Emerson 300 - page 12
TEST ING & SERVIC E (continued) 3 --- 2 MANUAL L OAD TR ANSFER This pr oced ure w ill m anual ly tr ansfer th e load if th e cont ro lle r is d i sco nne ct ed . Do no t manually operate the transfer switch until bot h power so urces are disconnected: open bot h circuit breakers . 1. Open normal and emergency source ci rcuit brea kers. 2. Use t ...
-
Emerson 300 - page 13
SECT ION 4 ADJUST MENTS 4 --- 1 Ti me De l a y Ad j u st m e n t Standard ti me delays are set to customer specificati ons (if none specif ied, st andard factory set tings are used). T o change a setting, follow proc edure on page 4-2. Use T abl e 4-1 as a gu ide to time del ay values and their c or- responding adjustment DIP switch or potentiomete ...
-
Emerson 300 - page 14
ADJUST MENTS (continued) 4 --- 2 NOT ICE Do not make any set ting changes while the contro ller is energized. How to Change a Setti ng 1. Prev ent the transfer switch from operating b y discon- nec ting one s ourc e first, then the o ther, as fol low s: a. If the transfer s witch is in the No rmal p osition, ope n t he e mer gen cy so urce ci r cui ...
-
Emerson 300 - page 15
SECTION 5 CONTROL FEA TURES – ENGINE EXER CISERS 5 --- 1 These timer s periodic ally exer cise the em ergenc y engine-g enerator p lant. They can be s et to exercise w ith or withou t load tr ansfer, or they can b e compl etely disab led. The engine-gen erator shoul d be exercised u nder load on ce a week for a minimum time period of 20 minutes, ...
-
Emerson 300 - page 16
CONTRO L F EATURES (continued) 5 --- 2 Opt ion al Ac ce ssory 11BG – SOURCE A VAILABILITY SIG NAL & P ROGRAMMA BLE EN GINE EX ERCIS ER MOD ULE 2–line display 3 buttons connectio ns for source ava ila bilit y signal co ntacts Figure 5–2. Accessory 11BG modul e (mounted behind operato r interface and connected to the co ntroll er) incl udes ...
-
Emerson 300 - page 17
Fa s t/ Sl o w A d j u st Dayl ight Savi ng Time A dju st Date Time Start T Ime Engine Exerciser Run TIm e CONTRO L F EATURES (continued) 5 --- 3 How to Set Option a l Progra mm ab le En gin e Exe rcis er (p art o f Acc. 11BG m od ule) Haza rdous vol tage ca pabl e of causin g shock, burns, o r death is used in this t ransfer switch. Deenergize bo ...
-
Emerson 300 - page 18
CONTRO L F EATURES (continued) 5 --- 4 INPHASE M ONITOR FOR M OTOR LOAD TR ANSF ER Inphase monitori ng logic con trols tr ansfer and retransfe r of motor loads, so that inrush current s do not exceed normal starti ng currents. It a voids nuisance tripping of cir cuit breakers and m echanic al damag e to mot or co up li ngs . The Motor Load T ransfe ...
-
Emerson 300 - page 19
CONTRO L F EATURES (continued) 5 --- 5 OPTIONAL STR IP HEA T ER (Accessor y 44) A cc essory 44 Str ip Heater is design ed to keep ambient temp eratures within the A utomatic T ransfer Switc h en closu re a t a ccep ta ble le ve ls. Th is a cces so ry co nsi s ts of a mounting bra cket with strip heat er, thermosta t, and terminal block. A transform ...
-
Emerson 300 - page 20
INDEX Printed in U .S.A. Copy right - - - ASC O Power T echn ologies, L.P . 2011 A accessories, 5–2, 5–5 auxil iary cir cuits , 1–2 B battery , 4–2, 5–1 buttons, push, 3–1 bypass time delay, 1–5, 2–1, 3–1 C cable lugs, 1–1 prepar ation, 1–1 cat alo g nu mber, in si de co ve r cleaning, 3–1 connections engine control contact, ...
Haben Sie eine Frage bezüglich Emerson 300?
Nutzen Sie das untere Formular
Wenn Sie mit Hilfe der gefundenen Bedienungsanleitung Ihr Problem mit Emerson 300 nicht gelöst haben, stellen Sie eine Frage, indem Sie das untere Formular nutzen. Wenn einer der Nutzer ein ähnliches Problem mit Emerson 300 hatte, ist es möglich, dass er mit Ihnen die Lösung teilen möchte.