Manual de instrucciones QHT B3-B9

36 de páginas 0.76 mb
Descargar

Pasar a la página of 36

Summary
  • QHT B3-B9 - page 1

    Page 1 WHAT TO DO IF YOU SMELL GAS · Do not try to light any appliance · Do not touch any electric switch; do not use any phone in your building · Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions. · If you can not reach your gas supplier call the fire department Installation and service must ...

  • QHT B3-B9 - page 2

    Page 2 Dear Customer: Thank you for buying a QHT BIASI B10 Series Boiler. The QHT BIASI B10 Series Boiler is a cast iron, oil or gas fired hot water boiler, using the famous BIASI B10 (3-pass) design. The boiler is light, compact, sim ple, rugged and engineered for maximum home heating efficiency. We realize that it is not po ssible to answer all q ...

  • QHT B3-B9 - page 3

    Page 3 TABLE OF CONTENTS QHT BIASI B10 Series Section Page Important Information & Warnings 4,5,6 General Information 1 7 Boiler Block Assembly & Explosion Diagram 2 8 Boiler Location 3 9 Installation of Boiler Trim Kit Components 4 10,11 Piping the Boiler 5 12 Intake Venting 6 13,14 Exhaust Venting 7 15 Common Exhaust Venting 7.1 15,16 Blo ...

  • QHT B3-B9 - page 4

    Page 4 IMPORTANT INFORMATION Please read this page carefully. • ALL BOILERS MUST BE INSTALLED IN ACCORDANCE WITH NA TIONAL, STATE AND LOCAL PLUMBING, HEATING A ND ELE CTRICAL CO DES AND ORDINANCES, AS WELL AS TH E REGULATIONS OF THE SERVING ELEC TRICAL, WATER AND GA S UTILITIES. • All systems should be designed by comp etent contractors, and on ...

  • QHT B3-B9 - page 5

    Page 5 Any appliance that burns natur al gas, propane gas, fuel oil, or coal is capable of producing carbon monoxide (CO). Carbon Monoxide (CO) is a gas which is odorless, colorless and tasteless but is very toxic. CO is lighter than air and thus may travel throughout the building. BRIEF EXPOSURE TO HIGH CONCENTRATIONS OF CO, OR PROLONGED EXPOSURE ...

  • QHT B3-B9 - page 6

    Page 6 TO START UP THE APPLIANCE 1. STOP! Read the safety information on th e side of the boiler. DO NOT START THE BOILER UNLESS ALL CLEANO UT DOORS ARE SECURED AND SEALED. (Skip to step 9 for oil burning boilers) 2. Set thermostat to lowest setting 3. Turn off all electric power to the appliance 4. Do not attempt to light the burner by hand 5. Tur ...

  • QHT B3-B9 - page 7

    Page 7 The BIASI B 10-series boilers are wet base design, sectional, cast-iron boilers for forced hot water heating systems. The bo ilers are shipped pre-assembled from the factory in lengths from three to nine sections. They are designed for firing with oil or gas power burners, which are pa cked separately along with the jacket and controls for s ...

  • QHT B3-B9 - page 8

    Page 8 All QHT BIASI B10 Series Boilers are shipped from the factory in assembled boiler blocks. If, however, the block needs to be split into sections for ease of delivery, please read the following: To assemble split blocks, move sect ions into parallel and facing each other. Sections may be slid along boards placed underneath the sections. Inspe ...

  • QHT B3-B9 - page 9

    Page 9 If the boiler is to be installed in a "direct vent" configuration, pl ease refer to the B10 Direct Vent Addendum supplied with the Direct Vent Kit. PROVISIONS FOR COMBUSTION AIR A ND VENTILATION AIR MUST BE IN ACCORDANCE WITH SECTION 5.3, “AIR FOR COMBUSTION AND VENTILATION”, OF THE NATIONAL FU EL GAS CODE, ANSI Z223.1, OR APPL ...

  • QHT B3-B9 - page 10

    P USE ONLY THE ULC LISTED BOILE R CO MPON ENTS AND UL/CSA LISTED OIL OR GAS BU RNER COMPONENTS SUPPLIED WITH THE QHT BIASI B10 SERIES BOILER SYSTEM. Please refer to figur es below for Barometric Damper location for either oil or gas and to the next page for the proper lo cation of the trim components. 4. Installation of Boiler T rim Components NOTE ...

  • QHT B3-B9 - page 11

    Page 11 3X 27 2X 4 1 2 22 Ø6 Exhaust Breeching 3 3 4 Ø1 1 2 Supply T apping Ø 3 4 PRV or Hi Limit Control Tapping Ø 3 4 Hi Limit Control or PRV Tapping Ø 3 4 Alternative Boiler Drain Tap pin g Ø1 1 2 Return Tapping Ø 3 4 Boile r Drain Tappi ng Ø 1 2 Pressure/Tempe rature G ua ge Ta pping Ø 3 4 Alternative Boile r Drain Tapp ing Ø3 1 2 Bur ...

  • QHT B3-B9 - page 12

    Page 12 SAFETY RELIEF V AL VE 1. The safety relief valve should be piped into one of the two upper tapings in the rear of the boiler 2. The relief valve should be installed us ing the hardware suppli ed in the trim kit without valving between t he PRV and the boiler. 3. Pipe the discharge for t he safety relief valve with copper tube to within four ...

  • QHT B3-B9 - page 13

    Page 13 6. Int a ke V enting 1. Be certain adequate air is available for combustion and ventilation. a.) Boiler located in unconfined space: Installation in large areas, such as basements, can usually be assumed to provide sufficient air. b.) Boiler located in confined space : (See Figure A.) If all air for combustion and ventilation is to come fro ...

  • QHT B3-B9 - page 14

    Page 14 c.) Boiler located in a room under negative pressure: If the boiler is to be installed within a home where the oper ation of exhaust fans, attic fans, kitchen ventilation system s, clothes dryers or fireplaces may create severe negative vent pressures causing unsatisfactory combustion and venting, special provisions should be made for addit ...

  • QHT B3-B9 - page 15

    Page 15 The B10 boiler is a high efficiency unit that requires proper venting. The boiler must be vented to the outdoors by means of a tile lined masonry or a approved pre-fabricated chimney of the size and height recommended by the manufacturer or by a listed "power venting" unit which provides draft by mechanica l means. In many install ...

  • QHT B3-B9 - page 16

    Page 16 3.Insofar as practical, close all bu ilding doors and windows and all doors between the space in which the appliance rema ining connected to the common venting system is located and other spaces of t he b uilding . Turn on any appliance not connected to the common vent system. Turn on all exhaust fans except for summer exhaust fans. Close t ...

  • QHT B3-B9 - page 17

    Page 17 For boilers connected to gas vents or chim neys, vent installations shall be in accordance with part 7, Venti ng of Equipment, of the Nati onal Fuel Gas Code, ANSI Z223.1 or Section 7, Venting Systems and Air Supply for Appliances, of the CAN/ CGA B149, Installation Codes , or applicable provisions of the local building codes. Vent connecto ...

  • QHT B3-B9 - page 18

    Page 18 Good, reliable operation with a minimum of service, starts with attention to the small details: Oil: 1. Setting the nozzle position and electrodes "by the book" using the manufacturer's gauges. 2. Installing a quality micr on filter at the burner. 3. Making careful/tight flare connections, without couplings, on oil suction li ...

  • QHT B3-B9 - page 19

    Page 19 BURNE R M ANUF ACTURE R: B eckett N X B o i l er M od el B -3 B -4 B -5 B -6 Burner M odel N E C - 1102* N E C -1101* N E C -1101* N E C -1103* F iri ng R ate 0.55 0.90 1.00 1.20 I ns er ti on D epth 3.50" 6.00" 6.00" 6.00" N oz z l e 0.50 X 60 0.65 X 60 0.75 X 60 0 .90 X 60 S p r a y P a t t er n h o l l o w so l i d so ...

  • QHT B3-B9 - page 20

    Page 20 To determine how much gas is coming into the burner, or to set the ga s meter correctly, the following formula can be used. The chart to the right can be used to determine the flow rate depending upon the time per revolution and the size of the gas meter dial. Ft 3 /hr = [3600/(sec. Per rev. )]*(Size of gas meter) Size of Gas Meter Dial (Cu ...

  • QHT B3-B9 - page 21

    Page 21 Gas supply piping is to be sized and inst alled properly in order to provide a supply of gas sufficient to meet th e maximum demand with out undue loss of pressure between the meter and t he boiler. Consult with the National Fuel Gas Code ANSI Z223.1 for proper sizing of gas piping for various lengths and diameters. Locate a drop pipe adjac ...

  • QHT B3-B9 - page 22

    P NOTE: All piping, boiler controls, gauges and valves should be installed before the jacket is assembled on the boiler. Belo w is an explosion view of the boiler and jacket assembly to clarify these boiler ja cket a ssembly instructions. Insert the separate (loose) piece of insulation on top of boiler with the foil side facing in so the entire top ...

  • QHT B3-B9 - page 23

    Page 23 The electricity to the boiler shall come fr om a dedicated breaker in the electric service box. A service switch should be mounted on the side of the boiler so the burner technician can service the burner and controls. The electrical wiring should be routed so as not to interf ere with normal servicing of t he boiler. Wiring done in the fie ...

  • QHT B3-B9 - page 24

    Page 24 If you received a Honeywell 7248U with your Bi asi boiler, you will need to make the changes shown above, and described below to the wiring diagrams. 1. Run wire 1 to the L1 terminal on the 7248U instead of running wire 1 to the 4006A. 2. Run wire 2 to the L2 terminal on t he 7248U instead of connecting to wire 4. 3. Run wire 4 to the B2 te ...

  • QHT B3-B9 - page 25

    Page 25 NOTE: All wiring must be done in accordance with applicable state, local and national codes. Use only copper conductors. LINE HONEYWELL 7248U BLACK WHITE BROWN YELLOW RED RIELLO OIL BURNER, CS HEATMANAGER, 7248U CONTROL WIRING 1 1. Oil Burner Wiring ...

  • QHT B3-B9 - page 26

    Page 26 NOTE: All wiring must be done in accordance with applicable state, local and national codes. Use only copper conductors. RIELLO OIL BURNER, SR504, CONTRO L WIRING WITH DHW PRIORITY ...

  • QHT B3-B9 - page 27

    Page 27 NOTE: All wiring must be done in accordance with applicable state, local and national codes. Use only copper conductors. RIELLO OIL BURNER, AZ-4P, CONT ROL WIRING WITH DHW PRIORITY ...

  • QHT B3-B9 - page 28

    NOTE: All wiring must be done in accordance with applicable state, local and national codes. Use only copper conductors. Page 28 CARLIN OIL BURNER, SR501, CONTRO L WIRING WITH DHW PRIORITY ...

  • QHT B3-B9 - page 29

    Page 29 NOTE: All wiring must be done in accordance with applicable state, local and national codes. Use only copper conductors. BECKETT NO/AFII OIL BURNER, ARM-4P, CONTROL WIRING WITH DHW PRIORITY ...

  • QHT B3-B9 - page 30

    Note 2: All wiring must be done in accordance w ith applicable state, local and national codes. Use only copper conductors. Page 30 1 1.2 Gas Diagrams HEATWISE SU-2A, SR503, CONTROL WIRING WITH DHW PRIORITY ...

  • QHT B3-B9 - page 31

    NOTE: All wiring must be done in accordance with applicable state, local and national codes. Use only copper conductors. Page 31 RIELLO GAS BURNER, AR861-2II,CONT ROL WIRING WITH DHW PRIORITY ...

  • QHT B3-B9 - page 32

    Page 32 Before a gas boiler may be put into operation and tested, it’s gas connection must be leak tested. After installa tion of oil/gas-fired boiler, operation and performance tests shall be conducted to make certain that the burner is operating in an acceptable manner and that all safety contro ls and devices function properly. It is critical ...

  • QHT B3-B9 - page 33

    Page 33 System Checkout: Boiler Model No._________________ Serial No.__________ Original Purchaser: Installer: _________________________ ______________________ _________________________ ______________________ _________________________ ______________________ Burner Manufacturer------- ---- Type of Oil Burn er------------- Burner Model No.----------- ...

  • QHT B3-B9 - page 34

    Page 34 ...

  • QHT B3-B9 - page 35

    Page 35 ...

  • QHT B3-B9 - page 36

    Page 36 FIRST YEAR-WAR RANTY FOR B10 S ERIES RESIDE NTIAL HOT WATER BOILERS: QHT warrants that its cast-iron boiler and casing are free from defects in material and workmanship for one year from the date of installation. If the boiler is found to be defective within this period, QHT will replace the boiler block or casing. LIFETIME WARRANTY-WARRANT ...

Fabricante QHT Categoría Boiler

Los documentos del dispositivo QHT B3-B9 que obtenemos del fabricante se pueden dividir en varios grupos. Entre ellos están::
- dibujos técnicos QHT
- manuales de instrucciones B3-B9
- hojas de producto QHT
- folletos informativos
- o etiquetas energéticas QHT B3-B9
Todos son importantes, pero lo más importante desde el punto de vista del usuario de un dispositivo lo encontraremos en el manual de instrucciones QHT B3-B9.

Un conjunto de documentos determinado como manual de instrucciones se divide también en tipos más detallados, tales como: instrucciones de montaje QHT B3-B9, instrucciones de servicio, instrucciones cortas o instrucciones de usuario QHT B3-B9. Dependiendo de la situación debes buscar el documento que necesitas. En nuestra página puedes consultar el manual de instrucciones más popular del producto QHT B3-B9.

Manuales de instrucciones parecidos

El manual de instrucciones del dispositivo QHT B3-B9, ¿cómo debería ser?
El manual de instrucciones, también determinado como el manual de usuario o simplemente instrucciones, es un documento técnico que tiene como objetivo ayudar a los usuarios a utilizar QHT B3-B9. Las instrucciones normalmente las realiza un escritor técnico pero en un lenguaje comprensible para todos los usuarios de QHT B3-B9.

El manual de instrucciones completo de QHT debe contener unos elementos básicos. Una parte de ellos es menos importante, como por ejemplo: la portada / la página principal o las páginas de autor. Sin embargo, lo demás debe facilitarnos la información más importante desde el punto de vista del usuario.

1. Introducción y pistas sobre cómo orientarse con el manual QHT B3-B9 - Al principio de cada manual se deben encontrar las indicaciones acerca de la manera de usar un manual de instrucciones. Debe contener información sobre dónde encontrar el índice QHT B3-B9, preguntas frecuentes o problemas más comunes – son los apartados más buscados por los usuarios de cada manual de instrucciones.
2. Índice - listados de todos los consejos acerca de QHT B3-B9 que encontraremos en el documento
3. Consejos de uso de las funciones básicas del dispositivo QHT B3-B9 - que deben facilitarnos los primeros pasos durante el uso de QHT B3-B9
4. Troubleshooting - una secuencia sistematizada de acciones que nos ayudará a diagnosticar los problemas más importantes con QHT B3-B9
5. FAQ - las preguntas frecuentes
6. Datos de contacto Información acerca de cómo encontrar los datos de contacto del fabricante / servicio de QHT B3-B9 en cada país si no somos capaces de solucionar el problema por nuestra cuenta.

¿Tienes una pregunta acerca de QHT B3-B9?

Utiliza el formulario que se encuentra abajo

Si con la ayuda del manual de instrucciones encontrado no has podido solucionar tu problema con QHT B3-B9, haz una pregunta utilizando el formulario que se encuentra abajo. Si alguno de los usuarios ha tenido un problema parecido con QHT B3-B9 probablemente compartirá una forma de solucionarlo.

Copia el texto de la imagen

Comentarios (0)