Manuel d’utilisation Energy Tech Laboratories MR212

28 pages 0.94 mb
Télécharger

Aller à la page of 28

Summary
  • Energy Tech Laboratories MR212 - page 1

    May 2008 Rev. 11 FOR YOUR SAFETY The use and storage of gasoline or other flammabl e vapors and liquids in open containers in the vicinity of this appliance is hazardous . Standard and Modular Direct Fired Heaters Installation, Operation, and Maintenance Manual Modular Direct Fired Heater Standard Direct Fired Heater Direct Fired Module Save these ...

  • Energy Tech Laboratories MR212 - page 2

    ...

  • Energy Tech Laboratories MR212 - page 3

    3 TABLE OF CONTENTS WARRANTY ...................................................................................................................... ............................ 4 INSTALLA TION .................................................................................................................. ........................... 5 Mechanical . ...

  • Energy Tech Laboratories MR212 - page 4

    4 WARRANTY This equipment is warranted to be free from defe cts in materials and workmanship, unde r normal use and service, for a period of 12 months from date of shipm ent. This warranty shall not apply if: 1. The equipment is not installed by a qualifi ed instal ler per the MANUFA CTURER’S installation instructions shipped with the product, 2. ...

  • Energy Tech Laboratories MR212 - page 5

    5 INSTALLATION It is imperative that this unit is in stalled and ope rated with the designed airflow, gas, and electrical supply in accordance with this manual. If there are any questions about any items, please call the service department at 1-866-784-6 900 for warranty and technical support issues. Mechanical WARNING: DO NOT RAISE VENTILATOR BY T ...

  • Energy Tech Laboratories MR212 - page 6

    6 Recom men ded Suppl y Du ctwork Sizes Bl ower Si ze Duct Size St rai ght Duct Lengt h 10 14 x 14 48 i n. 12 16 x 16 54 i n. 15 20 x 20 72 i n. 18 24 x 24 86 i n. 20 26 x 26 108 i n. 25 32 x 32 168 i n. through vertical portion of the ventilator ba se assembly flange using a minimum of eight (8) lug screws, an chor bolt s, or ot her suita ble fast ...

  • Energy Tech Laboratories MR212 - page 7

    7 Direct Fired Module Installation Indoor (INLINE) Installation Heat Module Add-On Installation Modular heat units shippe d to add heat onto existin g blower only application s require field mechanical and wiring installation. 1. Remove existing filter intake and lifting lugs from blower section in take side. 2. Attach heat module to blower intake ...

  • Energy Tech Laboratories MR212 - page 8

    8 Gas Pressure Table Gas Pressure Type Gas Pressure Size 1-3 Inlet Pressure 7 in. w.c. – 14 in. w.c. Size 4-5 Inlet Pressure 7 in. w.c. – 5 psi. Max. Manifold Pressure - Natural Gas 5 in. w.c. maximum Max. Manifold Pressure - Propane 2.5 in. w.c. maximum Gas Connection Sizes Unit Size Gas Pipe Size (NPT) Size 1 ¾” Size 2 1” Size 3 1” Siz ...

  • Energy Tech Laboratories MR212 - page 9

    9 Copper Wire Ampacity Wire Size AWG Maximum Amps 14 20 12 25 10 30 8 40 6 55 4 70 Electrical Before connecting powe r to the heater, read and understand this entire section of this docume n t. As-built wiring diagrams are furnished with each fan b y the factory, and are atta ched to the door of the unit. Electrical wiring and connections should be ...

  • Energy Tech Laboratories MR212 - page 10

    10 Remote Control Panel On units shipped with the optional remote control panel , an ele ctrical drop containing th e panel wiring is provided with the heate r. There is a terminal strip in side the remote panel th at matches the terminals in the heater unit. The remote panel shoul d be wired as shown below. BL YW RD BK PK RD WH OR BR GY BK RD YW P ...

  • Energy Tech Laboratories MR212 - page 11

    11 Pilot Assembly OPERATION Prior to starting up or operating the heater, che ck al l fasteners for tightness. In particular, che ck the set screw in the wheel hu b, bearings and t he fan sheaves (pulleys). With power and gas to the heater OFF or prior to connecting ventilator to po wer, turn the fan whee l by ha nd to be sure it is not st riking t ...

  • Energy Tech Laboratories MR212 - page 12

    12 Maxitrol M511 and M611 Low Fire Bypass Screw Mod Valve Voltage Summary Volts DC Firing Mode 0 to 5 VDC Low Fire 5 to 15 VDC Modulation 15 to 20 VDC High Fire Maxitrol MR212 Lo w Fire Bypass Scre w Average Man ifold Pressure vs. Firing Rate/Ft. of Bu rn er -1.0 0 0.00 1.00 2.00 3.00 4.00 5.00 6.00 0 100000 2000 00 300000 400000 50000 0 600000 Fi ...

  • Energy Tech Laboratories MR212 - page 13

    13 Adju st pilot flame. Lock u ni t in to hig h f i re. Ad ju s t incomi ng gas pressur e. Doe s h igh fi re pr oduce at least a 70°F temp rise an d produce the correct m anifold pressu re? A djust h igh fire No Lock unit in to low fire. Yes Does thin flame fill ent i re b urne r le ngt h? Adju s t low fire. Sett in g i n comi ng p ressure: Presur ...

  • Energy Tech Laboratories MR212 - page 14

    14 Maximum RPM and HP Chart Blower Size Maximum RPM Maximum HP 10” 1800 2 12” 1500 3 15” 1400 5 18” 1200 5 20” 1000 10 25” 900 20 Pulley Adjustment Illustration Pulley Setscrew Torque Thread Size Torque (IN/Lb) No. 10 (bushing) 32 1/4” (bushing) 72 5/16” 130 Final Start Up Procedure 1. With the air and burner systems in full operati ...

  • Energy Tech Laboratories MR212 - page 15

    15 Pulley Combination Chart Motor RPM 1725 1/3 to 1-1/2 H P MOTOR PULL EY Dd1 Dd2 Pd1 Pd2 AX BELTS 1VL34 1.9 2.9 2 3 Open Closed BLOWER PULLEY DATUM DIAMETER PITCH DI A METER 5 4 1/2 4 3 1/2 3 2 1/2 2 1 1/2 1 1/2 0 AK114 11 11.2 308 323 339 354 370 385 400 416 431 447 462 1/3 to 2 HP MOTOR PULL EY Dd1 Dd2 Pd1 Pd2 AX BELTS 1VL40 2.4 3.4 2.6 3.6 Open ...

  • Energy Tech Laboratories MR212 - page 16

    16 Flame Safety Controller Air Flow Switch DC Flame Signal DC Voltage Flame Status 0 to 5 VDC No Flame 6 to 11 VDC Weak Flame 12 to 18 VDC Strong Flame Sequence of Operation The direct-fired heater is most easily understood wh en broken down into smaller individual system s. There are two main systems, a make -up air fan and a heater. T he make-up ...

  • Energy Tech Laboratories MR212 - page 17

    17 Maxitrol 14 Amplifier High Temperature Limit airflow switch to close. The high airflo w switch prot ects against profile plate fail ures that cause excessive airflow through the burne r. In the ev ent that the pressure drop across th e burner is not in the range of the airflow switch, gas flow to the burne r is stopped by the Flame Safety Contro ...

  • Energy Tech Laboratories MR212 - page 18

    18 9 Begins Pilot Trial For Ignition and turns on PTFI LED 9 The pilot g as solenoid valve is opene d, the sp ark igniter begins spar king, and the flamerod sensor watches for flame initiation 9 When flame is establishe d, the FLAME LED is illuminated and m a in valve opens and the FSC powers the Maxitrol system and gas flow begin s modulating 9 Th ...

  • Energy Tech Laboratories MR212 - page 19

    19 Components The following image and list outlines the typical di rect fired heater components and their fun ctions. 1. Gas Inlet – Main gas supply conn ection 2. Motor Starter – Contactor with overload protec tion to start and prot ect motor. 3. Freeze-Stat Thermosta t (Optional) – De-energizes blo wer motor if the discharge air temperature ...

  • Energy Tech Laboratories MR212 - page 20

    20 Remote Panel Option The Remote Panel is a device used to control the ope r ation of the heater from a remote location. This unit is available in both a “2 Position” or “3 Position ” configuration and with or with out a cooling output. It also will accommodate both the Maxitrol discharge te mperature dial and the Maxitrol space sensing Se ...

  • Energy Tech Laboratories MR212 - page 21

    21 Troubleshooting The following tables list cause s and corrective actions for possibl e problems wit h direct fired heater units. Review these lists prior to consulting manufa cturer. Airflow Troubleshooting Chart Problem Potential Cause Corrective Action Fan Inoperative Blown fuse or open circuit breaker Replace fus e or reset circuit breaker an ...

  • Energy Tech Laboratories MR212 - page 22

    22 Burner Troubleshooting Chart Problem Potential Cause Corrective Action Pilot Does Not Light/Stay Lit Main gas if off Open main gas valve Air in gas line Purge gas line Dirt in pilot orifice Clean orifice with compressed air Gas pressure out of range Adju st to proper gas pressure Pilot valve is off Turn pilot valve on Pilot orifice fitting leak ...

  • Energy Tech Laboratories MR212 - page 23

    23 Remote Panel Troubleshooting Chart Light Indication Condition Possible Cause No Lights Power not available to Remote Panel Bad voltage to unit Main disconnect i n “OFF” Position Circuit breaker tripped Bad main transformer POWER Light Only Proper unit Off Operation No problem No power to motor starter Manual /Off/Auto Switch in “Off” Pos ...

  • Energy Tech Laboratories MR212 - page 24

    24 Is Freeze-Stat open? Adjust or Replace Is end switch on Moto ri ze d Damp er closed? Adjust or Replace actuator YES YES NO Nothing Happe ns Is Overload tripped on starter? Reset & m easure FLA of m otor. Is it higher than rating? Adjust or change Pull ey NO NO YES Blower runs but there is no heat Is the air fl ow LED on Flame Saftey ill umin ...

  • Energy Tech Laboratories MR212 - page 25

    25 MAINTENANCE To guarantee trouble fre e operation of this heater, th e man ufacturer sugge sts following these guid elines. Most problems associated with fan failures are directly related to poor servi ce and maintenance. Please record any mainte nance or service performe d on this fan in the docum ent ation section located at the end of this man ...

  • Energy Tech Laboratories MR212 - page 26

    26 Burner Orifice Drill Size Orifice Drill Size Gas Port 31 Air Port 43 2 weeks after startup 1. Belt tension should be checked after the first 2 weeks of fan ope ration. Belts tend to stretch and settle into pulleys after an in itial start-up sequence. Do not tension bel ts by changing the setting of the motor pulley , this will change the fan spe ...

  • Energy Tech Laboratories MR212 - page 27

    27 ...

  • Energy Tech Laboratories MR212 - page 28

    May 2008 Rev. 11 28 Start-Up and Maintenance Documentation START-UP AND MEASUREMENTS SHOULD BE PERFORMED AFTER THE SYSTEM HAS BEEN AIR BALANCED AND WITH TH E HEAT ON (Warranty will be void without completion of this form) Job Information Job Name Service Company Address Address City City State State Zip Zip Phone Number Phone Number Fax Number Fax ...

Fabricant Energy Tech Laboratories Catégorie Gas Heater

Les documents que nous recevons du fabricant de l'appareilEnergy Tech Laboratories MR212 peuvent être divisés en plusieurs groupes. Ceux-ci sont, entre autres:
- dessins techniques Energy Tech Laboratories
- manuels d’utilisations MR212
- fiches produit Energy Tech Laboratories
- dépliants
- ou étiquettes-énergie Energy Tech Laboratories MR212
Tous sont importants, mais les informations les plus importantes du point de vue de l'utilisation de l'appareil se trouvent dans le manuel d’utilisation Energy Tech Laboratories MR212.

Un groupe de documents appelé manuels d’utilisation est également divisé en types plus spécifiques, tels que: Manuels d’installation Energy Tech Laboratories MR212, manuels d’entretien, brefs manuels ou manuels de l’utilisateur Energy Tech Laboratories MR212. Selon vos besoins, vous devriez chercher le document dont vous avez besoin. Sur notre site, vous pouvez voir le manuel le plus populaire d’utilisation du produit Energy Tech Laboratories MR212.

Manuel d’utilisation complet de l’appareil Energy Tech Laboratories MR212, quelle devrait-elle être?
Le manuel d’utilisation, également appelé le mode d’emploi, ou tout simplement le manuel, est un document technique destiné à aider à utiliser Energy Tech Laboratories MR212 par les utilisateurs. Des manuels sont généralement écrits par un rédacteur technique, mais dans un langage accessible à tous les utilisateurs Energy Tech Laboratories MR212.

Le manuel d’utilisation complet Energy Tech Laboratories, devrait inclure plusieurs éléments de base. Certains d'entre eux sont moins importants, tels que: la couverture / page de titre ou pages d'auteur. Cependant, la partie restante, devrait nous fournir des informations importantes du point de vue de l'utilisateur.

1. Introduction et des conseils sur la façon d'utiliser le manuel Energy Tech Laboratories MR212 - Au début de chaque manuel, nous devrions trouver des indices sur la façon d'utiliser le document. Il doit contenir des informations sur l'emplacement de la table des matières Energy Tech Laboratories MR212, FAQ ou des problèmes les plus fréquents - les points qui sont les plus souvent recherchés par les utilisateurs de chaque manuel
2. Table des matières - index de tous les conseils pour lEnergy Tech Laboratories MR212 qui peuvent être trouvés dans le document courant
3. Conseils sur la façon d'utiliser les fonctions de base de l’appareil Energy Tech Laboratories MR212 - qui devraient nous aider dans les premières étapes lors de l'utilisation Energy Tech Laboratories MR212
4. Troubleshooting - séquence systématique des activités qui nous aideront à diagnostiquer et ensuite résoudre les principaux problèmes de Energy Tech Laboratories MR212
5. FAQ - questions fréquemment posées
6. Détails du contact Informations sur l'endroit où chercher le contact avec le fabricant / service Energy Tech Laboratories MR212 dans un pays donné, si le problème ne peut être résolu par nous-mêmes.

Avez-vous une question à propos de Energy Tech Laboratories MR212?

Utiliser le formulaire ci-dessous

Si vous n’avez pas résolu votre problème avec Energy Tech Laboratories MR212, avec l'aide du manuel que vous avez trouvé, posez une question en utilisant le formulaire ci-dessous. Si un utilisateur a eu un problème similaire avec Energy Tech Laboratories MR212 il est probable qu’il a envie de partager la façon de le résoudre.

Réécrire le texte de l'image

Commentaires (0)