Manuale per l’uso Crown Boiler TWZ125

32 pagine 0.95 mb
Scarica

Vai alla pagina of 32

Summary
  • Crown Boiler TWZ125 - page 1

    1 TWZ Series Oil-Fired Hot W ater Boilers INST ALLA TION INSTRUCTIONS These instructions must be affixed on or adjacent to the boiler Models: • TWZ065 • TWZ075 • TWZ100 • TWZ090 • TWZ125 • TWZ150 • TWZ120 • TWZ175 • TWZ200 WARNING : Improper installation, adjustment, alteration, service or maintenance can cause property damage, in ...

  • Crown Boiler TWZ125 - page 2

    2 T able of Contents I. Product Description ............................................................. 1 II. Specifications ....................................................................... 1 III. Before Installing ................................................................... 2 IV . Locating the Boiler ............................... ...

  • Crown Boiler TWZ125 - page 3

    3 TABLE 1a: GENERAL SPECIFICATIONS Notes: 1 . Net Ratings are based on piping and pick-up allowances of 1.15. 2 . Burner Capacity Rating, GPH is based on #2 oil with a Gross Heating Value equal to 140000 BTU/Gal. 3 . Maximum Working Pressure, Water - 50 PSI. 4. Tankless Heater Ratings based on I=W=H test standard. III Before Installing 1 ) Safe, re ...

  • Crown Boiler TWZ125 - page 4

    4 3) Make sure that the boiler is correctly sized: • For heating systems employing convection radiation (baseboard or radiators) use an industry accepted sizing method such as the I=B=R Heat Loss Calculation Guide (Pub. #H21 or #H22) published by the Hydronics Institute in Berkeley Heights, NJ. • For new radiant heating systems refer to the rad ...

  • Crown Boiler TWZ125 - page 5

    5 FIGURE 2: CLEARANCES 0. 47" Sh e e t M e t a l ( 2 4 G A o r T hic k e r ) H ol l ow M a s on r y B l oc k s O p e n in g s Alig n e d T o P er m i t F r ee A ir Ci r c ul a ti o n 4“ MI N . C ombu s t i bl e S u r f ac e FIGURE 3: INSTALLATION OVER A COMBUSTIBLE FLOOR 4 6 6 18 * 6 24 * C L EA RA N C E FRO M SI N G L E WA LL C O N N EC T O ...

  • Crown Boiler TWZ125 - page 6

    6 V Air for Combustion and V entilation Sufficient fresh air must be supplied for combustion and ventilation. Provisions for combustion and ventilation air for oil burning equipment must be made in accordance with Section 1.5, Air for Combustion and Ventilation, in the latest edition of Installation of Oil Burning Equipment (ANSI/NFPA 31). To ensur ...

  • Crown Boiler TWZ125 - page 7

    7 FIGURE 4: BOILER INSTALLED IN CONFINED SPACE, ALL AIR FROM INSIDE used, they must be no finer than ¼” (4 x 4) mesh. For Buildings of Unusually Tight Construction: 1 ) Openings must be installed between the boiler room and the outdoors or a ventilated space, such as an attic or crawl space, which communicates directly with the outdoors. 2) Two ...

  • Crown Boiler TWZ125 - page 8

    8 FIGURE 5: ALL AIR FROM OUTDOORS, VENTILATED CRAWL SPACE AND ATTIC FIGURE 6: ALL AIR FROM OUTDOORS, VIA VENTILATED ATTIC 7 ...

  • Crown Boiler TWZ125 - page 9

    9 FIGURE 7: ALL AIR FROM OUTDOORS, USING OPENINGS INTO BOILER ROOM FIGURE 8: ALL AIR FROM OUTDOORS, USING HORIZONTAL DUCTS INTO BOILER ROOM 8 ...

  • Crown Boiler TWZ125 - page 10

    10 FIGURE 9: TYPICAL VENT SYSTEM INSTALLATION AND COMPONENTS VI V enting Vent installation must be in accordance with local building codes, or the local authority having jurisdiction. Typical vent installation is illustrated by Figure 9. The components of vent installation are the vent connector (breeching), barometric draft regulator, and chimney. ...

  • Crown Boiler TWZ125 - page 11

    11 6 ) Prior to boiler installation, inspect chimney for obstructions or other defects and correct as required. Clean chimney as necessary. 7 ) Vent pipe should slope upward from boiler not less than one inch in four feet. No portion of vent pipe should run downward or have sags. Vent pipe must be securely supported. 8 ) The vertical section of ven ...

  • Crown Boiler TWZ125 - page 12

    12 FIGURE 10: STANDARD BOILER PIPING CAUTION • INSTALL BOILER SO THAT ALL ELECTRICAL COMPONENTS ARE PROTECTED FROM WATER (DRIPPING, SPRAYING, RAIN, ETC.) DURING APPLIANCE OPERATION AND SERVICE (CIRCULATOR REPLACEMENT, ETC.). • OPERATION OF THIS BOILER WITH CONTINUOUS RETURN TEMPERATURES BELOW 120°F CAN CAUSE SEVERE HEAT EXCHANGER CORROSION DAM ...

  • Crown Boiler TWZ125 - page 13

    13 2) Circulator (Required) - Figure 10 shows the ideal location of the circulator which is in the supply piping immediately downstream of the expansion tank. A less ideal, but acceptable, location for most residential circulators is in the return (if this is done, be sure that adequate clearance exists to open the door. 3) Expansion Tank (Required ...

  • Crown Boiler TWZ125 - page 14

    14 FIGURE 12: BOILER BYPASS PIPING FIGURE 11: INDIRECT WATER HEATER BOILER SIDE PIPING Piping for Special Situations Certain types of heating systems have additional requirements. Some of the more common variations follow: 1) Indirect Water Heaters - Figure 11 shows typical indirect water heater piping. Boiler piping is the same as for any two- zon ...

  • Crown Boiler TWZ125 - page 15

    15 FIGURE 13: ISOLATION OF BOILER FROM SYSTEM WITH A HEAT EXCHANGER 3) Low Temperature Systems - Some systems, such as radiant tubing systems, require the system water temperature to be limited to a value below the temperature of the water leaving the TWZ. These systems also typically have return temperatures well below the 120°F minimum. Figure 1 ...

  • Crown Boiler TWZ125 - page 16

    16 2) Flow Restrictor (Recommended) - If water is drawn from the tankless coil at a rate in excess of the rating in Table 1b, the temperature of the hot water may be too low to be of use. The use of a flow restrictor will prevent this problem by limiting the rate at which water can pass through the tankless heater. If a restrictor is used, select o ...

  • Crown Boiler TWZ125 - page 17

    17 FIGURE 14: TANKLESS HEATER PIPING IX Fuel Line Piping Fuel line piping design, materials and construction must be in accordance with local building codes, requirements of the local authority having jurisdiction, and, the latest edition of Installation of Oil-Burning Equipment (ANSI/NFPA 31). Refer also to the instruction manuals provided with th ...

  • Crown Boiler TWZ125 - page 18

    18 FIGURE 16: ONE-PIPE LIFT SYSTEM b) ONE-PIPE LIFT SYSTEM (not recommended) - Used when a fuel oil storage tank is located below an oil burner fuel pump. See Figure 16. The vertical distance from bottom of the tank to center line of the pump (Dimension ‘H’) must not exceed that shown in the pump manufacturer’s instructions. Although all oil ...

  • Crown Boiler TWZ125 - page 19

    19 FIGURE 17: TWO-PIPE GRAVITY FEED SYSTEM FIGURE 18: TWO-PIPE LIFT SYSTEM 18 ...

  • Crown Boiler TWZ125 - page 20

    20 X Wiring WARNING All wiring and grounding must be done in accordance with the authority having jurisdiction or, in the absence of such authority, with the National Electric Code (ANSI/NFPA70). Single Zone Wiring 1) 120 V olt W iring - The boiler should be provided with its own 15A branch circuit with fused disconnect. All 120 volt connections ar ...

  • Crown Boiler TWZ125 - page 21

    21 FIGURE 19: WIRING DIAGRAM, SINGLE HEATING ZONE ONLY FIGURE 20: WIRING DIAGRAM, CIRCULATOR ZONE WIRING USING HONEYWELL R845A’s (FACTORY BOILER WIRING NOT SHOWN - SEE FIGURE 19) 20 L1 I N T ERRUPT ED I N TER M I TTE N T BURN ER M O T O R LI M I T VA L V E L2 H O N EYWE LL L8 1 4 8 O R L8 1 2 4 AQ U AS T AT RE LAY NOT E : 1 ) BURNER WI RI N G SHO ...

  • Crown Boiler TWZ125 - page 22

    22 XI S tart-up and Checkout Use the following procedure for initial start-up of the boiler: 1) Ensure that the boiler and entire heating system are filled with water. 2) Check all new piping for leaks and purge heating system piping sections that are air bound. 3) Verify that the vent system is complete and free of obstructions prior to start-up o ...

  • Crown Boiler TWZ125 - page 23

    23 6) Check initial settings of oil burner air band and air shutter, head setting etc., and readjust if needed. See Table 3 for setup and combustion data pertaining to a particular boiler/ burner combination. 7) Attach plastic hose to oil pump vent fitting and provide a container to catch oil during oil pump bleeding procedure. 8) Install 0-200 PSI ...

  • Crown Boiler TWZ125 - page 24

    24 TABLE 3a: BECKETT BURNER CONFIGURATION AND SETUP DATA 23 TABLE 3b: CARLIN BURNER CONFIGURATION AND SETUP DATA TW Z0 6 5 TW Z0 7 5 TW Z1 0 0 TW Z 0 9 0 TW Z1 2 5 TW Z1 5 0 TW Z1 2 0 TW Z1 7 5 TW Z2 0 0 B U R N E R M O D E L E Z - 1 H PE Z - 1 H PE Z - 1 H PE Z - 1 H PE Z - 1 H PE Z - 1 H PE Z - 1 H PE Z - 2 H P S T A NDA R D DE L. HA G O HA GO DE ...

  • Crown Boiler TWZ125 - page 25

    25 XII Service and Maintenance The following procedure should be performed on an annual basis: 1) Turn off electrical power and oil supply to the boiler. 2) Clean the boiler as follows: a) Remove vent connector and piping. b) Remove barometric draft regulator. c) Remove top jacket panel to gain access to boiler flue collector. d) Unscrew four wing ...

  • Crown Boiler TWZ125 - page 26

    26 CAUTION WATER LEAKS CAN CAUSE SEVERE CORROSION DAMAGE TO THE BOILER OR OTHER SYSTEM COMPONENTS. REPAIR ANY LEAKS FOUND IMMEDIATELY. IMPORTANT • CLEAN THE BOILER EVEN IF THERE ARE NO SIGNIFICANT SOOT DEPOSITS. FAILURE TO REMOVE ALL SULFUR AND ASH DEPOSITS ANNUALLY CAN CAUSE SEVERE CORROSION DAMAGE. • WHEN CLEANING THE REAR FLUE PASSAGE, BE CA ...

  • Crown Boiler TWZ125 - page 27

    27 26 Important Product Safety Information Refractory Ceramic Fiber Product Warning : The Parts list designates parts that contain refractory ceramic fibers (RCF). RFC has been classified as a possible human carcinogen. When exposed to temperatures about 1805°F, such as during direct flame contact, RFC changes into crystalline silica, a known carc ...

  • Crown Boiler TWZ125 - page 28

    28 27 65 75 100 90 125 150 120 175 200 1 COMPLETE HEAT EXCHANGER ASSY. 1 ea. 270013 270013 270013 270014 270014 270014 270015 270015 270015 * FRONT SECTION 275050 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. * REAR SECTION 275060 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. * INTERMEDIATE SECTION 275055 1 ea. 1 ea. 1 ea. 2 ea. 2 e ...

  • Crown Boiler TWZ125 - page 29

    29 28 ...

  • Crown Boiler TWZ125 - page 30

    30 29 65 75 100 90 125 150 120 175 200 40 LEFT SIDE JACKET PANEL 1 ea. 270233 270233 270233 270234 270234 270234 270235 270235 270235 41 RIGHT SIDE JACKET PANEL 1 ea. 270223 270223 270223 270224 270224 270224 270225 270225 270225 * REAR JACKET PANEL 270220 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 1 ea. 43 TOP JACKET PANEL 1 ea. 270243 270243 ...

  • Crown Boiler TWZ125 - page 31

    31 30 ...

  • Crown Boiler TWZ125 - page 32

    32 Manufacturer of Hydronic Heating Products P .O. Box 14818 3633 I. Street Philadelphia, P A 19134 7 HO)D[ZZZ FURZQERLOHU FRP PN980270 Rev 6 09/10 ...

Fabbricante Crown Boiler Categoria Boiler

I documenti che otteniamo dal fabbricante del dispositivoCrown Boiler TWZ125 possono essere suddivisi in diversi gruppi. Questi sono tra gli altri:
- disegni tecnici Crown Boiler
- manuali per l’uso TWZ125
- schede prodotto Crown Boiler
- opuscoli
- o etichette energetiche Crown Boiler TWZ125
Tutti sono importanti, ma le informazioni più importanti dal punto di vista di utilizzo del dispositivo possono essere trovate nel manuale per l’uso Crown Boiler TWZ125.

Un gruppo di documenti denominato manuali per l’uso, è anche suddiviso in tipi più specifici, come: Manuali di installazione Crown Boiler TWZ125, manuali di manutenzione, brevi manuali o manuali utente Crown Boiler TWZ125. A seconda delle esigenze, si dovrebbe cercare il documento necessario. Nel nostro sito web, puoi visualizzare il manuale più popolare per l'uso del prodotto Crown Boiler TWZ125.

Manuali per l’uso simili

Manuale completo del dispositivo Crown Boiler TWZ125, come deve essere?
Il manuale per l’uso, denominato anche istruzioni per l’uso, o semplicemente il manuale è un documento tecnico progettato per aiutare ad utilizzare Crown Boiler TWZ125 dagli utenti. I manuali sono di solito scritti da uno scrittore tecnico, ma in un linguaggio accessibile a tutti gli utenti Crown Boiler TWZ125.

Il manuale per l’uso completo Crown Boiler, dovrebbe includere vari elementi di base. Alcuni di loro sono meno importanti, come ad esempio: copertina / pagina del titolo o pagina di autore. Tuttavia, la parte rimanente, dovrebbe fornire informazioni importanti dal punto di vista dell'utente.

1. Introduzione e la guida su come utilizzare il manuale Crown Boiler TWZ125 - All'inizio di ogni manuale, dovremmo trovare indizi su come utilizzare il documento. Dovrebbe contenere informazioni sulla posizione dell’indice Crown Boiler TWZ125, FAQ o i problemi più comuni : i punti che sono più spesso cercati dagli utenti di ogni manuale
2. Indice - elenco di tutti i suggerimenti per Crown Boiler TWZ125 che possono essere trovati nel documento corrente
3. Suggerimenti su come utilizzare le funzioni di base del dispositivo Crown Boiler TWZ125 - che ci dovrebbe aiutare nei primi passi durante l'uso Crown Boiler TWZ125
4. Troubleshooting - sequenza sistematica delle attività che vi aiuterà a diagnosticare e, successivamente, risolvere i problemi più importanti del Crown Boiler TWZ125
5. FAQ - domande più frequenti
6. Dettagli di contatto Informazioni su dove cercare il contatto con il fabbricante / servizio Crown Boiler TWZ125 in un dato paese, se il problema non può essere risolto da noi stessi.

Hai una domanda su Crown Boiler TWZ125?

Utilizza il modulo sottostante

Se non hai risolto il problema con Crown Boiler TWZ125 con l'aiuto del manuale che hai trovato, fai una domanda utilizzando il modulo sottostante. Se un utente ha avuto un problema simile con Crown Boiler TWZ125 è probabile che voglia condividere il modo di risolverlo.

Riscrivi il testo dall’immagine

Commenti (0)