Manuale per l’uso Jøtul GF100 DV

28 pagine 1.04 mb
Scarica

Vai alla pagina of 28

Summary
  • Jøtul GF100 DV - page 1

    1 WARNING: IF THE INFORMA TION IN THESE INSTRUCTIONS ARE NO T FOLLOWED EXA CTL Y , A FIRE OR EX- PLOSION MA Y RESUL T CAUSING PROPER TY D AMA GE, PERSONAL INJUR Y OR LOSS OF LIFE. FOR Y OUR SAFETY : DO NOT ST ORE OR USE GASOLINE OR OTHER FLAMMABLE V APORS AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE. INST ALLA TION: INST ALLA TION AND ...

  • Jøtul GF100 DV - page 2

    2 W elcome to J ø tul... Congr atula tions on the purchase of your new Jøtul GF100 DV Nor dic Q T Gas Heater . W e at Jøtul are glad you’ve made the decision to warm your hearth with a Jøtul product. Y our new stove e xemplifies o ver 150 years experience as the world’ s largest manuf acturer of solid fuel burning appliances. W e’ve been ...

  • Jøtul GF100 DV - page 3

    3 T able of Contents Service T ools .............................................. 3 Specifications ........................................... 4 General Inf ormation ............................... 5 Safety Inf ormation .................................. 6 Installation R equirements Location ................................................. 6 Hear ...

  • Jøtul GF100 DV - page 4

    4 Specifications 16 1/2” 21” 21” 15 1/4” GF 100 D V Nordic QT Specifications Input Rates Natural Gas 14,500 BTU /hr . maximum input 10,600 BTU /hr . minimum input Propane 14,000 BTU /hr . maximum input 10,900 BTU /hr . minimum input Inlet Pressure: MI N M AX Natur al Gas: 5.0 W C (1.24 kP a) 7.0 W C (1.74 kPa) Propane: 11.0 WC (2.74 kP a) 1 ...

  • Jøtul GF100 DV - page 5

    5 THIS FIREPLACE IS SHIPPED FR OM THE F ACT ORY FOR USE WITH N N N N N A A A A A TU- TU- TU- TU- TU- RAL GAS RAL GAS RAL GAS RAL GAS RAL GAS ONL Y . IF USE WITH PRO- P ANE IS DESIRED , THE APPLIANCE MUST FIRST BE CONVERTED USING THE FUEL CONVERSION KIT PRO- VIDED, #154379. CONVERSION SHOULD BE MADE BEFORE THE APPLI- ANCE IS INST ALLED. Gener al Inf ...

  • Jøtul GF100 DV - page 6

    6 Location In selecting a location for the stove, consider the follow - ing points: 1) Heat distribution 2) V ent termination requirements 3) Gas supply line routing 4) T r affic ar eas , furniture, draperies, etc. The GF100 Nordic QT ma y be located on or near conv entional construction materials, however , proper clearance to c ombustibles must b ...

  • Jøtul GF100 DV - page 7

    7 Sto ve and V ent Clearance Requirements Minimum Clearances from the Stov e to C ombustibles: See figs. 2-4. R ear: 0” (0 mm) Ceiling: 25” (635 mm) C orner: 2” (50 mm) Right Side: 3” (76 mm) Lef t Side: 10” (254 mm) - for access to Lighting Instruction plate Minimum Clearances from the V ent Pipe to Combus- tibles: Horiz ontal R un: Off ...

  • Jøtul GF100 DV - page 8

    8 SEALANT V enting Requirements The Jøtul GF100 Nordic QT gas stov e may be installed with a vertical or horizontal termination and must conf orm to the configur ation requir ements described below . This appliance is approv ed for use with v ent systems from the following manufa cturers: • Simpson Dura- V ent GS • Selkirk Metalbestos • Secu ...

  • Jøtul GF100 DV - page 9

    9 V er tical V enting The Jøtul GF100 DV Nor dic Q T is approved f or vertical venting thr ough a ceiling or to a roof termination following these guidelines:  The termination should fall within the shaded area of the grid depicted in fig . 6 below . Maximum V ertical should not exceed 15 f t . (4.57 m)  In no case shall any discharge opeing ...

  • Jøtul GF100 DV - page 10

    10 Horizontal T ermination  W all Cut-out Opening: A minimum 10" X 10" (250 mm x 250 mm) square hole is requir ed for proper pipe clear - ances through a combustible wall. Use v ent manufacturer’ s W ALL TH IMBLE for the wall penetration. DO NOT FI LL AI R SP ACE WITH AN Y TYPE OF I NSU LA TION.  The minimum horizon tal run made d ...

  • Jøtul GF100 DV - page 11

    11 W all Shield Installation The decora tive W all Shield, included with the Nordic QT , is used to cover the ve nt hole in the wall in installations vented directly of f the r ear of the stov e. Follow this procedure: 1. Remo ve the top two 1/4” hex head screw s from the rear shr oud of the stove. 2. Align the holes in the wall shield with the h ...

  • Jøtul GF100 DV - page 12

    12 Figure 15. V ent T erminal Clearances - National F uel Gas Code. Horizontal T ermination Clearance A = Clearance abo ve grade, veranda, porch , deck, or balcony : *12 inches (30 cm) minimum. B = Clearance to window or door that may be opened: 9 inches (23 cm) min./U.S. *12 inches (30 cm) min./ CAN W e rec ommend 12 inches minimum to help prev en ...

  • Jøtul GF100 DV - page 13

    13 T ools required: • 1/2” open ended wrench or deep-well sock et, T orx T20 or slotted screwdriv er , 4 mm allen wrench. C onv ersion Kit Contents: • 1, regulator tower labeled f or propane • 3, r egulator tower screw s • 1, burner orifice (#49 for NG, 59 for LPG) • 1, pilot orifice (#51 f or NG, #30 for LPG) • Label A - to be comple ...

  • Jøtul GF100 DV - page 14

    14 Gas Conv ersion Procedure R efer to fig. 27, Illustr ated P ar ts Breakdown, to identify part numbers below . 1. T urn of f gas supply to stove. 2. R emove the stove T op Plate (3). 3. R emove the front plate fr om the stov e. Pull the casting straight up and out away fr om the side panels. Pull the panel upwar d with one hand while the other pu ...

  • Jøtul GF100 DV - page 15

    15 Gas Supply C onnec tion The gas supply line connection is made to the valve just inside the left rear leg. The gas supply line should be 3/8" npt with a 1/2" diameter supply , or the appropriate size to provide sufficien t gas pressure to the valv e regardless of the input setting . The use of Flexible Gas Appliance C onnectors is acce ...

  • Jøtul GF100 DV - page 16

    16 Gas Pressure Corr ect gas pressure is essential for ef ficient and safe opera tion of the Nordic QT gas sto ve. It is impor tant that the correct pressure is established at the time of the installation. Proper gas pr essure provides a consisten t flow of gas to the appliance and is instrumental in checking for gas leak s. Pressure T est: Attach ...

  • Jøtul GF100 DV - page 17

    17 Derating Pr ocedure: 1. T o derate this unit, install the appropriate orifice per the High Altitude chart . 2. R emov e the log support /burner tube to expose the main burner orifice. 3. Using a 1/2” open ended wrench or a deep-well socket remo ve the burner orifice. 4. R eplace with the appropriate orifice from the high altitude kit. 5. Be su ...

  • Jøtul GF100 DV - page 18

    18 Optional W all Thermostat or Remote C ontrol Use only a 750 millivolt DC two-wire circuit thermostat with this appliance. The thermostat should be placed in the same room as the heater , typically 5 feet off the floor . Av oid draf ty areas or an y area that may af fect the accuracy of the thermostat . The thermostat should be connected to the N ...

  • Jøtul GF100 DV - page 19

    19 S ystem Check 1. PURGI NG T HE GAS LI N E: When lighting the appli- ance f or the first time, it will take a few moments to clear the gas line of air . Once this purge is complete, the appliance will opera te as described in the lighting instructions. See the inside back cov er of this manual or the stove Rating Pla te attached the bottom of the ...

  • Jøtul GF100 DV - page 20

    20 Maintenance The Nordic Q T Direct V ent gas stove and its venting system should be inspected before use and at least annually by a qualified service technician. IMPOR T ANT : AL W A YS TURN OFF TH E GAS SU PPL Y T O THE ST O VE BEFORE ANY SERVICE WORK IS PERFORMED ON T HE ST O VE. Firebo x Cleaning: The firebox should be v acuumed annually to re ...

  • Jøtul GF100 DV - page 21

    21 MODEL NAME: ________________________ SERI AL N UMBE R: ______________________ D A TE OF PURC HASE: ___________________ PURC HASED FR OM: ____________________ NAME OF IN ST ALLER: ___________________ TYPE OF FU EL: ________________________ W AS S T OVE C ONVERTED? _______________ NO TES: GF100 DV Nordic QT R ecord the following inf ormation to he ...

  • Jøtul GF100 DV - page 22

    22 Figure 29. Illustr ated P a rts Breakdown - GF100 Nordic Q T GF100 Nordic QT Illustr ated P ar ts Breakdown 1 2 2 3 4 5 6 7 7 18 8 9 10 11 12 21 20 13 14 15 15 16 17 18 19 23 27 26 25 24 28 32 B 31 33 A C D E F 36 34 35 30 22 29 ...

  • Jøtul GF100 DV - page 23

    23 4. Glass Fr ame ........................................... 129392 5. Glass Gasket (7/16” x 5 ft tadpole) ............ 129124 6. Glass P anel ............................................ 129393 Glass Fr ame Kit (includes 4,5 & 6) . 154983 7. Glass Clip ............................................... 129135 8. Log Set ...................... ...

  • Jøtul GF100 DV - page 24

    24 ...

  • Jøtul GF100 DV - page 25

    25 ...

  • Jøtul GF100 DV - page 26

    26 ...

  • Jøtul GF100 DV - page 27

    27 3. Access the lower controls. 4. Depress gas c ontrol knob slightly and turn clock - wise to “OFF” . Do not force. FOR Y OUR SAFETY , READ BEFORE LIGHTING . LIGHTING INSTR UCTIONS T O TURN OFF GAS T O THE APPLIANCE: LIGHTING INSTRUCTIONS WARNING: IF Y OU DO NOT FOLL OW THESE INSTR UCTIONS EXACTL Y , A FIRE OR EXPLOSION MA Y RESUL T CAUSING P ...

  • Jøtul GF100 DV - page 28

    28 January 2004 129483-C Jøtul ASA P . O. Bo x 1411 N-1602 Fr edrikstad Norwa y Jøtul North America 400 Riverside Str eet Portland, ME 04104 This appliance must be installed in conformance with local and na tional building regulations. Befor e beginning the installation, it is important that the these instruc tions be carefully read and understoo ...

Fabbricante Jøtul Categoria Electric Heater

I documenti che otteniamo dal fabbricante del dispositivoJøtul GF100 DV possono essere suddivisi in diversi gruppi. Questi sono tra gli altri:
- disegni tecnici Jøtul
- manuali per l’uso GF100 DV
- schede prodotto Jøtul
- opuscoli
- o etichette energetiche Jøtul GF100 DV
Tutti sono importanti, ma le informazioni più importanti dal punto di vista di utilizzo del dispositivo possono essere trovate nel manuale per l’uso Jøtul GF100 DV.

Un gruppo di documenti denominato manuali per l’uso, è anche suddiviso in tipi più specifici, come: Manuali di installazione Jøtul GF100 DV, manuali di manutenzione, brevi manuali o manuali utente Jøtul GF100 DV. A seconda delle esigenze, si dovrebbe cercare il documento necessario. Nel nostro sito web, puoi visualizzare il manuale più popolare per l'uso del prodotto Jøtul GF100 DV.

Manuali per l’uso simili

Manuale completo del dispositivo Jøtul GF100 DV, come deve essere?
Il manuale per l’uso, denominato anche istruzioni per l’uso, o semplicemente il manuale è un documento tecnico progettato per aiutare ad utilizzare Jøtul GF100 DV dagli utenti. I manuali sono di solito scritti da uno scrittore tecnico, ma in un linguaggio accessibile a tutti gli utenti Jøtul GF100 DV.

Il manuale per l’uso completo Jøtul, dovrebbe includere vari elementi di base. Alcuni di loro sono meno importanti, come ad esempio: copertina / pagina del titolo o pagina di autore. Tuttavia, la parte rimanente, dovrebbe fornire informazioni importanti dal punto di vista dell'utente.

1. Introduzione e la guida su come utilizzare il manuale Jøtul GF100 DV - All'inizio di ogni manuale, dovremmo trovare indizi su come utilizzare il documento. Dovrebbe contenere informazioni sulla posizione dell’indice Jøtul GF100 DV, FAQ o i problemi più comuni : i punti che sono più spesso cercati dagli utenti di ogni manuale
2. Indice - elenco di tutti i suggerimenti per Jøtul GF100 DV che possono essere trovati nel documento corrente
3. Suggerimenti su come utilizzare le funzioni di base del dispositivo Jøtul GF100 DV - che ci dovrebbe aiutare nei primi passi durante l'uso Jøtul GF100 DV
4. Troubleshooting - sequenza sistematica delle attività che vi aiuterà a diagnosticare e, successivamente, risolvere i problemi più importanti del Jøtul GF100 DV
5. FAQ - domande più frequenti
6. Dettagli di contatto Informazioni su dove cercare il contatto con il fabbricante / servizio Jøtul GF100 DV in un dato paese, se il problema non può essere risolto da noi stessi.

Hai una domanda su Jøtul GF100 DV?

Utilizza il modulo sottostante

Se non hai risolto il problema con Jøtul GF100 DV con l'aiuto del manuale che hai trovato, fai una domanda utilizzando il modulo sottostante. Se un utente ha avuto un problema simile con Jøtul GF100 DV è probabile che voglia condividere il modo di risolverlo.

Riscrivi il testo dall’immagine

Commenti (0)