Linksys SGE2010の取扱説明書

66ページ 1.78 mb
ダウンロード

ページに移動 of 66

Summary
  • Linksys SGE2010 - page 1

    ADMIN GUIDE BUSINESS SERIES 48-por t 10/100/1000 Ethernet S witch Model: SGE2010/SGE2010P ...

  • Linksys SGE2010 - page 2

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de i T able of C o ntents 1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 What’ s in this Us er Guide? 1 2 Getting to Know the SGE2010/SGE2010P . . . . . . . . . . . . . . 2 SGE2010/P Front Panel 2 SGE2010/P Back P anel 3 3 Connecting Devices to the SGE2010/SGE2010P . . . . . . ...

  • Linksys SGE2010 - page 3

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de ii T able of C o ntents Port Status 45 PoE Status 45 Port C onfig uration 46 Port S ettings 46 PoE Setting s 47 System Mode (Layer 2 / Layer 3) Selection 48 Help 49 Logout 50 5 Web Utility C onfiguration . . . . . . . . . . . . . . . . . . . . 51 Connecting to th e Switch with the Web-Based Uti lity 5 ...

  • Linksys SGE2010 - page 4

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 1 What’ s in this User Guid e? Introduction 1 I ntr oduc tion We l co m e Thank you for cho osing a Linksys Switch. This Swit ch will allow you to quick ly and econom ically expand your Lin ksys system. Th is new L inksys r ack moun t Switch delivers non-bloc k ing, wire speed swit ching fo r your n ...

  • Linksys SGE2010 - page 5

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 2 Getting to Know th e SGE2 010/S GE2010P 2 Getting to K now the SGE2010/SGE2010P This chapter describes the por ts , LEDs, and other featur es o n the front and back panels of the switch. The SGE2010 and SGE2010P are 48-por t, lay er-2 Ethe rnet switches that af fordably expand the capability of the ...

  • Linksys SGE2010 - page 6

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 3 Getting to Know th e SGE2 010/S GE2010P SGE2010 /P Back Pa nel 1-48 The Switch is eq uippe d with 48 au to -sen sing, Eth ernet (802. 3) ne twork p orts , wh ich us e RJ -45 co nne cto rs . T he F ast E th ern et p orts su ppo rt networ k spee ds of 10M bps, 1 00Mbps, or 1000Mb ps. They ca n operat ...

  • Linksys SGE2010 - page 7

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 4 Samp le Network Configuration C o nnec ting Devices to the SGE2010/S GE2010P 3 Co nnec t ing Devices to the SGE2010/ SGE2010P This c hapter explain s how to physically conne ct your n etwor k dev ices to th e s witch. • ”Sample Network Configuration, ” on page 4 • ”Maximum Cablin g Distanc ...

  • Linksys SGE2010 - page 8

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 5 Before Y ou Install the Switch... C o nnec ting Devices to the SGE2010/S GE2010P Befor e Y ou Install the S witch... When you choose a location for the switch, obser ve the foll owing guidelines: • Make sure that the switch will be acc essible and that the cables can be easily connected. • Keep ...

  • Linksys SGE2010 - page 9

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 6 Placement O ptio ns C o nnec ting Devices to the SGE2010/S GE2010P CA UTIO N: Kee p enough venti lation space for the Ethernet switch so it does not exceed the envir onmental restrictions mentioned in the specificat ions. Rack- Mount Pl acement T o mount the Ethern et swi tch in any standard-size d, ...

  • Linksys SGE2010 - page 10

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 7 C onnecting th e Cable s C o nnec ting Devices to the SGE2010/S GE2010P W all-M ount Placeme nt 1. On on e o f the s ide co rner s, remove the four front screws o n of the Ether net sw itch. R etain the sc rews fo r re -ins ta ll atio n. NO TE: Th e Ethernet swi tch, shown below , is mou nted with t ...

  • Linksys SGE2010 - page 11

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 8 C onnecting th e Cable s C o nnec ting Devices to the SGE2010/S GE2010P CA UTIO N: Obser ve th e orien tation of the mini -GB IC modu le be fore inser tin g it into a mini- GBIC port. The bottom mini-GBIC por ts are upside down i n relation to the t o p mini-GBIC por ts. 5. If you u se the console i ...

  • Linksys SGE2010 - page 12

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 9 C o nnec ting to Y our Switch wit h HyperT erm inal U s ing the Console 4 Using the C onsole This chapter describes the use of the switch console, which allows you to per form basic config uration of the switch . The switch features a menu- driven console i nter face for basi c configuration of the ...

  • Linksys SGE2010 - page 13

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 10 C o nnec ting to Y our Switch wit h HyperT erm inal U s ing the Console 1. Click the Star t bu tton. Choose P rogra ms > Acces so rie s > Comm uni ca tion s > HyperT erminal . 2. On the Connection Description scre en, type a name for this co nnec tion, select an icon, and the n click OK . ...

  • Linksys SGE2010 - page 14

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 11 C o nnec ting to Y our Switch wit h HyperT erm inal U s ing the Console 4. Set the s erial p or t settin gs as follows: • Bits per se cond: 115200 • Data bits: 8 • Pa ri ty : No ne • Stop bits : 1 • Flow co nt rol : None 5. Then, cl ick the OK button. 6. Optionally , on the Fi l e me nu, ...

  • Linksys SGE2010 - page 15

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 12 C onnecting t o the S witch with T elne t U s ing the Console C onnec ting to the Sw itch with T elnet Y o u can conne ct to th e switch with telnet. 1. Open a command line edit or and enter telnet < switch ip address> . T h en, press the En ter key . 2. When the Lo g i n screen appears, sele ...

  • Linksys SGE2010 - page 16

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 13 Using the Switch Ma in M enu U s ing the Console U sing the Switch Main Menu The Switch Main Menu provides access to screens that y o u can use to configure your system, view or modify por t and P oE settings, and view or modify system and stacking mode. 1. System Conf iguration (see pag e 13) 2. P ...

  • Linksys SGE2010 - page 17

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 14 Sy stem Configuration U s ing the Console 3. Username & Password Settings (s ee page 21) 4. Securit y Setti ngs (see page 22) 5. VLAN Management (see page 25 ) 6. IP Co nfiguration (see page 26) 7. File Ma na geme nt ( see pa ge 4 0) 8. Restore Syst em D efault Sett ings (see page 43) 9. Reset ...

  • Linksys SGE2010 - page 18

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 15 Sy stem Configuration U s ing the Console Ve r s i o n s Use the V ersions screen to display the boot, software, and hardwar e firmware versi ons of the Ethern et s witch. I n s tacki ng m ode, this inform ation is di splayed for the stack master . T o open this screen: 1. F rom the Sw itch Main Me ...

  • Linksys SGE2010 - page 19

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 16 Sy stem Configuration U s ing the Console T o change the system c on tact, system name, and location: 1. Select Ed it , and then make yo ur changes. P ress the Ta b key to move the cursor from one field to the ne xt. 2. Pr ess th e Es c ke y to return to t he Ac ti on list. 3. Select Sav e to save ...

  • Linksys SGE2010 - page 20

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 17 Sy stem Configuration U s ing the Console Serial Port Configura t ion Use the Serial Po r t C onfiguration screen to view or c hange th e b aud rate o f th e Ethe rnet switc h. T o open this screen: 1. F rom the S w itch Main Menu , s elect 1. Sy stem Co nfigur ation Me nu . 2. F rom the Sy stem Co ...

  • Linksys SGE2010 - page 21

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 18 Sy stem Configuration U s ing the Console T o open this screen: 1. F rom the Switch Main Menu , se lect 1. Sy stem C onfigu rati on Menu . 2. F rom the Sy stem Configur ation Menu , sel ec t 2. Managemen t Settings . 3. F rom the Ma nagement Settings Menu , ch o ose 2. T e lnet Config uration . T o ...

  • Linksys SGE2010 - page 22

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 19 Sy stem Configuration U s ing the Console SSH Se rver Configuration Use the SSH Server Configur ation scr een to view or edit the status of the SSH server . Y ou can enable or disable the server and confi g ure t he SSH server port T o open this screen: 1. F rom the S w itch Main Menu , s elect 1. ...

  • Linksys SGE2010 - page 23

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 20 Sy stem Configuration U s ing the Console T o open this screen: 1. F rom the Switch Main Menu , se lect 1. Sy stem C onfigu rati on Menu . 2. F rom the Sy stem Configur ation Menu , sel ec t 2. Managemen t Settings . 3. F rom the Ma nagement Settings Menu , ch o ose 3. SSH Configuration . 4. F rom ...

  • Linksys SGE2010 - page 24

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 21 Sy stem Configuration U s ing the Console T o ge n era te t he c r y pto key: 1. V erify that the informa tion is corre c t. 2. Select Exec ute . 3. When the Oper ation c omplete message ap pears, press the Esc key to move the cursor to the Act io n li st. SSH Keys Fingerprint s Use the SSH Key s F ...

  • Linksys SGE2010 - page 25

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 22 Sy stem Configuration U s ing the Console NO TE: The default user is “ad m in ” with no password. T o open this screen: 1. F rom the Switch Main Menu , se lect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Menu , select 3. Use rname & Passw ord Settings . T o change User &a ...

  • Linksys SGE2010 - page 26

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 23 Sy stem Configuration U s ing the Console SSL Generate C er tifi cate Use the SSL Certificate Generation screen to view , edit, and ex ecute device-generated cer tif icates. T o open this screen: 1. F rom the S w it ch Main Menu, select 1. Syst em Configura t ion . 2. F rom the Sy stem Configurat i ...

  • Linksys SGE2010 - page 27

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 24 Sy stem Configuration U s ing the Console Show Cer tif ic ate Use the Show Certificate s creen to disp lay the internal cer tif icate. T o open this screen: 1. F rom the Sw itch Main Menu , se lect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Menu , select 4. Security Setting s . ...

  • Linksys SGE2010 - page 28

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 25 Sy stem Configuration U s ing the Console VLAN Managemen t The VL AN Management menu provides access to a screen wher e you can view or modify the defau lt V LAN ID. 1. Default VLAN Setup (see page 25) 0.Back (S elect to return to the previous menu.) T o open this screen: 1. F rom the S w itch Main ...

  • Linksys SGE2010 - page 29

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 26 Sy stem Configuration U s ing the Console To e d i t t h e V L A N I D : 1. Select Ed it . 2. T ype the VLAN ID . 3. Pr ess th e Es c ke y to move the cursor to the Act ion list. 4. Select Exec ute . 5. When the Oper ation c omplete message ap pears, press the Esc key to move the cursor to the Act ...

  • Linksys SGE2010 - page 30

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 27 Sy stem Configuration U s ing the Console IPv4 Address Configuratio n The IP v4 Configuration menu pr ovides access to the IPv4 address settings and DHCP renew . 1. IPv4 Address Setti ngs (see page 27) 2. DHCP Renew (see page 28) 0.Back (S elect to return to the previous menu.) T o open this screen ...

  • Linksys SGE2010 - page 31

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 28 Sy stem Configuration U s ing the Console 4. F rom the IP v4 Address Configur ation men u, sel ect 1. IPv 4 Address Settings . T o edit the IPv4 address settings: 1. Select Ed i t ., and then make the changes . Press t he Ta b key to move the cursor from one field to the ne xt. NO TE: T o enable or ...

  • Linksys SGE2010 - page 32

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 29 Sy stem Configuration U s ing the Console 1. IPv6 Inter face Enable (see page 29) 2. IPv6 Address Setti ngs (see page 30) 3. IPv6 Addr es s T able (see page 31) 4. IPv6 ISA T AP Enable (see pa ge 31) 5. IPv6 ISA T AP I nter face Show (see page 32) 6. IPv6 Default Gateway (see page 33) T o open this ...

  • Linksys SGE2010 - page 33

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 30 Sy stem Configuration U s ing the Console 3. Select Sav e to s ave your settin gs 4. When the Oper ation c omplete message ap pears, press the Esc key to move the cursor to the Act io n li st. 5. When y ou are fin i shed working on thi s screen, select Qu i t . IPv6 A ddress Settings Y o u can us e ...

  • Linksys SGE2010 - page 34

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 31 Sy stem Configuration U s ing the Console IPv6 A ddress T able The IPv6 Addr ess T able lists the IPv6 addresses that are configur ed. T o open this screen: 1. F rom the S w itch Main Menu , s elect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Menu , select 6. IP Configuration . 3 ...

  • Linksys SGE2010 - page 35

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 32 Sy stem Configuration U s ing the Console T o e dit the ISA T AP tunnel settings 1. Select Ed it ., and then make the changes . Press t he Ta b key to move the cursor from one field to the ne xt. NO TE: T o enable or disable the ISA T AP tunnel, move the cursor to the Sta tus field, an d then press ...

  • Linksys SGE2010 - page 36

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 33 Sy stem Configuration U s ing the Console IPv6 Defau lt Gateway Y ou can use the IP v 6 Def ault Gate way screen to vi ew or e dit inform ation a bout the I Pv6 Defa ult Ga te way . T o open this screen: 1. F rom the S w itch Main Menu , s elect 1. Sy stem Configuration . 2. F rom the Sy stem Confi ...

  • Linksys SGE2010 - page 37

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 34 Sy stem Configuration U s ing the Console HT TP Conf igurati on Y o u can us e the HT TP scr een to view and edit the HT TP settings.Y ou can enable or disable the HT T P ser ver and config ure the por t on which t he se ssion i s enab led. T o open the screen: 1. F rom the Sw itch Main Menu , se l ...

  • Linksys SGE2010 - page 38

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 35 Sy stem Configuration U s ing the Console T o open the screen: 1. F rom the Switch Main Menu , se lect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Menu , select 6. IP Configuration . 3. F rom the IP Configur ation menu, select 4. HT TPS Configuration . To c h a n g e H T T P S s ...

  • Linksys SGE2010 - page 39

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 36 Sy stem Configuration U s ing the Console Pin g IP v 4 Y o u can us e the Ping IP v 4 screen to ping an IPv4 address. T o open the screen: 1. F rom the Sw itch Main Menu , se lect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Menu , select 6. IP Configuration . 3. F rom the IP Conf ...

  • Linksys SGE2010 - page 40

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 37 Sy stem Configuration U s ing the Console Pin g IP v 6 Y o u can us e the Ping IP v 6 sc reen to pi ng an IPv 6 ad dress. T o open the screen: 1. F rom the Sw itch Main Menu , se lect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Menu , select 6. IP Configuration . 3. F rom the IP ...

  • Linksys SGE2010 - page 41

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 38 Sy stem Configuration U s ing the Console Tr a c e R o u t e I P v 4 Y o u can us e the Tr a c e R o u t e I P v 4 screen to run a trace r oute test for an IPv4 address T o open the screen: 1. F rom the Sw itch Main Menu , se lect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Menu ...

  • Linksys SGE2010 - page 42

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 39 Sy stem Configuration U s ing the Console Tr a c e R o u t e I P v 6 Y o u can us e the Tr a c e R o u t e I P v 6 screen to run a trace r oute test for an IPv6 address . T o open the screen: 1. F rom the Sw itch Main Menu , se lect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Men ...

  • Linksys SGE2010 - page 43

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 40 Sy stem Configuration U s ing the Console F i le Mana gement The File Management Menu pro vides access to screens where y o u can download upgrade fi les from an IPv4 or IPv6 address. 1. Upgrade / Backup IPv4 (s ee page 40) 2. Upgrade / Backup IPv6 (s ee page 41) 3. Active Image (see page 42) 0.Bac ...

  • Linksys SGE2010 - page 44

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 41 Sy stem Configuration U s ing the Console T o enter the IPv4 Upgrade/ B ack up file nam e and location: 1. Select Ed it , and the n make the changes. Pre s s the Ta b key to move the cursor from one field to the ne xt. NO TE: S pecify the source and dest ination of the file , the file name, and the ...

  • Linksys SGE2010 - page 45

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 42 Sy stem Configuration U s ing the Console T o download a file from the sp ecified location: 3. V erify that the file name and location are correct. 4. Select Exec ute . 5. When the Oper ation c omplete message ap pears, press the Esc key to move the cursor to the Act io n li st. Ac t i ve I m a ge ...

  • Linksys SGE2010 - page 46

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 43 Sy stem Configuration U s ing the Console Restor e Sy stem Default Settings Y ou can restor e t he switch to the system defa ult set tings. T o restore system default settings 1. F rom the S w itch Main Menu , s elect 1. Sy stem Configuration . 2. F rom the Sy stem Configurat ion Menu , select 8. R ...

  • Linksys SGE2010 - page 47

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 44 Po r t S t a t u s U s ing the Console Stack C on figura tion Y o u can us e the Stack Configur ation screen to s pecify th e Stack ID f or the Ethernet swit ch. By default, ID numb ers are automatically assigned to each device. T o open this screen: 1. F rom the S w itch Main Menu , s elect 1. Sy ...

  • Linksys SGE2010 - page 48

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 45 Po r t S t a t u s U s ing the Console Po r t S t a t u s Y o u can us e the Por t St a tu s screen to view the por t connection status. Y ou can use the up or down arro w k eys t o sc roll th roug h al l th e po r t s o n the sw itch . NO TE: T o configur e por ts, use the P or t Configur ation sc ...

  • Linksys SGE2010 - page 49

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 46 Port Configuration U s ing the Console P or t C onfigura tion The Por t Configur ation Menu pr ovides a cc e ss to screens where yo u can view o r modify por t settings an d PoE settings. 1. P or t Settings (see page 46) 2. P oE Settings (see page 47) 0.Back (S elect to return to the previous scree ...

  • Linksys SGE2010 - page 50

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 47 Port Configuration U s ing the Console T o configure the por ts: 1. Select Ed it . 2. Pr oceed as needed: a. Press the down a rro w ke y to sc rol l do wn th rou g h th e l is t o f po r t s. b. P ress the right arr ow key to move the cursor fr om one field to the nex t within a row . c. T o change ...

  • Linksys SGE2010 - page 51

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 48 Sy stem Mode (Lay er 2 / Lay er 3) Selec tion U s ing the Console T o configure the PoE settings: 1. Select Ed it . 2. Pr oceed as needed: a. Press the down a rro w ke y to sc rol l do wn th rou g h th e l is t o f po r t s. b. P ress the right arr ow key to move the cursor fr om one field to the n ...

  • Linksys SGE2010 - page 52

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 49 Help U s ing the Console T o edit the system mode or stacking mode: 1. Select Ed it . 2. Pr oceed as needed: a. Press the down a rro w ke y to sc rol l do wn th rou g h th e l is t o f po r t s. b. P ress the Ta b key to move the cursor from one field to the next. c. T o change a setting, mov e the ...

  • Linksys SGE2010 - page 53

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 50 Logo ut U s ing the Console Lo go u t The Lo gout command lets you logout from the Ethernet switch. NO TE: When you issue this command, y ou are immediately logged off the Ethernet switch. ...

  • Linksys SGE2010 - page 54

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 51 Connec ting to the Switch w ith t he W eb -B ased Utilit y W eb Utili ty Configur ation 5 W eb Utilit y Configur ation Th is chapt er pro vides an int roduction t o the f eatures of the w eb-based confi g ura tion utility . Linksys switc h provides a comp lete web- base d utilit y to configure the ...

  • Linksys SGE2010 - page 55

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 52 V iew ing On -line He lp W eb Utili ty Configur ation V iewing On-line Help The W eb Utility has on-line Help including field defi nitions for each screen. T o access the on- line he lp for a par ticul ar screen, click th e Help button on the right side of the screen. ...

  • Linksys SGE2010 - page 56

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 53 US/ Canad a Con tacts A Contacts F or ad ditional information or t roubleshooting help , refe r to th e User Guid e on the CD-ROM. Additional suppor t is also available by phone o r online. US/C anada Contacts • 24-Hour T echnical Support: 800-326-7114 • RMA (Return Merchand ise Authorization): ...

  • Linksys SGE2010 - page 57

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 54 B C ustomer Site Sur vey Use this Customer Site Survey to gather customer contact informa t ion and other information about th e custome r site th at will be needed for th e imple mentation and i nstallati on of the Linksys So lutio n. Site Business Address Busi nes s Name Street Addres s City Stat ...

  • Linksys SGE2010 - page 58

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 55 How man y users are at y our site? Phone number and location of the telephone neare s t to th e Linksys equip ment Access Pro cedure s Spec ify room a ccess p roc edures ( for exam ple, must visit ing personne l be escorted by customer personn el?). Security/Saf ety Procedu res Specif y any speci a ...

  • Linksys SGE2010 - page 59

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 56 Limited W arranty C W arrant y I nf or mation Limited W a rran t y Linksys warrants th is Link sys hardware product against d efects in materials an d work manship under normal use f or the W a rranty P eri od, which be g i ns on the date of purchase by the origin al end-user purchaser and last s f ...

  • Linksys SGE2010 - page 60

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 57 Obtain ing W arranty S er vice T O T HE EXTEN T NOT PROHIBITED BY LA W , IN N O EVENT WILL LIN KSYS BE LIABLE FOR ANY L OST DA T A, RE VENUE OR PROFIT , OR FOR SPECIAL, INDIRECT , CONSEQUENTIAL, INCIDENT AL OR PUNITIVE DAMAGES, REGARDLESS OF THE THEORY OF LIABILIT Y (INCLUDING NEGLIGENCE), ARISING ...

  • Linksys SGE2010 - page 61

    SGE 2010 /S GE2 01 0P Adm in ist rati on Gui de 58 D F ederal Communica tion C ommission I n ter f erence Statement Th is Equipm ent has be en teste d and fo und to co mply with the limits for a Cl ass A dig ital dev ice, pursuant to part 15 of the FCC Rule s. These limits are designed to pr ovide reasonable protection against harmful interferenc e ...

  • Linksys SGE2010 - page 62

    SGE2010/SGE2010P A dministration Guide 59 E Specifications Model • SGE2010 48-port 10/100/1000 Ethernet Switch • SGE2010P 48-port 10/100/1000 Ethernet Switch with P oE • IEEE 802.3af P oE on delivered ov er any of the 48 10/100 ports • Po wer budget allows f or max power of 15.4W to an Ethernet port, with 360W available to all ports on regu ...

  • Linksys SGE2010 - page 63

    SGE2010/SGE2010P A dministration Guide 60 Envir onment Operating T emp: Operating T emp. 0ºC to 40ºC (32ºF to 104ºF) Storage T emp: Storage T emp. -20ºC to 70ºC Operating Humidity: Operating Humidity 10% to 90% relative humidity , Non- Condensing Storage Humidity: Storage Humidity 10% to 95% relative humidity , Non- Condensing W eb User I nte ...

  • Linksys SGE2010 - page 64

    SGE2010/SGE2010P A dministration Guide 61 Access C ontrol ACLs - Dr op or R ate Limit based on: Source and Destination MA C-based Source and Destination IP address Pr otocol Por t VLAN DSCP/IP Prec e dence T C P/UDP Source and Destination ports 802.1p priority Ethernet T ype ICMP packets IGMP packets DHCP Snooping ARP Inspec tion IP Source Address ...

  • Linksys SGE2010 - page 65

    SGE2010/SGE2010P A dministration Guide 62 Safety UL 60950-1 IEC60950-1 CB / TUV/Rh CSA-C22.2 No. 60950 EN 60950 AS/NZS 60950-1 C- Tic k EMC FCC P ar t 15 (CFR 47) Class A ICES-003 Class A EN 55022 Class A CISPR22 Class A EN 55024, EN 50082-1, EN 61000-3-2, EN 61000-3-3, EN 61000-6-1 Dimensions Metric: 440 mm ( W ) x 375 mm (H) x 44 mm (D) English: ...

  • Linksys SGE2010 - page 66

    080312A-LB ...

メーカー Linksys カテゴリー Switch

Linksys SGE2010のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- SGE2010の取扱説明書
- Linksysの製品カード
- パンフレット
- またはLinksys SGE2010の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Linksys SGE2010の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Linksys SGE2010の取り付け説明書、サービスマニュアル、簡易説明書、またはLinksys SGE2010のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Linksys SGE2010の製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Linksys SGE2010デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがLinksys SGE2010を使用するのを助ける技術的文書のことです。説明書は通常、全てのLinksys SGE2010ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Linksysの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Linksys SGE2010の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははLinksys SGE2010の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Linksys SGE2010に関してこのドキュメントで見つけることができる全てのヒントの目次
3. Linksys SGE2010デバイスの基本機能を使うにあたってのヒント。 Linksys SGE2010のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Linksys SGE2010に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるLinksys SGE2010のメーカー/サービスへの連絡先に関する情報。

Linksys SGE2010についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもLinksys SGE2010の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがLinksys SGE2010で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)