Weil-McLain EGH-105の取扱説明書

36ページ 0.88 mb
ダウンロード

ページに移動 of 36

Summary
  • Weil-McLain EGH-105 - page 1

    Control Supplement Control Supplement Control Supplement Control Supplement Control Supplement EGH EGH EGH EGH EGH Gas-Fired Boiler EGH-105 t o EGH-125 Series 4 Natural gas ‡ P art No. 550-110-677/0299 CSD -1 control system ‡ For propane boilers, install EGH propane conversion kit in addition to following the instructions in this Control Supple ...

  • Weil-McLain EGH-105 - page 2

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 2 The following terms are used throughout this Control Supplement to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product. Indicat ...

  • Weil-McLain EGH-105 - page 3

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 3 Carton guide T able 1 Boiler car tons V erify that the correct car tons are av ailable bef ore beginning assemb ly . Note that the Base assembly and T rim & controls car tons for CSD-1 are special. The CSD-1 ignition control panel (in Base assemb ly car ton) consists of igniti ...

  • Weil-McLain EGH-105 - page 4

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 4 Installation I Place the boiler Refer to the EGH Manual. Read Section I and follow all of its guidelines. Complete the following steps of Section I of the EGH Manual: • Placing the boiler • Installati ...

  • Weil-McLain EGH-105 - page 5

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 5 Install optional vent damper (if supplied) If not instal ling a vent damper , proc eed to next section ( Piping connections ). Once a vent damper has been operated on an EGH boiler , the boiler will no longer operate without a damper installed. Only dampers listed in the Replaceme ...

  • Weil-McLain EGH-105 - page 6

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 6 P iping connections II Connect steam (water) piping to the boiler per EGH Manual Section II. W ater boilers — make pr ovision for mounting probe low water cut off in the supply or retur n piping, above ...

  • Weil-McLain EGH-105 - page 7

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 7 Install boiler controls — steam boilers III Figure 4 Steam boiler connections T able 3 Steam boiler connections 32¾" 23 / " 13 16 (W ater line) 13½" 11¾" 27 / " 5 8 16 / " 3 16 2/" 11 16 1 6/" 5 8 24" C T EG D Return Supply risers ...

  • Weil-McLain EGH-105 - page 8

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 8 Gas piping V Size and connect gas supply piping per EGH Manual , Section V . The gas supply can enter from either the right or left side of the jacket. Be sure the gas train is directed to the correct sid ...

  • Weil-McLain EGH-105 - page 9

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 9 General The following sequence of operation applies to all wiring diagrams in this Supplement — both water and steam. Call for heat On a call for heat (from thermostat or operating control): 1 . Limit control and water level control contacts are assumed closed. 2 . V ent damper ...

  • Weil-McLain EGH-105 - page 10

    P art Number 550-110-677/0299 10 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS , REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A TOR SETTING IS 0.40 AMPS . 4. REFER T O CONTROL COMPONENT INSTR UCTIONS P ACKED WITH BOILER FOR AP ...

  • Weil-McLain EGH-105 - page 11

    P art Number 550-110-677/0299 11 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NOTE 10 TERMINAL BLOCK 1 2 A 1 A 2 W JUNCTION BO X EQUIPMENT GROUND (BY OTHERS) (NOTE 7) CIRCULA T OR N (NOTE 9) W Y H SWITCH SER VICE C WIRE NUTS (3) W BK Y BK G Y G ...

  • Weil-McLain EGH-105 - page 12

    P art Number 550-110-677/0299 12 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-02 1 2 3 4 5 6 10 8 9 11 12 14 15 15 16 17 18 19 20 24 21 25 21 22 23 7 V ent connections — Connect with ¼" tubing and run vent line outside building per code requirements. Install strain relief bushin ...

  • Weil-McLain EGH-105 - page 13

    P art Number 550-110-677/0299 13 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control panel 14 Pilot shutoff valv e 2 Ignition control 15 Leak test v alv es with plugs 3 Impulse rela y and lighted push-b utton alarm silencing s witch 16 ...

  • Weil-McLain EGH-105 - page 14

    P art Number 550-110-677/0299 14 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS, REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A T OR SETTING IS 0.40 AMPS. 4. REFER T O CONTROL COMPONENT INSTR UCTIONS P ACKED WITH BOILER FOR APP ...

  • Weil-McLain EGH-105 - page 15

    P art Number 550-110-677/0299 15 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NO TE 10 TERMINAL BLOCK 1 2 A 1 A 2 W JUNCTION BO X EQUIPMENT GROUND (BY O THERS) (NO TE 7) N H SWITCH SER VICE C WIRE NUTS (2) W BK G Y G BK BK D AMPER TO BK R TRANS ...

  • Weil-McLain EGH-105 - page 16

    P art Number 550-110-677/0299 16 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-01 1 2 3 4 5 6 10 8 9 11 12 14 15 15 16 17 18 19 20 21 22 23 24 25 25 26 27 Install strain relief bushings wherev er electr ical wiring passes through jack et. 7 V ent connections — Connect with ¼" tub ...

  • Weil-McLain EGH-105 - page 17

    P art Number 550-110-677/0299 17 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control panel 14 Pilot shutoff valv e 2 Ignition control 15 Leak test valves with plugs 3 Impulse rela y and lighted push-b utton alarm silencing s witch 16 G ...

  • Weil-McLain EGH-105 - page 18

    P art Number 550-110-677/0299 18 o NOTES: TO COMPONENT MANUF ACTURER’S INSTR UCTIONS FOR APPLICA TION WIRING AND FOR MUL TIPLE ZONE SYSTEMS USING ZONE V AL VES OR CIRCULA TORS, REFER 5. THERMOST A T - FOR SINGLE ZONE SYSTEMS, THERMOST A T ANTICIP A T OR SETTING IS 0.40 AMPS. 4. REFER T O CONTROL COMPONENT INSTR UCTIONS P ACKED WITH BOILER FOR APP ...

  • Weil-McLain EGH-105 - page 19

    P art Number 550-110-677/0299 19 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement NO TE 10 TERMINAL BLOCK 1 2 A 1 A 2 W JUNCTION BO X EQUIPMENT GROUND (BY O THERS) (NO TE 7) N H SWITCH SER VICE C W BK G Y G BK BK D AMPER TO BK R TRANSFORMER 120/24 ...

  • Weil-McLain EGH-105 - page 20

    P art Number 550-110-677/0299 20 MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-01-p 1 2 3 4 5 6 7 10 8 9 11 12 14 15 15 16 17 18 19 20 21 22 25 25 26 27 23 24 Install strain relief bushings wherev er electr ical wiring passes through jack et. V ent connections — Connect with ¼" tubing and run vent line outside building per code re ...

  • Weil-McLain EGH-105 - page 21

    P art Number 550-110-677/0299 21 CSD-1 control system — Natural gas EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement 1 CSD-1 control panel 14 P ilot shutoff v alv e 2 Ignition control 15 Leak test valv es with plugs 3 Impulse rela y and lighted push-b utton alarm silencing s witch 1 ...

  • Weil-McLain EGH-105 - page 22

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 22 Final adjustments VII 1 . Follow EGH Manual instructions for Final Adjustments , Section VII, including filling the boiler and skimming steam boilers. Skimming the boiler as described in Section VII of t ...

  • Weil-McLain EGH-105 - page 23

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 23 Final adjustments — operating instructions VII Figure 11 Operating instructions ...

  • Weil-McLain EGH-105 - page 24

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 24 Check - out procedure — operation VIII Always follow boiler Operating instructions , Figure 11, when starting the boiler . F ailure to do so could r esult in sev ere personal injury , death or substant ...

  • Weil-McLain EGH-105 - page 25

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 25 Check - out procedure — leak test VIII 677-11 1 2 4 3 T o control panel Fo r your safety , turn off electrical power supply before making any electrical connections to avoid possible shock hazard. 1 . T urn off p owe r to the boiler and rem ove the (RED) wire from terminal TH o ...

  • Weil-McLain EGH-105 - page 26

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 26 Check - out procedure — troubleshooting VIII V erify proper operation after servicing Never jumper (bypass) any device except for momentary testing as outlined in T roubleshooting Char ts. Substantial ...

  • Weil-McLain EGH-105 - page 27

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 27 Check - out procedure — troubleshooting VIII VISU ALL Y CHECK — Is ground wire connected from GND (Burner) to ignition control mounting screw , and ground wire connected from transf or mer ter minal C to case ground? Correct by making connections . Is 24V A C present across t ...

  • Weil-McLain EGH-105 - page 28

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 28 Check - out procedure — troubleshooting VIII Is damper harness securely plugged in at both ends? Secure connections . Is 24V A C present across transf ormer ter minals C & Y ? Check f or open ther ...

  • Weil-McLain EGH-105 - page 29

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 29 Check - out procedure — troubleshooting VIII Set up microammeter to measure output current in flame sensor circuit as f ollows . a . Detach sense lead from ignition control. Attach negative lead from microammeter to sense terminal on ignition control. b . Attach positive lead t ...

  • Weil-McLain EGH-105 - page 30

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 30 Check - out procedure — troubleshooting VIII Are pilot valv e wir ing connections CORRECT and securely fastened? Connect securely to terminal PV on ignition control and terminal TR on main gas valve . ...

  • Weil-McLain EGH-105 - page 31

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 31 Service and maintenance IX Complete Installation and Service Certificate in EGH Manual , Section IX. Fol l ow EGH Manual , Section IX, fo r serv ice and maintenanc e of boiler . ...

  • Weil-McLain EGH-105 - page 32

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 32 Replacement parts — water boilers X Figure 14 W ater boiler assembl y MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-12 1 2 5 6 10 9 11 12 1 ...

  • Weil-McLain EGH-105 - page 33

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 33 T able 5 W ater boiler replacement par ts Before r eplacing any parts on the boiler — T urn off power to boiler and shut off g as supply . Failure t o comply c ould result in sev ere personal injury , death or substantial propert y damage. Item Part description Boiler models Ve ...

  • Weil-McLain EGH-105 - page 34

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 34 Replacement parts — steam boilers X Figure 15 Steam boiler assembly MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK MV MV/PV PV ALARM ALARM 24 V 24 V (GND) SENSE SPARK 677-13 1 2 5 6 10 9 11 12 13 ...

  • Weil-McLain EGH-105 - page 35

    CSD-1 control system — Natural gas P art Number 550-110-677/0299 35 T able 6 Steam boiler replacement par ts Before r eplacing an y parts on the b oiler — T ur n off power t o boiler and shut off gas supply . Failure to c omply could result in sev ere personal injury , death or substantial propert y damage. Item Part description Boiler models V ...

  • Weil-McLain EGH-105 - page 36

    EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 EGH-105 to EGH-125 Control Supplement P art Number 550-110-677/0299 36 W eil-McLain 500 Blaine Street Michigan City , IN 46360-2388 http://www .weil-mclain.com ...

メーカー Weil-McLain カテゴリー Boiler

Weil-McLain EGH-105のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- EGH-105の取扱説明書
- Weil-McLainの製品カード
- パンフレット
- またはWeil-McLain EGH-105の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Weil-McLain EGH-105の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Weil-McLain EGH-105の取り付け説明書、サービスマニュアル、簡易説明書、またはWeil-McLain EGH-105のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Weil-McLain EGH-105の製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Weil-McLain EGH-105デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがWeil-McLain EGH-105を使用するのを助ける技術的文書のことです。説明書は通常、全てのWeil-McLain EGH-105ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Weil-McLainの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Weil-McLain EGH-105の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははWeil-McLain EGH-105の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Weil-McLain EGH-105に関してこのドキュメントで見つけることができる全てのヒントの目次
3. Weil-McLain EGH-105デバイスの基本機能を使うにあたってのヒント。 Weil-McLain EGH-105のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Weil-McLain EGH-105に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるWeil-McLain EGH-105のメーカー/サービスへの連絡先に関する情報。

Weil-McLain EGH-105についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもWeil-McLain EGH-105の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがWeil-McLain EGH-105で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)