Weil-McLain LGB-9の取扱説明書

11ページ 0.99 mb
ダウンロード

ページに移動 of 11

Summary
  • Weil-McLain LGB-9 - page 1

    P art Number 550-141-797/0798 Contents I . New installation ........... 2 II . Existing installation ..... 4 III. Gas piping ..................... 5 IV. Wiring ............................ 5 Sequence of operation ..... 8 Wiring procedure .............. 8 V. Operating instructions . 9 VI. Parts list – U.S. ........... 1 0 VII.Parts list – Canadi ...

  • Weil-McLain LGB-9 - page 2

    P art Number 550-141-797/0798 2 LGB -6 to LGB -23 Series 2 – Control Su pplement New installation I 1 . R emove all bu r ners from base bo x assembly . Remo ve 3.95 mm natural gas main burner orifices in manifold. Install 2.40 mm propane gas main burner orifices. Use pipe dope sparingly only on male ends. Use pipe dope compatible with propane gas ...

  • Weil-McLain LGB-9 - page 3

    P art Number 550-141-797/0798 3 U niv ersal Control Syst em – Pr opane gas Figure 1 Pilot burner assembly , typical LGB-A84-B Locating Slot Igniter Sensor UCS Pilot Burner 10-32 x 5/16“ Machine Screws(2) Ground Leadwire: Connect to Pilot Proving Module 24 V (GND) terminal Pilot Mounting Bracket 10-32 x 1/4“ Machine Screws (2) Main Burner (wit ...

  • Weil-McLain LGB-9 - page 4

    P art Number 550-141-797/0798 4 LGB -6 to LGB -23 Series 2 – Control Su pplement 1 . These instructions are for use with Propane Control Cartons as listed in Gas Control Arrangement, T able 2 (page 2). 2 . Remove jacket door(s) and access panel(s). 3 . Disconnect wiring and tubing from existing pilot burner and main flame sensor . 4 . Remove all ...

  • Weil-McLain LGB-9 - page 5

    P art Number 550-141-797/0798 5 U niv ersal Control Syst em – Pr opane gas 1 . Contact gas supplier to siz e pip es, tanks and regulator . a. Inlet gas pressure to manual main shut-off gas valve — minimum 11” W .C., maximum 13” W .C. b. If pressure to gas valv e exc eeds 13” W .C., install 100% lock-up gas pressure regulat or upstream of ...

  • Weil-McLain LGB-9 - page 6

    P art Number 550-141-797/0798 6 LGB -6 to LGB -23 Series 2 – Control Su pplement P art Number 550-141-797/0798 7 U niv ersal Control Sy stem – P ropane gas Figure 3 Wiring diagram ...

  • Weil-McLain LGB-9 - page 7

    P art Number 550-141-797/0798 8 LGB -6 to LGB -23 Series 2 – Control Su pplement Wiring Procedure IV Wiring – continued 1 . Determine right or left electrical supply wiring. 2 . Attach electrical junction box(es) to inside jacket end panel. Screws and nuts are provided. For dual base boilers, use offset nipples (provided) to co nnec t juction b ...

  • Weil-McLain LGB-9 - page 8

    P art Number 550-141-797/0798 9 U niv ersal Control Syst em – Pr opane gas This document is intended only as a supplement to the LGB Gas-Fired Boiler Manual . Follow all instructions in the Manual, including those regarding start-up (found in Section VIII, “Placing boiler in operation ”). A . This boiler is equipped with a pilot which must be ...

  • Weil-McLain LGB-9 - page 9

    P art Number 550-141-797/0798 10 LGB -6 to LGB -23 Series 2 – Control Su pplement VI P arts list - U .S . boilers Figure 5 U .S. parts drawing Ref. No. Descrip tion Size Vendor/ Part Number Weil-McL ain Part Numb er 1 Main f lame se nsor Honey wel l 392956 511-724- 274 Main b urner with pilot brac ket Weil -McLai n 512-200-055 Main f lame se nsor ...

  • Weil-McLain LGB-9 - page 10

    P art Number 550-141-797/0798 11 U niv ersal Control Syst em – Pr opane gas VII P arts list - Canadian boilers Figure 6 Canadian parts drawing Ref. No. Description Size Vendor/Part Number* 1 Main flame sensor Hone y well 392956 Main burner with p ilot bracket Main flame sensor bracket 1" Kinco-Balon 500 1 ¼" K inco-Balon 600 1" Ho ...

  • Weil-McLain LGB-9 - page 11

    P art Number 550-141-797/0798 12 LGB -6 to LGB -23 Series 2 – Control Su pplement W eil-McLain 500 Blaine Street Michigan City , IN 46360-2388 http://www .weil-mclain.com ...

メーカー Weil-McLain カテゴリー Boiler

Weil-McLain LGB-9のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- LGB-9の取扱説明書
- Weil-McLainの製品カード
- パンフレット
- またはWeil-McLain LGB-9の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Weil-McLain LGB-9の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Weil-McLain LGB-9の取り付け説明書、サービスマニュアル、簡易説明書、またはWeil-McLain LGB-9のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Weil-McLain LGB-9の製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Weil-McLain LGB-9デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがWeil-McLain LGB-9を使用するのを助ける技術的文書のことです。説明書は通常、全てのWeil-McLain LGB-9ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Weil-McLainの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Weil-McLain LGB-9の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははWeil-McLain LGB-9の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Weil-McLain LGB-9に関してこのドキュメントで見つけることができる全てのヒントの目次
3. Weil-McLain LGB-9デバイスの基本機能を使うにあたってのヒント。 Weil-McLain LGB-9のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Weil-McLain LGB-9に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるWeil-McLain LGB-9のメーカー/サービスへの連絡先に関する情報。

Weil-McLain LGB-9についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもWeil-McLain LGB-9の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがWeil-McLain LGB-9で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)