Manual Powerware 208/120V

72 pages 2.25 mb
Download

Go to site of 72

Summary
  • Powerware 208/120V - page 1

    Powerware Energy Management System (EMS) Upgrade Kit (208/120V, 380/220V, 400/230V, 415/240V) User’s Guide ® ...

  • Powerware 208/120V - page 2

    Requesting a Declaration of Conformity Units that are labeled with a CE mark comply with the following harmonized standards and EU directives: S Harmonized Standard: IEC 61010−1:2001−02 S EU Directives: 2006/95/EC, Council Directive on equipment designed for use within certain voltage limits 2004/108/EC, Council Directive relating to electromag ...

  • Powerware 208/120V - page 3

    Special Symbols The following are examples of symbols used on the UPS or accessories to alert you to important information: RISK OF ELECTRIC SHOCK − Observe the warning associated with the risk of electric shock symbol. CAUTION: REFER TO OPERATOR’S MANUAL − Refer to your operator’s manual for additional information, such as important operat ...

  • Powerware 208/120V - page 4

    ...

  • Powerware 208/120V - page 5

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com i Table of Contents 1 Introduction 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Safety Warnings 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  • Powerware 208/120V - page 6

    TABLE OF CONTENTS EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com ii 4 Communication 49 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installing Communication Features 50 . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  • Powerware 208/120V - page 7

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 1 Chapter 1 Introduction Eaton’s Powerware ® Energy Management System (EMS) Upgrade Kit (EMS−UGK) is designed to monitor energy usage of existing power distribution panelboards, remote power panels, or power distribution units. Prov ...

  • Powerware 208/120V - page 8

    INTRODUCTION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 2 The following options for the EMS−UGK are available: S Single panel (42 circuits) or dual panel (84 circuits) S 208/120V or 380/220V, 400/230V, 415/240V rating S Liquid crystal display (LCD) for local indication of energ ...

  • Powerware 208/120V - page 9

    INTRODUCTION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 3 Safety Warnings IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This manual contains important instructions that you should follow during installation and operation of the EMS−UGK. Please read all instructions befo ...

  • Powerware 208/120V - page 10

    INTRODUCTION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 4 Consignes de sécurité CONSIGNES DE SÉCURITÉ IMPORTANTES CONSERVER CES INSTRUCTIONS Ce manuel contient des instructions importantes que vous êtes invité à suivre lors de toute procédure d’installation et de foncti ...

  • Powerware 208/120V - page 11

    INTRODUCTION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 5 Sicherheitswarnungen WICHTIGE SICHERHEITSANWEISUNGEN AUFBEWAREN Dieses Handbuch enthält wichtige Hinweise, welche Sie bei der Installation und Wartung des EMS−UGK beachten sollten. Bitte lesen Sie alle Anweisungen des H ...

  • Powerware 208/120V - page 12

    INTRODUCTION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 6 Advertencias de Seguridad INSTRUCCIONES DE SEGURIDAD IMPORTANTES GUARDE ESTAS INSTRUCCIONES Este manual contiene instrucciones importantes que debe seguir durante la instalación y el funcionamiento de la EMS−UGK. Por fa ...

  • Powerware 208/120V - page 13

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 7 Chapter 2 Installation This section explains: S Equipment inspection S Unpacking S Parts list S Required tools S Installation and wiring S Initial configuration S Advanced Metering installation Inspecting the Equipment If any equipment ...

  • Powerware 208/120V - page 14

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 8 Checking the Parts List Verify that the following items are included with the EMS−UGK. All models Electronics module (display optional) Mounting bracket (installed on electronics module) EMS Configuration Tool CD for set ...

  • Powerware 208/120V - page 15

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 9 Main input monitoring option only (one set for each panel if ordered) (1) Main input harness, with one 28−position circular connector and five 2−position connector plugs (A, B, C, Ground, Neutral) (4) Main CTs, split? ...

  • Powerware 208/120V - page 16

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 10 Installing the Hardware NOTE Review the wiring planning requirements in Step 3 on page 14 as an aid to locating an appropriate site for the EMS−UGK. To install the EMS−UGK on a wall: 1. Verify that the wall on which t ...

  • Powerware 208/120V - page 17

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 11 3. Attach the mounting bracket to the wall with appropriate wall anchors (not supplied). See the mounting template in Figure 3. Verify that at least two wall anchors attach to studs within the wall. 376.5 mm (14.82") ...

  • Powerware 208/120V - page 18

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 12 8. If installing a right conduit box, connect the DB−9 extender cable (installed on the extended serial port on the inside of the right conduit box) to the serial port (Service) on the electronics module. Figure 4 shows ...

  • Powerware 208/120V - page 19

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 13 Electrical Connections W A R N I N G S Only qualified service personnel (such as a licensed electrician) shall perform the electrical installation. Risk of electrical shock. S Always follow all personal protective equipme ...

  • Powerware 208/120V - page 20

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 14 3. Plan the wiring route from the electronics module to the monitored breaker panel(s). See Table 2 through Table 4, Figure 5, and use the following guidelines. S Mount the electronics module within 3.05m (10 ft) of a dis ...

  • Powerware 208/120V - page 21

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 15 Table 4. Harness Sizing Harness Bundled Length Connection Lead Length Voltage 3.05m (10 ft) Phases (A, B, C) 0.91m (3 ft) Ground (V1 only), Neutral 1.83m (6 ft) Main Input 2.74m (9 ft) Phases (A, B, C), Neutral, Ground 30 ...

  • Powerware 208/120V - page 22

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 16 4. Connect the circular connector of each harness to the electronics module. Verify the harness label matches the connector label on the electronics module. See Figure 6 and Table 5. Figure 7 shows a detailed view of both ...

  • Powerware 208/120V - page 23

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 17 Figure 7. Panel Detail (EMS−UGK−LV Model with Dual Panel Option Shown) NOTE Single Panel option only. Connections for CT1, CT2, CTM, and V2 on Input 2 / Panel 2 are covered with hole plugs. ...

  • Powerware 208/120V - page 24

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 18 5. Main input monitoring option only. Connect the main input harness to the breaker panel (see Figure 8): NOTE If you prefer not to install the Neutral CT, the EMS−UGK software can perform an approximate calculation of ...

  • Powerware 208/120V - page 25

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 19 6. 75A or 100A Split−Core Branch CT option only. Connect the two branch circuit harnesses to the breaker panel (see Figure 9): NOTE Each connector on the branch circuit harness is labeled with two numbers, such as 1/ ...

  • Powerware 208/120V - page 26

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 20 9. Subfeed Accessory only. Locate the Subfeed Accessory Kit (three subfeed transition harnesses and three 400A CTs). Connect a subfeed transition harness to each CT. See Figure 10. Install each CT around the appropriate s ...

  • Powerware 208/120V - page 27

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 21 C A U T I O N S Panel 1 voltage sensing includes a ground wire, but Panel 2 voltage sensing does not. If installing dual panels, connect the voltage harness V1 for Panel 1 first. When disconnecting dual panels, disconnect ...

  • Powerware 208/120V - page 28

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 22 13. Unoccupied three−phase branch circuit breaker connection only. Verify that the branch circuit breaker is turned off. Be absolutely certain there is no power. Attach a wire tap transition harness (supplied) to each o ...

  • Powerware 208/120V - page 29

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 23 NOTE Use wire taps ONLY on thermoplastic insulation (PVC). 14. Occupied three−phase branch circuit breaker connection only. Verify that the branch circuit breaker is turned off. Be absolutely certain there is no power. ...

  • Powerware 208/120V - page 30

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 24 17. If installing communication functions, install the wiring for the Alarm Relay and Building Alarms connections. For more information, see Communication" on page 49. 18. Start up the host equipment. Refer to the ...

  • Powerware 208/120V - page 31

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 25 Initial Configuration This section describes how to use the supplied software configuration tool to perform initial configuration and calibration. You can use either the tool or the optional display (if installed) to conf ...

  • Powerware 208/120V - page 32

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 26 Initial System Configuration To configure required and optional system settings: 1. Verify the EMS−UGK is physically connected to all installed CTs. 2. Verify that main voltages are connected and the EMS−UGK is powere ...

  • Powerware 208/120V - page 33

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 27 5. Verify that meter and status information from the EMS−UGK displays on the page, similar to the example shown in Figure 15. NOTE Because the system is not yet configured, active alarms may appear in the Active Alarms ...

  • Powerware 208/120V - page 34

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 28 6. Click the EMS System Settings tab to display the Configure Primary EMS Settings page. 7. Configure the following required settings: EMS System Setting Description Nominal Voltage Settings Verify the nominal input volta ...

  • Powerware 208/120V - page 35

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 29 8. Optional. To prevent the software configuration tool from synchronizing with the PC date and time, select Don’t auto update . 9. Click Save Sys Config to save the settings to the EMS−UGK. Depending on communication ...

  • Powerware 208/120V - page 36

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 30 11. Click the Feature Settings tab to display the EMS Feature Settings page. 12. Configure the following Miscellaneous Features: Feature Setting Description Audible Horn Disabled Select to disable the audible horn. If ena ...

  • Powerware 208/120V - page 37

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 31 15. To configure panels and breakers using the software configuration tool, continue to the following section, Initial Panel and Breaker Configuration (Using the Software Configuration Tool)." To configure panels ...

  • Powerware 208/120V - page 38

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 32 4. Configure the following settings for the selected panel: Panel Setting Description Panel Rating Specify the panel breaker rating (in amps). NOTE Setting the panel breaker rating to 0 silences all main panel breaker ala ...

  • Powerware 208/120V - page 39

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 33 9. The selected breaker is highlighted in bold in the schedule. The breaker’s configuration details display in the right half of the page. Click the breaker to configure. The breaker number highlights and its details di ...

  • Powerware 208/120V - page 40

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 34 Initial Panel and Breaker Configuration (Using the Display) NOTE Use this section only if the optional display is installed. Configure the panel and breaker data. You can use the following abbreviated instructions or foll ...

  • Powerware 208/120V - page 41

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 35 11. From the setup screen, clear the History Log and Load Profile. For detailed instructions, see Setup Options on page 42. 12. Continue to the following section, Advanced Metering Installation." ...

  • Powerware 208/120V - page 42

    INSTALLATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 36 Advanced Metering Installation The Power Xpert Gateway Series 1000 Card (shown in Figure 16) is factory−installed in the X−Slot communication bay on the side of the EMS−UGK electronics module. To connect the cables ...

  • Powerware 208/120V - page 43

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 37 Chapter 3 Operation This chapter describes how to use the Energy Management System (EMS) Upgrade Kit (EMS−UGK) interface. Reset Function The EMS−UGK is intended for continuous duty operation. Cycle power for the EMS−UGK using th ...

  • Powerware 208/120V - page 44

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 38 Control Panel Functions NOTE Use this section only if the optional display is installed. The EMS−UGK has a graphical LCD with backlight, four status LEDs, and five control buttons (see Figure 18). The display provides usef ...

  • Powerware 208/120V - page 45

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 39 Display Functions The LCD displays the Eaton Powerware logo. Press any button to activate the mimic screen and menu options (see Figure 19). The mimic screen shows a real−time graphical representation of the operating stat ...

  • Powerware 208/120V - page 46

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 40 Menu Map The following tables show the basic menu structure. Table 6. Menu Map for Display Functions Main Menu Submenu Display Information or Menu Function Events Active Events Displays list of active system events. As event ...

  • Powerware 208/120V - page 47

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 41 Table 7. Panel Meters Screen Label Meters Displayed Panel (first screen) ALM %LOAD Vavg Imax Alarm status ( W for warnings, A for critical alarms) Ratio (in percent) of present load compared to maximum Average voltage Phase ...

  • Powerware 208/120V - page 48

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 42 Setup Options Access to setup options is restricted to three System Setup Levels: 0, 1, or 2. The higher the level, the more setup options are available. Options on System Setup Level 0 do not require password access. Table ...

  • Powerware 208/120V - page 49

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 43 Control Panel Configuration NOTE Use this section only if the optional display is installed. To set up branch circuit monitoring on your product, configure the panels and branch circuit breakers. Configuration requires Syste ...

  • Powerware 208/120V - page 50

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 44 4. On the PANEL CONFIG screen, set the panel’s meter settings: Default Range Meter Setting Description 3 3 PHASES Number of phases 42 0–42 (even numbers) BREAKERS Number of branch circuit breakers in the panel 100 0–12 ...

  • Powerware 208/120V - page 51

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 45 4. On the PANEL CONFIG screen, set the panel’s meter settings: Default Range Meter Setting Description 3 3 PHASES Number of phases 42 0–42 (even numbers) BREAKERS* Number of subfeed breakers in the panel, times 3 100 0? ...

  • Powerware 208/120V - page 52

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 46 Configuring Branch Circuit Breakers Follow the appropriate steps to configure, remove, or change the branch circuit breakers. To configure the branch circuit breakers (up to 42 per panel): 1. If not already obtained, access ...

  • Powerware 208/120V - page 53

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 47 6. When the individual circuit configuration is complete, select OK to return to the PANEL SCHEDULE screen to configure the next breaker. 7. When all branch circuit configuration is complete, select the button repeatedly to ...

  • Powerware 208/120V - page 54

    OPERATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 48 Viewing Panel Meters NOTE Use this section only if the optional display is installed. To view the meters for the panels: 1. From the main menu, select METER then PANEL. 2. Use the arrow keys to scroll through the panel meter ...

  • Powerware 208/120V - page 55

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 49 Chapter 4 Communication This section describes the communication features of the Energy Management System (EMS) Upgrade Kit (EMS−UGK): S Serial port (Service) S X−Slot card (Power Xpert Gateway Series 1000 Card) S Relay output con ...

  • Powerware 208/120V - page 56

    COMMUNICATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 50 Installing Communication Features To install the communication options and control terminals: 1. Install and connect the appropriate cable(s). See the following section, Communication Options," or Control Term ...

  • Powerware 208/120V - page 57

    COMMUNICATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 51 Use the computer’s HyperTerminal ® (or equivalent) application to access Terminal mode. Table 11 lists available keystroke combinations for using Terminal mode through the EMS−UGK communication port. Table 11. Termi ...

  • Powerware 208/120V - page 58

    COMMUNICATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 52 Control Terminals The cables should be connected to the control terminals with a mating connector. The relay contact terminals have functional electrical isolation from the system. The building alarms share a common (– ...

  • Powerware 208/120V - page 59

    COMMUNICATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 53 Relay Output Contacts (Alarm Relay) The EMS−UGK incorporates a programmable relay output with potential free contacts for remote alarm indications. The SPDT (single pole double throw) relay provides both NO and NC cont ...

  • Powerware 208/120V - page 60

    COMMUNICATION EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 54 ...

  • Powerware 208/120V - page 61

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 55 Chapter 5 Maintenance Keep the area around the hardware and wiring clean and dust-free. Wipe with a dry cloth as needed. The Energy Management System (EMS) Upgrade Kit (EMS−UGK) does not require an annual calibration. Recycling the ...

  • Powerware 208/120V - page 62

    MAINTENANCE EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 56 Rewiring and Reconfiguring the Installation D A N G E R This EMS−UGK contains LETHAL VOLTAGES . All repairs and service should be performed by AUTHORIZED SERVICE PERSONNEL ONLY . There are NO USER SERVICEABLE PARTS insid ...

  • Powerware 208/120V - page 63

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 57 Chapter 6 Specifications Table 12. Dimensions and Weight Component Weight Dimensions (WxHxD) Electronics module (dual panel with display) 8.2 kg (18 lb) 377 284 118 mm (14.8 " 11.2 " 4.6 " ) Electronics module (dual pan ...

  • Powerware 208/120V - page 64

    SPECIFICATIONS EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 58 Table 14. Electrical Input Nominal Voltage EMS−UGK−LV: 208/120V EMS−UGK−HV: 380/220V, 400/230V, 415/240V Nominal Frequency (Range) 50/60 Hz (45–65 Hz) Input Conductor Configuration Panel 1: 3 wire + N + Gnd Pa ...

  • Powerware 208/120V - page 65

    SPECIFICATIONS EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 59 Table 17. Metering Panel Monitoring Rating Maximum 400A CT1, CT2, CTM connections: 240V CAT III V1, V2 connections: 208V CAT III for EMS−UGK−LV, 415V CAT III for EMS−UGK−HV Branch Circuits Monitors up to 84 indi ...

  • Powerware 208/120V - page 66

    SPECIFICATIONS EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 60 ...

  • Powerware 208/120V - page 67

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 61 Chapter 7 Troubleshooting Typical Alarms and Conditions The following table describes typical alarms and conditions for the EMS−UGK. For further help, please contact the Help Desk. To silence the horn, press any button. To view the ...

  • Powerware 208/120V - page 68

    TROUBLESHOOTING EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 62 ...

  • Powerware 208/120V - page 69

    EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 63 Chapter 8 Warranty Limited Factory Warranty Powerware Energy Management System (EMS) Upgrade Kit WARRANTOR: The warrantor for the limited warranties set forth herein is Eaton Electrical Inc., a Delaware Corporation (Eaton"). L ...

  • Powerware 208/120V - page 70

    WARRANTY EATON Powerware ® Energy Management System (EMS) Upgrade Kit User’s Guide S 164201724 Rev 1 www.powerware.com 64 END−USER’S OBLIGATIONS: In order to receive the benefits of this Warranty, the End−User must use the Product in a normal way, follow the Product’s user’s guide, and protect against further damage to the Product if t ...

  • Powerware 208/120V - page 71

    ...

  • Powerware 208/120V - page 72

    *1642017241* 164201724 1 ...

Manufacturer Powerware Category Power Supply

Documents that we receive from a manufacturer of a Powerware 208/120V can be divided into several groups. They are, among others:
- Powerware technical drawings
- 208/120V manuals
- Powerware product data sheets
- information booklets
- or energy labels Powerware 208/120V
All of them are important, but the most important information from the point of view of use of the device are in the user manual Powerware 208/120V.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Powerware 208/120V, service manual, brief instructions and user manuals Powerware 208/120V. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Powerware 208/120V.

A complete manual for the device Powerware 208/120V, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Powerware 208/120V by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Powerware 208/120V.

A complete Powerware manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Powerware 208/120V - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Powerware 208/120V, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Powerware 208/120V, that we can find in the current document
3. Tips how to use the basic functions of the device Powerware 208/120V - which should help us in our first steps of using Powerware 208/120V
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Powerware 208/120V
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Powerware 208/120V in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Powerware 208/120V?

Use the form below

If you did not solve your problem by using a manual Powerware 208/120V, ask a question using the form below. If a user had a similar problem with Powerware 208/120V it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)