Manual Sterling SSE-2

72 pages 3.41 mb
Download

Go to site of 72

Summary
  • Sterling SSE-2 - page 1

    Sterling Material Processing Operating Instructions Single Conveying Hopper Loader SSE-2 ...

  • Sterling SSE-2 - page 2

    SSE 2 ii Sterling Material Processing 5200 West Clinton Ave. Milwaukee, WI 53223 Telephone: (414) 354-0970 Fax: (414) 354-6421 www.sterlco.com Technical service: Service department Telephone: (800) 423-3183 Edition: 02/04 Bulletin #: SM4-615.2 These operating instructions are for*: (* please fill in personally) Serial number: Year of manufature: Da ...

  • Sterling SSE-2 - page 3

    SSE 2 iii Sterling Material Processing retains all rights to change the information in these operating instructions at any time without notice. We assume no liability for any errors or direct or indirect damage resulting in context with these operating instructions. Copying, translation or publication in any form except for personal use of purchase ...

  • Sterling SSE-2 - page 4

    SSE 2 iv ...

  • Sterling SSE-2 - page 5

    Please note that our address and phone information has changed. Please reference this page for updat ed contact information. These manuals are obsolet e and are provided only for their technical information , data and capacities. Portions of these manuals detailing procedures or precautions in the operation, inspection, main tenanc e and repair of ...

  • Sterling SSE-2 - page 6

    SSE 2 v Table of Contents 1. Gen er al i ns tr uc ti on s ......................................................................................................... 1 -1 1.1. Warnings and symbols ..... .... .... .... .... ..... .... .... .... .... .... ..... .... .... .... .... .... ..... .... .... .... .... ..... .... .... .... .... .... .... 1-2 1 ...

  • Sterling SSE-2 - page 7

    SSE 2 vi 8. Mai nt en an ce ..................................................................................................................... 8-1 8.1. Maintenance intervals....... .... .... .... .... .... ..... .... .... .... .... .... ..... .... .... .... .... .... ..... .... .... .... .... ..... .... .... .... .... .... 8-3 8.2. Servicing the ...

  • Sterling SSE-2 - page 8

    SSE 2 General instructions 1-1 1. General instructions M These instructions apply to all persons within the range of action of the equipment. These operating instructions are to be used by all persons assigned activities connected with the equipment. ...

  • Sterling SSE-2 - page 9

    SSE 2 1-2 General instructions 1.1. Warnings and symbols The following warnings and symbols are used in these operating instructions: M This symbol indicates danger to life. Fatal or serious injury is possible if the corresponding instructions, regulations or warnings are not observed. L This symbol indicates that serious injury is possible if the ...

  • Sterling SSE-2 - page 10

    SSE 2 General instructions 1-3 1.2. Explanations and information Various terms are used in these operating instructions to ensure clarity. Therefore please note that the terms used in the text stand for the corresponding explanations listed below. • Equipment: ”Equipment” can mean an individual unit, a machine or an installation. • Operatin ...

  • Sterling SSE-2 - page 11

    ...

  • Sterling SSE-2 - page 12

    SSE 2 Safety instructions 2-1 2. Safety instructions M These safety instructions apply to all persons within the range of action of the equipment, and should be used by all persons assigned activities connected with the equipment. Please inform all persons within the range of action of the equipment of the direct and indirect hazards connected with ...

  • Sterling SSE-2 - page 13

    SSE 2 2-2 Safety instructions 2.1. For your safety 2.1.1. General To prevent injury and/or damage to equipment, observe the following safety rules: • Read these operating instructions carefully before operating for the first time. Contact us should questions arise. • These operating instructions must be kept available at all times at the place ...

  • Sterling SSE-2 - page 14

    SSE 2 Safety instructions 2-3 2.1.2. Assembly To prevent injury and/or damage to equipment, observe the following safety rules: • Compare the connected loads with those of the main supply. • Use care when using lifting gear, and observe any pertaining regulations. • Do not modify, add other equipment or change the design of the equipment with ...

  • Sterling SSE-2 - page 15

    SSE 2 2-4 Safety instructions 2.1.3. Operation To prevent injury and/or damage to equipment, observe the following safety rules: • Appoint an equipment foreman to be responsible for the equipment. • Ensure that the operating personnel are provided detailed instruction in the operation of the equipment. • When the main switch is switched off f ...

  • Sterling SSE-2 - page 16

    SSE 2 Safety instructions 2-5 2.2. For the operating safety of the equipment Never change settings if the consequences are not precisely known. Use only original Sterling spare parts. Please observe the maintenance schedule. Keep record of all maintenance and repair work. Please note that electronic components may be damaged by static discharge. Ch ...

  • Sterling SSE-2 - page 17

    ...

  • Sterling SSE-2 - page 18

    SSE 2 Transport, Assembly and Storage 3-1 3. T ransport, Assembly and Storage M This chapter is intended for all operating personnel of the equipment. Personnel using these instructions must be instructed in the regulations for the prevention of accidents, the operating conditions and safety regulations and their implementation. Ensure in each case ...

  • Sterling SSE-2 - page 19

    SSE 2 3-2 Transport, Assembly and Storage 3.1. Transport and Packing M Please ensure adequate carrying capacity of the lifting equipment. The equipment passes rigorous testing in the factory and is packed carefully to avoid transport damage. Please check packing on delivery for transport damage. The inlet and discharge flanges are sealed with plugs ...

  • Sterling SSE-2 - page 20

    SSE 2 Assembly instructions 4-1 4. Assembly instructions M These installation instructions are intended for persons with skills in electrical and mechanical areas due to their training, experience and received instructions. Personnel using these installation instructions must be instructed in the regulations for the prevention of accidents, the ope ...

  • Sterling SSE-2 - page 21

    SSE 2 4-2 Assembly instructions 4.1. Unpacking The loader is insensitive to shocks and can be mounted directly onto the processing machine, on a machine hopper, a drying hopper or a dosing and blending unit. The equipment is delivered as a complete assembly. Use the following procedure to prepare the machine for assembly: 1. Unpack the equipment. 2 ...

  • Sterling SSE-2 - page 22

    SSE 2 Assembly instructions 4-3 4.2. Installing the Dump Valve Sensor The controller uses a dump valve sensor (A) with a magnet (B) to determine demand. When the dump valve is closed, indicating demand, the magnet is pushed towards the sensor. The presence of the magnet near the sensor indicates demand and triggers a new conveying cycle. When the d ...

  • Sterling SSE-2 - page 23

    SSE 2 4-4 Assembly instructions 4.3. Attaching the Pickup Wand Use the following procedure to attach the pickup wand: 1. The pickup wand must be connected to flexible hose to allow sufficient movement. The length of the hose should not exceed 10 feet (3 meters). Push the free pipe end approximately 1.5” to 2” (4-5 cm) into the hose. Use a hose ...

  • Sterling SSE-2 - page 24

    SSE 2 Assembly instructions 4-5 4.4. Mounting Please check during assembly that the admissible bearing loads are not exceeded. Mount the loader in such a way that the outlet flap swings in a right angle to the direction of machine movement. Please check that all connecting points are tight to ensure that the conveying performance is not impaired. F ...

  • Sterling SSE-2 - page 25

    SSE 2 4-6 Assembly instructions 4.4.1. Mounting on the processing machine A material hopper VT 1.0 is required: 1. Mount the material hopper onto the flange of the processing machine. 2. Mount the unit onto the material hopper. F Observe the bearing capacity of the machine flange. 4.4.2. Mounting onto a machine hop p er A welding flange EF 190 is r ...

  • Sterling SSE-2 - page 26

    SSE 2 Assembly instructions 4-7 4.4.3. Mounting onto mixing hoppers with lateral inlet A material hopper VT 1.0 is required: 1. Mount the material hopper onto the swan-neck of the mixing hopper. 2. Mount the unit onto the intermediate hopper. F Observe the bearing capacity of the machine flange. 4.4.4. Mounting onto dosing station DT 30 A dosing ho ...

  • Sterling SSE-2 - page 27

    SSE 2 4-8 Assembly instructions 4.5. Electrical connection M The regulations of the local Electricity Board must be observed. Before connection to the electricity supply, ensure that the supply voltage and the power frequency are in accordance with the data on the nameplate of the machine. The electrical connection may only be carried out by Sterli ...

  • Sterling SSE-2 - page 28

    SSE 2 Assembly instructions 4-9 4.6. Installation of the optional SKW proportioning valve & Before proceeding, review the connecting diagram included with the unit. For more information, refer to the manual that shipped with the SKW valve. Connecting the SKW-E proportioning valve: Control and power of the proportioning valve is supplied through ...

  • Sterling SSE-2 - page 29

    SSE 2 4-10 Assembly instructions Connecting Material Lines: Component 1 – connected to the intake port furthest from the air cylinder (regrind) Component 2 – connected to the intake port closest to the air cylinder (virgin) Setting the ratio: When the loader motor is not running, pressing the arrow key on the valve’s controller will change th ...

  • Sterling SSE-2 - page 30

    SSE 2 Functional Description 5-1 5. Functional Description M This functional description is intended for all operating personnel of the equipment. General knowledge of conveying systems is required to operate the equipment Ensure in each case that the operating personnel are sufficiently knowledgeable about the equipment. ...

  • Sterling SSE-2 - page 31

    SSE 2 5-2 Functional Description 5.1. Sequence of Operation The sequence of operation is as follows: 1. Plug in the machine and move the on/off switch to the “on” position 2. All LEDs on the controller will blink, and the software version is displayed on the screen. 3. A 2-second blowback pulse will clean the filter. During blowback, the screen ...

  • Sterling SSE-2 - page 32

    SSE 2 Operation 6-1 6. Operation M This chapter is intended for operating personnel. General knowledge of the operation of conveying systems is required to perform these tasks. Make sure you have read and understood the Functional Description chapter in this manual before operating the equipment. Ensure that all operating personnel are sufficiently ...

  • Sterling SSE-2 - page 33

    SSE 2 6-2 Operation 6.1. Switching on the unit Locate the power switch on the left side of the control box and switch it to the “on” position. 6.2. Checking the Flexible Hose Before operating the equipment, check to make sure the suction is working: 1. Remove pickup wand from the flexible hose. 2. Cover the open end of the hose with your hand. ...

  • Sterling SSE-2 - page 34

    SSE 2 Operation 6-3 6.3. Setting the Conveying Time F Do not overfill the hopper loader & The conveying time cannot be set while the unit is in the process of conveying material. By correctly setting the conveying time, you can reduce vacuum motor wear, save energy, and reduce your need to maintain filters: 1. Turn on the hopper loader 2. Obser ...

  • Sterling SSE-2 - page 35

    SSE 2 6-4 Operation 6.4. Setting the Purge Time (optional) To set the purge time, press and hold the “change-over” key while using the “arrow key” to adjust the time. & The purge time that was last selected appears in the display. The purge time can be set at 1 to 99 seconds. F If no line clearing valve has been installed, enter “0&qu ...

  • Sterling SSE-2 - page 36

    SSE 2 Operation 6-5 6.5. Initial Operation Metal shavings may be inside the pipe from cutting down pipes into lengths. These are pulled during the first conveying process and collected in the separator. F This material should not be used again. 6.6. Switching off the unit Locate the power switch on the left side of the control box and switch it to ...

  • Sterling SSE-2 - page 37

    ...

  • Sterling SSE-2 - page 38

    SSE 2 Troubleshooting 7-1 7. T roubleshooting M This chapter is intended for the operating personnel of the equipment. General knowledge of the operation of conveying systems is required to perform these tasks. Make sure you have read and understood the “Start-up” section of this manual before proceeding. Ensure that the operating personnel are ...

  • Sterling SSE-2 - page 39

    SSE 2 7-2 Troubleshooting 7.1. Alarms An alarm will be triggered if there is no material to convey or if the loader overheats. & An “E” appears in the display and an error number. And alarm will sound. F Do not restart operation until the malfunction has been corrected. The following error messages can be displayed: “E1" The alarm me ...

  • Sterling SSE-2 - page 40

    SSE 2 Maintenance 8-1 8. Maintenance M This chapter is intended for persons with skills in electrical and mechanical areas due to their training, experience and received instructions. Personnel using the instructions in this chapter must be instructed of the regulations for the prevention of accidents, the operating conditions and safety regulation ...

  • Sterling SSE-2 - page 41

    SSE 2 8-2 Maintenance F Please observe the maintenance intervals. Before starting maintenance work, clean the equipment of oil, fuel or lubricants. Ensure that materials and incidentals required for operation as well as spare parts are disposed of properly and in an environmentally sound manner. Use only original Sterling spare parts. Keep record o ...

  • Sterling SSE-2 - page 42

    SSE 2 Maintenance 8-3 8.1. Maintenance intervals Daily: Check that warning labels on the equipment are clear and readable Clean the sieve or filter Use compressed air to blow through the sieve or filter (according to the accumulation of dust) Monthly: Check function of the power cord and plug Every 6 months: Check all electrical and mechanical conn ...

  • Sterling SSE-2 - page 43

    SSE 2 8-4 Maintenance 8.2. Servicing the Loader M Disconnect the unit from main power supply by unplugging it. Depressurize all system sections of the equipment (only units with active cleaning). 8.2.1. Changing the sealing ring of the outlet flap 1. Open the toggle-type fasteners (A) and the flap (B) of the hopper loader. 2. Draw the old sealing r ...

  • Sterling SSE-2 - page 44

    SSE 2 Maintenance 8-5 8.2.2. Adjusting the dump valve sensor 1. Stop the conveying cycle by disconnecting the dump valve sensor from the controller. With the dump valve sensor disabled, no demand will be indicated, and conveying will stop. 2. Connect an ohmmeter to PINS 2 and 3 of the dump valve sensor. 3. Release the nuts (A) of the dump valve sen ...

  • Sterling SSE-2 - page 45

    SSE 2 8-6 Maintenance 8.2.3. Cleaning the unit 1. Open the tension ring. 2. Tilt the turbine head upwards. 3. Remove the filter. 4. Clean the filter by means of compressed-air. 5. Clean the hopper loader by means of a vacuum cleaner. 6. Mount the filter. Pay attention for proper fit. 7. Mount the turbine head. 8. Mount the tension ring. & Order ...

  • Sterling SSE-2 - page 46

    SSE 2 Maintenance 8-7 Cleaning the filter cloth: 1. Open the toggle-type fasteners (A) and the flap (B) of the hopper loader. 2. Check the filter cloth (C) and the wire cloth (D) for material residue. Clean the filter by means of compressed air. 3. Close the flap (B) and the toggle- type fasteners (A) on the flap of the hopper loader. & Order n ...

  • Sterling SSE-2 - page 47

    SSE 2 8-8 Maintenance 8.2.4. Replacing carbon brushes at the motor M This work must be carried out by qualified personnel only. Disconnect the unit from main power supply before working on the controller. Remove compressed air and depressurize unit prior to disassembly. Disassemble the unit: 1. Remove the screws (A) at the lid. 2. Remove the lid (B ...

  • Sterling SSE-2 - page 48

    SSE 2 Maintenance 8-9 F Verify that no cables are pinched or cut. Carbon brushes can be replaced twice. After that the turbine has to be completely replaced. & Order numbers Turbine (230 V, 800 W): ID 85629 Carbon brushes (switching off): ID 85628 Turbine (110 V, 800 W): ID 85844 Carbon brushes (switching off): ID 84716 ...

  • Sterling SSE-2 - page 49

    ...

  • Sterling SSE-2 - page 50

    SSE 2 Technical data 9-1 9. T echnical data M These instructions apply to all persons within the range of action of the equipment. These operating instructions are to be used by all persons assigned activities connected with the equipment. ...

  • Sterling SSE-2 - page 51

    SSE 2 9-2 Technical data Integrated control with: - LED-display - indication of the respective modes of operation - adjustable conveying time - adjustable line clearing time Integrated vacuum pump Integrated filter with automatic cleaning Parts coming in contact with material are made of stainless steel Simple mounting to dosing and blending units ...

  • Sterling SSE-2 - page 52

    SSE 2 Technical data 9-3 Dimension Sheet ...

  • Sterling SSE-2 - page 53

    ...

  • Sterling SSE-2 - page 54

    SSE 2 Spare parts list 10-1 10. Spare parts list M This spare parts list is intended to be used only by trained personnel. Other persons are not permitted to modify or repair the equipment. & Wear Code: A = Wearing part, wears quickly B = Wearing part C = Spare part, reorder every year D = Spare part, reorder every 2 years E = Spare part, rarel ...

  • Sterling SSE-2 - page 55

    SSE 2 10-2 Spare parts list SSE-2, 230 V, 50 Hz / 110 V, 60 Hz ...

  • Sterling SSE-2 - page 56

    SSE 2 Spare parts list 10-3 10.1. SSE-2, 230 V, 50 Hz Pos. Order no. Designation Wear Code 1 37767 Turbine head complete, with turbine and controller 2 37765 Covering cap 3 18491 Sieve 4 34197 Isolation 5 37768 Support 6 85629 Turbine (800 W) D 85628 Carbon brushes (switching off) B 7 24679 Isolation 8 26384 Filter round 9 37764 Turbine lower part ...

  • Sterling SSE-2 - page 57

    SSE 2 10-4 Spare parts list 10.2. SSE-2, 110 V, 60 Hz Pos. Order no. Designation Wear Code 1 37777 Turbine head complete, with turbine and controller 2 37765 Covering cap 3 18491 Sieve 4 34197 Isolation 5 37768 Support 6 85844 Turbine (800 W) D 84716 Carbon brushes (switching off) B 7 24679 Isolation 8 26384 Filter round 9 37764 Turbine lower part ...

  • Sterling SSE-2 - page 58

    SSE 2 Spare parts list 10-5 10.3. SSE-2, 230 V, 50 Hz with active cleaning Pos. Order no. Designation Wear Code 1 37755 Filter with sealing A 2 37222 Basket 3 82593 Solenoid valve B 4 97745 Bush D 5 37800 Breather tube D 10.4. SSE-2, 110 V, 60 Hz with active cleaning Pos. Order no. Designation Wear Code 1 37755 Filter with sealing A 2 37222 Basket ...

  • Sterling SSE-2 - page 59

    ...

  • Sterling SSE-2 - page 60

    SSE 2 Accessories 11-1 11. Accessories _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ...

  • Sterling SSE-2 - page 61

    ...

  • Sterling SSE-2 - page 62

    SSE 2 Electrical manual 12-1 12. Electrical manual This electrical manual is intended to be used only by Sterling service personnel and trained personnel authorized by Sterling. Other persons are not permitted to modify or repair the equipment. ...

  • Sterling SSE-2 - page 63

    ...

  • Sterling SSE-2 - page 64

    ...

  • Sterling SSE-2 - page 65

    ...

  • Sterling SSE-2 - page 66

    ...

  • Sterling SSE-2 - page 67

    ...

  • Sterling SSE-2 - page 68

    ...

  • Sterling SSE-2 - page 69

    ...

  • Sterling SSE-2 - page 70

    ...

  • Sterling SSE-2 - page 71

    ...

  • Sterling SSE-2 - page 72

    SSE-2 Quick Start Guide 1-1 1. Quick Start Guide Turning on the loader: • Locate the power switch on the left side of the control box and move to the ‘ON’ position. Setting the loader convey time: • It is only possible to set the convey time when the unit is not conveying material 1. Disconnect the flapper valve switch from the control box, ...

Manufacturer Sterling Category Food Processor

Documents that we receive from a manufacturer of a Sterling SSE-2 can be divided into several groups. They are, among others:
- Sterling technical drawings
- SSE-2 manuals
- Sterling product data sheets
- information booklets
- or energy labels Sterling SSE-2
All of them are important, but the most important information from the point of view of use of the device are in the user manual Sterling SSE-2.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Sterling SSE-2, service manual, brief instructions and user manuals Sterling SSE-2. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Sterling SSE-2.

Similar manuals

A complete manual for the device Sterling SSE-2, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Sterling SSE-2 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Sterling SSE-2.

A complete Sterling manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Sterling SSE-2 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Sterling SSE-2, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Sterling SSE-2, that we can find in the current document
3. Tips how to use the basic functions of the device Sterling SSE-2 - which should help us in our first steps of using Sterling SSE-2
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Sterling SSE-2
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Sterling SSE-2 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Sterling SSE-2?

Use the form below

If you did not solve your problem by using a manual Sterling SSE-2, ask a question using the form below. If a user had a similar problem with Sterling SSE-2 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)