Manual Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller

48 pages 1.12 mb
Download

Go to site of 48

Summary
  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 1

    HEA T TRANSFER PRODUCTS, INC. 120 BRALEY RD ., E . FREET OWN , MA 02717 Installing , Operating & Maintaining MUNCHKIN ™ HIGH EFFICIENCY HEA TER with the “925” Controller Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. WHA T T O DO IF Y OU SMELL GAS • Do not try to light ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 2

    USING THIS MANUAL 2 SPECIAL A TTENTION BO XES Throughout this manual you will see these special attention box es similar to this one, which are intended to supplement the instructions and mak e special notice of potential hazards. These categories mean, in the judgement of Heat T ransfer Products, Inc.: NOTICE Heat T ransfer Products manufactures b ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 3

    T ABLE OF CONTENTS 3 T ABLE OF CONTENTS P ART 1 . . . . . . . . . . . . . . . . . . . . . .4 thru 8 GENERAL INFORMA TION A How It Operates . . . . . . . . . . . . . . . . . .4 B Munchkin Ratings and Dimensions . . .4 C Pre-installation Requirements . . . . . . .8 D Pressure Relief V alve . . . . . . . . . . . . . .9 P ART 2 . . . . . . . . . . . . ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 4

    GENERAL INFORMA TION 4 B. MUNCHKIN RA TINGS AND DIMENSIONS PERFORMANCE RA TINGS *Net water CONNECTION SIZES l e d o Mn o i t a l u d o M t u p n Ig n i t a e H E O DE U F At h g i e W g n i p p i h SR B I * M 0 5 T0 0 0 , 0 5 o t 0 0 0 , 8 10 0 0 , 6 4 o t 0 0 0 , 6 1% 2 9. s b l 8 50 0 0 , 0 4 M 0 8 T0 0 0 , 0 8 o t 0 0 0 , 9 10 0 0 , 4 7 o t 0 0 ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 5

    GENERAL INFORMA TION 5 Figure 1-1 (NOTE: The Munchkin is rated at zero clearance to combustibles.) 80M/140M/199M T50M/T80M RECOMMENDED SERVICE CLEARANCES Figure 1-2 ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 6

    GENERAL INFORMA TION 6 Figure 1-3 T50M/T80M DIMENSIONS ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 7

    GENERAL INFORMA TION 7 DIMENSIONS 80M 140M/199M Figure 1-4 Figure 1-5 ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 8

    GENERAL INFORMA TION 8 C. PRE-INST ALLA TION REQUIREMENT GENERAL 1. Munchkin Boilers are supplied complete- ly assembled as packaged boilers. The package should be inspected for damage upon receipt and any damage to the unit should be reported to the shipping com- pany and wholesaler . This boiler should be stored in a clean, dry area. 2. Carefully ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 9

    GENERAL INFORMA TION / ELECTRICAL 9 Note: Service clearance of the Munchkin: See Section 1, Figures 1-1 and 1-2. If the Munchkin is set up for liquefied petroleum (LP) gas, some geographic areas follow the Uniform Mechanical Code, section 304.6, “Liquefied petroleum gas burning appliances shall not be installed in a pit, basement or similar locat ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 10

    10 ELECTRICAL The electrical requirements are for standard 120 volts, 60 Hz 15 Amp service. This unit is wired with #18 awg and fused for no more than 15 Amps. There are two ground points in the electrical compartment that must be connected to the building ground system. Connect the building ground to the green ground screw and the green ground wir ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 11

    11 ELECTRICAL NORMALLY OPEN T T GROUND BUS SWITCH JUNCTION BOX 120V 60 HZ ELECTRICAL SWITCH JUNCTION BOX 120V 60 HZ ELECTRICAL NORMALLY OPEN THERMOSTAT CONNECTION WIRING DIAGRAM WITHOUT CONNECTION TO CIRCULATOR GREEN (GROUND) GRAY GRAY CONNECTION THERMOSTAT (NEUTRAL) WHITE BLACK (HOT) GRAY T T GRAY WIRING DIAGRAM CONNECTING TO CIRCULATOR BLACK WHIT ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 12

    12 GAS CONNECTION P ART 3. GAS CONNECTION A. GAS CONNECTION The gas supply shall have a maximum inlet pressure of less than 14" water column (350 mm), ½ pound pressure (3.5 kP a), and a minimum of 3.5" water column. The entire piping system, gas meter and regulator must be sized properly to prevent pressure drop greater than 0.5" as ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 13

    13 W ARNING F ailure to follow all precautions could result in fire, explosion or death! GAS CONNECTION It is recommended that a soapy solution be used to detect leaks. Bubbles will appear on the pipe to indicate a leak is present. The gas piping must be sized for the proper flow and length of pipe, to avoid pressure drop. Both the gas meter and th ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 14

    14 VENTING P ART 4. VENTING A. APPRO VED VENTING MA TERIALS Exhaust V ent and Extensions in Plastic 2", 3" and 4" Pipe Schedule 40 or 80. 1. Non F oam Core PVC Pipe 2. Non F oam Core CPVC Pipe 3. Non F oam Core ABS Pipe V ent Piping must conform to following 1. PVC Non F oam Core Pipe (P olyvinyl Chloride) to ASTM D -1785 or D -1784 ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 15

    15 VENTING B. VENTING THE MUNCHKIN The inlet pipe on the back of the cabinet should be 3" PVC schedule 40. It is very important that you plan the location properly to eliminate long pipe runs and excessive fittings. Inlet pipe size must not be reduced. Do not combine the inlet air with any other inlet pipe including an inlet to an additional s ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 16

    16 may require venting modifications (consult factory). The air inlet must be a minimum of 1' vertically above the maximum snow level. It is very important that there are no other vents, chimneys or air inlets in any direction for at least 4'. All venting must be properly supported. The Munchkin is not intended to support any venting what ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 17

    17 VENTING Friction Loss Equivalent in P iping and Fittings Fittings or P iping Equivalent Feet 90 degree elbow = 5 45 degree elbow = 3 Coupling = 0 air inlet tee = 0 Plastic Pipe = 1 concentric vent kit = 3 V500 or V1000 vent kit = 0 Example: Installation requires the following material for both inlet and exhaust piping for the Munchkin Required: ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 18

    VENTING 18 D . HEA TER REMOV AL FROM A COMMON VENT SYSTEM At the time of removal of an existing heater , the following steps shall be followed with each appli- ance remaining connected to the common venting system placed in operation, while the other appli- ances remaining connected to common venting system are not operating. 1. Seal any unused ope ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 19

    19 VENTING **IMPORT ANT NO TE : All vent pipes must be glued, properly supported and the exhaust must be pitched a minimum of a ¼" per foot back to the heater (to allow drainage of condensate). Figure 4- 1 **IMPORT ANT NO TE : All vent pipes must be glued, prop- erly supported and the exhaust must be pitched a mini- mum of a ¼" per foot ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 20

    VENTING 20 **IMPORT ANT NO TE : All vent pipes must be glued, properly supported and the exhaust must be pitched a minimum of a ¼" per foot back to the heater (to allow drainage of condensate). Figure 4- 3 **IMPORT ANT NO TE : All vent pipes must be glued, properly supported and the exhaust must be pitched a minimum of a ¼" per foot bac ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 21

    VENTING 21 **IMPORT ANT NO TE : All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of a ¼" per foot back to the heater (to allow drainage of condensate). Figure 4-5 **IMPORT ANT NO TE : All vent pipes must be glued, properly supported, and the exhaust must be pitched a minimum of a ¼" per foot ba ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 22

    22 PIPING P ART 5. PIPING A. HYDRONIC PIPING WITH CIRCULA TORS OR ZONE V AL VES The Munchkin is designed to function in a closed loop 15 PSI System. T o assure you that you have adequate pressure in the system, we have installed in the outlet manifold, a pressure switch that will not let the Munchkin operate without a minimum of 10 PSI water pressu ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 23

    23 PIPING 8. Install an Air Elimination Device on the system supply . 9. Install a drain valve at the lowest point of the system. Note: The Munchkin can not be drained completely of water without purging the unit with an air pressure 15 PSI. 10. The Safety Relief V alve is installed at the factory located on the right hand side of Munchkin. Pipe th ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 24

    24 PIPING C. FILL AND PURGE HEA TING SYSTEM • Attach the hose to balance and purge hose connector or drain valve and run hose to near- est drain • Close the other side of the balance and purge valve or the shut off valve after the drain. • Open first zone balance and purge or drain valve to let water flow out the hose. If zone valves are used ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 25

    25 PIPING Piping Symbol Legend circulator (w/ isolation flanges) gate valve globe valve ball valve swing-check valve flow-check valve spring-loaded check valve hose bib / boiler drain thermostatic radiator valve TRV (straight) circuit setter manual 3-way valve zone valve air separator backflow preventer diaphragm-type expansion tank pressure reduci ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 26

    26 PIPING Standard Munchkin boiler Retrofit piping (zoning with valves) Space heating mode Munchkin boiler P1 Super Stor indirect DHW tank T/P Drawing 1A make-up water zone valves purging valves NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. 2. ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 27

    27 PIPING Standard Munchkin boiler Retrofit piping (zoning with valves) Domestic water heating mode Munchkin boiler P1 Super Stor indirect DHW tank T/P Drawing 1B make-up water purging valves V1 zone valves flow bypass valve anti-scald mixing valve NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 28

    28 PIPING Standard Munchkin boiler Preferred piping (zoning with valves) Space heating mode Munchkin boiler P1 Super Stor indirect DHW tank T/P Drawing 2A make-up water zone valves NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. 2. Adjust differe ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 29

    29 PIPING Standard Munchkin boiler Preferred piping (zoning with valves) Domestic water heating mode Munchkin boiler P1 Super Stor indirect DHW tank T/P Drawing 2B make-up water V1 zone valves anti-scald mixing valve purging valves closely spaced tees differential pressure bypass valve P2 NOTES: 1. This drawing is meant to show system piping concep ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 30

    30 PIPING Standard Munchkin boiler Preferred piping (zoning with circulators) Space heating mode NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. 2. All closely spaced tees shall be within 4 pipe diameter center to center spacing. 3. A minimum of ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 31

    31 PIPING Standard Munchkin boiler Preferred piping (zoning with circulators) Domestic water heating mode Munchkin boiler make-up water Super Stor indirect DHW tank closely spaced tees P2 zone circulators T/P space heating zone circuit Drawing 2D purging valves NOTES: 1. This drawing is meant to show system piping concept only. Installer is respons ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 32

    32 PIPING Standard Munchkin boiler Preferred piping (multiple boilers / zoning with circulators) Space heating mode NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. 2. All closely spaced tees shall be within 4 pipe diameter center to center spacin ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 33

    PIPING 33 Standard Munchkin boiler Preferred piping (multiple boilers / zoning with circulators) Domestic water heating mode NOTES: 1. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. 2. All closely spaced tees shall be within 4 pipe diameter center to cent ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 34

    34 ST ART -UP PROCEDURES P ART 6. ST ART -UP PROCEDURES A. SEQUENCE OF OPERA TION 1. When power is first applied to the control, the control display will read the outlet tempera- ture. The control will initially run through a self-diagnostic routine and then go into its oper- ating mode. If there is no call for heat, the System will go into an idle ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 35

    35 ST ART -UP PROCEDURES the room thermostat is connected and turn the room thermostat up above room temperature to start the combustion blower fan to run the Munchkin. The Munchkin will now run its pre- purge cycle, then begin running, which will be indicated by the Green light illuminating under “Flame On ” in your display . C. LIGHTING INSTR ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 36

    36 12. If the appliance will not operate, follow the instructions “T o T urn Off Gas T o Appliance” Section E and call your service technician or gas supplier . E. ADJUSTING THE TEMPERA TURE ON THE MUNCHKIN DISPLA Y : 1. Before you can change the temperature from the factory setting of 180 degrees. Y ou must make sure that none of the thermosta ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 37

    37 G . TEST MODE This function is intended to simplify the gas valve adjustment if needed. Listed below are the recommended limits on each Munchkin Heater and the Combustion Settings. Automatic modulation does not take place when the controller is in T est mode, only temperature limitation based on the Munchkin Central Heating set point. The user w ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 38

    38 C A UTION This appliance has wire function labels on all internal wiring. Observe the position of each wire before removing it. Wiring errors may cause improper and dangerous operation. V erify proper operation after servicing. C A UTION If overheating occurs or the gas supply fails to shut off, do not turn off electrical power to the circulatin ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 39

    TROUBLESHOOTING 39 T able 7-1: 925 Control Board Error Codes e d o Cn o i t p i r c s e Dy d e m e R 0 0 F . d e d e e c x E t i m i L h g i H . 1 . 2 . 3 n o i t a r e p o p m u p n o i t a l u c r i c k c e h C e h t g n i s s e c c a y b r e l i o b e h t h g u o r h t w o l f e t a u q e d a s i e r e h t t a h t e r u s s A e h t m o r f e s i ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 40

    TROUBLESHOOTING 40 Boiler & Indirect Temperature (˚F) Resistance (ohms) 32 32550 41 25340 50 19870 59 15700 68 12490 77 10000 86 8059 95 6535 104 5330 113 4372 122 3605 131 2989 140 2490 149 2084 158 1753 167 1481 176 1256 185 1070 194 915 203 786 212 667 RESISTANCE TABLES ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 41

    41 MAINTENANCE P ART 8. MAINTENANCE A. MAINTENANCE PROCEDURES P eriodic maintenance should be performed once a year by a qualified service technician to assure that all the equipment is in safe efficient operation. The owner can make necessary arrangements with a qualified heating contractor for periodic maintenance of the heater . Installer must a ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 42

    42 MAINTENANCE D . COMBUSTION CHAMBER COIL CLEANING INSTRUCTIONS* *Before beginning this procedure, you must have on hand the following items: – a nylon, stainless or brass brush (not steel) – “Rydlyme” (recommended for best results) (available on line www .rydlyme.com) or “CLR” (available at most hardware stores) 1. Shut down the Munch ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 43

    MAINTENANCE 43 CONTROL WIRING LA Y OUT Fig . 8-1 * There is a spare 6.3 amp “slow blow ” fuse included on the control cover . HTP p/n 7250-378 or you may purchase it from Radio Shack p/n: 270-1068 Caution: Do not replace with any amperage other than 6.3A E. MUNCHKIN CONTROLLER ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 44

    MAINTENANCE 44 ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 45

    MAINTENANCE 45 ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 46

    NOTES 46 ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 47

    NOTES 47 ...

  • Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - page 48

    SuperStor Ultra, SuperStor , V oyager , V oyager Sanitizer , and Everlast are registered trademarks of Heat T ransfer Products, Inc. Munchkin R1 © 2004 Heat T ransfer P roducts, Inc. LP -61 REV . 1/17/05 ...

Manufacturer Munchkin Category Boiler

Documents that we receive from a manufacturer of a Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller can be divided into several groups. They are, among others:
- Munchkin technical drawings
- MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller manuals
- Munchkin product data sheets
- information booklets
- or energy labels Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller
All of them are important, but the most important information from the point of view of use of the device are in the user manual Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller, service manual, brief instructions and user manuals Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller.

A complete manual for the device Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller.

A complete Munchkin manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller, that we can find in the current document
3. Tips how to use the basic functions of the device Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller - which should help us in our first steps of using Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller?

Use the form below

If you did not solve your problem by using a manual Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller, ask a question using the form below. If a user had a similar problem with Munchkin MUNCHKIN HIGH EFFICIENCY HEATER with the "925" Controller it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)