Manual Allied Air Enterprises 4)PCE(13

13 pages 0.55 mb
Download

Go to site of 13

Summary
  • Allied Air Enterprises 4)PCE(13 - page 1

    506252-01 Page 1 of 13 Issue 0902 Save these instructions for future reference INST ALLA TION AND MAINTENANCE INSTRUCTIONS (2,4)PCE(13,15) SERIES Electric Cooling Package Unit If this unit is to be installed in a mobile or manufactured home application, the ductwork must be sized to achieve static pressures within the manufacturer ’ s guidelines. ...

  • Allied Air Enterprises 4)PCE(13 - page 2

    Page 2 of 13 506252-01 Issue 0902 INST ALLA TION These instructions, and any instructions p ackaged with mating components and/or accessories, should be carefully read prior to beginning installation. Note p articularly any CAUTIONS or W ARNINGS in these instructions and all labels on the units . These instructions are intended as a general guide o ...

  • Allied Air Enterprises 4)PCE(13 - page 3

    506252-01 Page 3 of 13 Issue 0902 dimension across the unit must be used across the top of the unit. Recommended spreader length: 3 ton and smaller package unit s – 44", 3.5 ton and larger units – 54". Units may also be moved or lifted with a forklif t while still in the factory-supplied packaging. The lengths of the forks of the fork ...

  • Allied Air Enterprises 4)PCE(13 - page 4

    Page 4 of 13 506252-01 Issue 0902 not be sized by matching the dimensions of the duct connections on the unit. Out door ductwork must be insulated and waterproofed. Equipment is shipped for side ductwork connection. The unit can be converted to bottom ductwork connection by removing the duct covers located over the bottom duct openings and placing ...

  • Allied Air Enterprises 4)PCE(13 - page 5

    506252-01 Page 5 of 13 Issue 0902 Power supply to the unit must comply with all applicable codes and the National Electical Code (NEC) or Canadian Electrical Code (CEC). A fused disconnect switch should be field provided for the unit. The switch must be sep arate from all other circuits. If any of the wire supplied with the unit must be replaced, r ...

  • Allied Air Enterprises 4)PCE(13 - page 6

    Page 6 of 13 506252-01 Issue 0902 Compressor Units are shipped with compressor mountings factory- adjusted and ready for operation. Caution: Do not loosen compressor mounting bolts. Heater Kit Accessory (if used) The unit is fully equipped for cooling operation without auxiliary heat. A heater kit accessory may also be used. T o install the heater ...

  • Allied Air Enterprises 4)PCE(13 - page 7

    506252-01 Page 7 of 13 Issue 0902 OPERA TION Sequence of Operation Cooling Upon cooling demand, the thermostat closes circuit R and Y . Closing R and Y closes the unit contactor , starting the compressor and outdoor fan. The thermost at automatically closes R to G circuit which also brings on the indoor blower at the same time. Upon satisfying cool ...

  • Allied Air Enterprises 4)PCE(13 - page 8

    Page 8 of 13 506252-01 Issue 0902 Cooling System Performance For maximum performance of the cooling system, operating temperatures and pressure should be checked. Superheat should be determined at S tandard ARI test conditions of 82°F outdoor and 80°F indoor dry bulb/67°F wet bulb. If superheat measured deviates from values found in T able 4, re ...

  • Allied Air Enterprises 4)PCE(13 - page 9

    506252-01 Page 9 of 13 Issue 0902 Owner Record Model # _________________________________ Serial # _________________________________ Installation Date ___________________________ Installed by: Dealer __________________________________ Address _________________________________ T elephone # ______________________________ License # ____________________ ...

  • Allied Air Enterprises 4)PCE(13 - page 10

    Page 10 of 13 506252-01 Issue 0902 Figure 8 Connection Diagram Single Phase – PSC Motor P/N 48396-001 Unit F actor y Shipped S ettin gs C ooling Input (B L K ) 24 LOW 30 MED 36 HIGH 42 LOW 48 MED 60 HIGH BLOWER SPEED CHART 208/230V -1-60 G W1 C R BLK RED YEL RED CONT ACT OR THERMOST A T L1 T1 T2 L2 C H F CONDENSER F AN MOT OR COMPRESSOR CONT ACT ...

  • Allied Air Enterprises 4)PCE(13 - page 11

    506252-01 Page 11 of 13 Issue 0902 Figure 9 Connection Diagram Single Phase – V ariable S peed Motor P/N 48397-001 CONDENSER F AN MOT OR DIAGNOSTIC MODULE Unit F actor y Shipped Sett ings AD J US T HEA T C OOL 24 NORM B B 30 NORM A A 36 NORM A A 42 NORM C C 48 NORM B B 60 NORM A A BLOWER SPEED CHART NO TE - If any of the original wire is replaced ...

  • Allied Air Enterprises 4)PCE(13 - page 12

    Page 12 of 13 506252-01 Issue 0902 ALLIED AIR ENTERPRISES EQUIPMENT LIMITED W ARRANTY APPLIES IN U.S.A. AND CANADA ONL Y F AILURE TO MAINT AIN YOUR EQUIPMENT WILL VOID THIS W ARRANTY COVERED EQUIPMENT The following Allied Air Enterprises heating and cooling equipment is covered by the Limited W arranty , Condensing Unit s: 2SCU13, 4SCU13, 4SCU14, 4 ...

  • Allied Air Enterprises 4)PCE(13 - page 13

    506252-01 Page 13 of 13 Issue 0902 Allied Air Enterprises Inc. (“Allied Air”) provides its air conditioning and heating product s with a S tandard Limited Parts Wa rranty for five (5) years. This additional 5-Y ear Limited Extended Parts Warranty is in addition to and is intended to supplement Allied Air ’ s S tandard Limited Parts Warranty . ...

Manufacturer Allied Air Enterprises Category Refrigerator

Documents that we receive from a manufacturer of a Allied Air Enterprises 4)PCE(13 can be divided into several groups. They are, among others:
- Allied Air Enterprises technical drawings
- 4)PCE(13 manuals
- Allied Air Enterprises product data sheets
- information booklets
- or energy labels Allied Air Enterprises 4)PCE(13
All of them are important, but the most important information from the point of view of use of the device are in the user manual Allied Air Enterprises 4)PCE(13.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Allied Air Enterprises 4)PCE(13, service manual, brief instructions and user manuals Allied Air Enterprises 4)PCE(13. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Allied Air Enterprises 4)PCE(13.

A complete manual for the device Allied Air Enterprises 4)PCE(13, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Allied Air Enterprises 4)PCE(13 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Allied Air Enterprises 4)PCE(13.

A complete Allied Air Enterprises manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Allied Air Enterprises 4)PCE(13 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Allied Air Enterprises 4)PCE(13, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Allied Air Enterprises 4)PCE(13, that we can find in the current document
3. Tips how to use the basic functions of the device Allied Air Enterprises 4)PCE(13 - which should help us in our first steps of using Allied Air Enterprises 4)PCE(13
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Allied Air Enterprises 4)PCE(13
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Allied Air Enterprises 4)PCE(13 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Allied Air Enterprises 4)PCE(13?

Use the form below

If you did not solve your problem by using a manual Allied Air Enterprises 4)PCE(13, ask a question using the form below. If a user had a similar problem with Allied Air Enterprises 4)PCE(13 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)