Manual Trane Building Automation System

88 pages 1.51 mb
Download

Go to site of 88

Summary
  • Trane Building Automation System - page 1

    ® BMTK-S VN0 1D-EN Har dw ar e Installation T r ac k er ™ Ve r s i o n 1 2 Building A ut omation S yst em ...

  • Trane Building Automation System - page 2

    ...

  • Trane Building Automation System - page 3

    Har dw ar e Installation T r ac k er ™ V ersion 12 Building A ut omation S yst em BMTK-S VN0 1D-EN Febr uary 2004 ® ...

  • Trane Building Automation System - page 4

    ...

  • Trane Building Automation System - page 5

    BMTK-S VN0 1D-EN ® T racker V ersion 1 2 Bu ilding A uto mation S ystem H ardwa re In stallati on This guide and th e information in it are the prop erty of Ame rican Standard I nc. and may not be u sed or rep roduced in whole or i n part, without the written permission of Am erican Standard Inc. Since T rane ha s a policy of continuous product im ...

  • Trane Building Automation System - page 6

    ® BMTK-S VN0 1 D-EN NO TICE: W a rnings and Cautions appear at appropriate sections throughout this manual. Read these careful ly:  W ARNING Indicate s a potentially hazar dous situation, which, if not a voided, cou ld result in death or ser ious injury .  CA UT ION Indicate s a pot entially hazar dous sit uation, which, if not a voided, ma ...

  • Trane Building Automation System - page 7

    BMTK-S VN0 1D-EN i Cont ents C h a p t e r 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Controller co mponents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 T ermination module . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 Main module. . . . . . ...

  • Trane Building Automation System - page 8

    Conte nts ii BMTK-S VN0 1 D-EN Wire the UC Ms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 Wire spec ifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 9 UCM wiring c onfigurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2 T er mination r ...

  • Trane Building Automation System - page 9

    BMTK-S VN0 1D-EN 1 ® Chapt er 1 Ov ervi ew The T r acker bu ilding aut omation system ( BAS) is an ene rgy manag ement system for small- to medium-size buildings. The T racker BAS controls heating, ventil ating, and air conditioning (HV AC) equipment. It consist s of a T racker controller (Figure 1) and an optio nal PC wo rkstatio n. The T racker ...

  • Trane Building Automation System - page 10

    ® Chapter 1 O verview 2 BMTK-S VN0 1 D-EN Figur e 2 . Example T r ack er building automation syst em (models 12 and 24) on a netw or k V ariT rac central control panel V ariT rac or V ariT rane zone dampers V oy ager rooftop V oy ager const ant volume roof top Precedent roof top with ReliaT el controls Priority shutdown contact input Outdoor air t ...

  • Trane Building Automation System - page 11

    Overvie w BMTK-S VN0 1D-EN 3 ® Figur e 3. Example building automat ion syste m (wat er -source heat pump) on a networ k V oy ager constant volume roof top Precedent roof top with ReliaT el controls Priority shutdown contact input Outdoor air temperature sensor input Utility pulse meter input Analog inputs Binar y outputs T racer ZN51 7 unitar y co ...

  • Trane Building Automation System - page 12

    ® Chapter 1 O verview 4 BMTK-S VN0 1 D-EN Contr oller components The contro ller consis ts of a te rminatio n module, ma in modul e, and display modul e (Figure 4). Figur e 4. T ra ck er contr oller components T ermination module Main module Display module ...

  • Trane Building Automation System - page 13

    Cont rolle r co mponen ts BMTK-S VN0 1D-EN 5 ® T er mination module The termin ation mo dule (F igure 5 ) is a hou sing th at prov ides a terminatio n board and cable acce ss for power , communications, and system input connections. Mounting hole s enable it to be mounted o n a wall or a recessed conduit box. Th e termination board accepts connect ...

  • Trane Building Automation System - page 14

    ® Chapter 1 O verview 6 BMTK-S VN0 1 D-EN Main module The main module (Fig ure 6) is a housing that contains t he main logic board an d the Et hernet board. T he main module can be “hot swapped ”: it can be removed and instal led wi thout removing po wer from the terminatio n module . When the main modu le is in stall ed onto a p owered termin ...

  • Trane Building Automation System - page 15

    Cont rolle r co mponen ts BMTK-S VN0 1D-EN 7 ® Display module The displa y module (Fig ure 7) is a housing that con tains a prin ted circuit board, liqu id cryst al display (LCD) t ouch screen , and an alarm LE D. The printed circuit board s upports the LCD touch screen and the alarm LED. The to uch s cree n prov ides t he oper ator acc ess t o th ...

  • Trane Building Automation System - page 16

    ® Chapter 1 O verview 8 BMTK-S VN0 1 D-EN Model numbers Each controll er is identif ied by a model n umber that pro vides in formation about the controller (Fi gure 8). Figur e 8 . Model number definition Digit number 123456789 10 11 12 13 14 Model numb er B M T K 0 0 0 A A 0 A x 1 0 Digit Descripti on 1–2 BM = Build ing management 3–4 TK = T ...

  • Trane Building Automation System - page 17

    T rac k er controller specifica tions BMTK-S VN0 1D-EN 9 ® T rac k er cont r oller specifications T able 1 shows the specifications for the T racker controller . T able 1 . T r ack er Controller specificat ions Speci fication Descr iption P ower 24 V ac nominal (1 9 V ac to 30 V ac), 50/60 Hz , 1 phase 40 V A minimum, UL Clas s 2 transform er requ ...

  • Trane Building Automation System - page 18

    ® Chapter 1 O verview 10 BMTK-S VN0 1 D-EN UCM maxi mum capaci ties for T rac k er models 12 and 24 The T racker model 12 and 24 controllers can contro l and monito r specif ic types and numbers of T ran e unit co ntrol modu les (UCM s) as s pecified in this topi c. The supporte d UCMs are as follo ws: • HV AC controllers that conform to the Lon ...

  • Trane Building Automation System - page 19

    UCM max imum cap acities for T rac k er model WSHP BMTK-S VN0 1D-EN 11 ® UCM maxi mum capaci ties for T rac k er model WSHP The T racker model WSHP controller can control and monitor specific types and numbers of T ran e unit co ntrol modu les (UCM s) as s pecified in this topi c. The supporte d UCMs are as follo ws: • Space C omf ort C ontr oll ...

  • Trane Building Automation System - page 20

    ® Chapter 1 O verview 12 BMTK-S VN0 1 D-EN Bef or e installation Before begi nning to install the T rac ker controller , make sure that you have all the necessary controller components and that they are undamage d. Also, t ake steps to protect components unt il they a re needed. IMP ORTANT Befor e you install the T r ack er hardw are, r eview t hi ...

  • Trane Building Automation System - page 21

    Af ter installation BMTK-S VN0 1D-EN 13 ® Af ter installation After ins talling th e T ra cker hardwa re, use th e post- insta llation checklis t (T able 4) to veri fy that a ll installat ion p rocedures were comp leted. T able 4. T rack er controller post-installation chec k list Inspect s hipmen t upon rec eipt ____ _ V erif y that the s hip men ...

  • Trane Building Automation System - page 22

    ® Chapter 1 O verview 14 BMTK-S VN0 1 D-EN FCC compliance The T racker controller g enerates, uses, and radiates radio frequency energy and if not installed and used in acco rdance wi th the ins truction manual, may cause interference to ra dio and televi sion reception. T he T racker controller has been tested and found to comply with the limits ...

  • Trane Building Automation System - page 23

    BMTK-S VN0 1D-EN 15 ® Chapt er 2 T er mination module mounting After unpacking a nd inspecting the sh ipment, mount the termination module. Th e mount ing proce ss for the t erminati on module consis ts of sel ectin g a loca tion and mo untin g the m odule. This c hapte r provi des information and proce dures that enable you to mount the te rminat ...

  • Trane Building Automation System - page 24

    ® Chapt er 2 T er mination module mounting 16 BMTK-S VN0 1 D-EN V er ify location confor mance to contr oller dimension s and clearances V erify that the selected location pr ovides en ough spa ce to acco mmod ate the contro ller (Figure 9) and its minimum clearances (Fi gure 10 on page 17): • The top clearance allows for ventilation and conduit ...

  • Trane Building Automation System - page 25

    Se lect a locati on for the controller BMTK-S VN0 1D-EN 17 ® Figure 1 0. Minimum clearances 36 in. (91 cm) 1 2 in. (30 cm) 1 2 in. (30 cm) 1 2 in. (30 cm) 1 2 in. (30 cm) 54 in. (1 .4 m) Distance to floor Fr ont Back ...

  • Trane Building Automation System - page 26

    ® Chapt er 2 T er mination module mounting 18 BMTK-S VN0 1 D-EN V er ify location confor mance to optimal touc h screen viewing angles V erify that t he height and loca tion enable th e user to view t he touch screen at the optimal viewing a ngles (Figure 1 1). Figure 1 1 . Opt imal touch screen viewing ang les 40 o 40 o 40 o 25 o T op view Side v ...

  • Trane Building Automation System - page 27

    Mount the termination modu le BMTK-S VN0 1D-EN 19 ® Mount the t er mination module After selecting a suitable location for the T racker controller , mount th e terminatio n module . Mount ing cons is ts of securing the termin ation module to a w all or a 2 in. × 4 in. rece ssed con duit box (mounted vertically or horizonta lly) or a 4 in. × 4 in ...

  • Trane Building Automation System - page 28

    ® Chapt er 2 T er mination module mounting 20 BMTK-S VN0 1 D-EN Secur ing the ter mination module to a w all 1. Mark t he l oca tion o f th e two moun tin g hole s on th e wal l. 2. Set the terminati on modu le asid e and drill mou nting ho les. 3. Secure th e terminat ion module to the wal l with the supplie d hard- ware (#10 × 1 in. s crew with ...

  • Trane Building Automation System - page 29

    Mount the termination modu le BMTK-S VN0 1D-EN 21 ® Installing electr ical conduit Use t he con duit o peni ngs on th e top of th e T r acker t ermi nati on mo dule to supply power or co mmunication wires to the controller . If the controlle r is mounted on a wall, you must use e lectrical conduit. If the controller is mo unted to a conduit box th ...

  • Trane Building Automation System - page 30

    ® Chapt er 2 T er mination module mounting 22 BMTK-S VN0 1 D-EN ...

  • Trane Building Automation System - page 31

    BMTK-S VN0 1D-EN 23 ® Chapt er 3 T er mination boar d wir ing After mo untin g the te rminat ion mo dule, w ire th e term ination b oar d. The wiring process consist s of wiring th e terminatio n board to 24 V a c power , inputs, o utputs, an d UCM s. This ch apter pro vides in formation an d procedu res tha t enable y ou to wire the terminatio n ...

  • Trane Building Automation System - page 32

    ® Chapt er 3 T er mination board wir ing 24 BMTK-S VN0 1 D-EN Figur e 1 4. T rac ker field wir ing connections 2 4 VAC THERMIS TO R COMM ALARM RELA Y PRIORITY SHU TDO WN METER INPU T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 24 V ac Line voltage Line voltage Comm5 link Comm5 link Comm5 device Comm5 device Splice 2 1 3 5 4 4 A A B B A A B B Legend T wist ...

  • Trane Building Automation System - page 33

    Wire 24 V ac p ower BMTK-S VN0 1D-EN 25 ® Wir e 24 V ac pow er After the te rminatio n module is mounted in the s elected lo cation, w ire 24 V ac power to the termin ation bo ard. T able 5 sho ws the s pecificatio ns for power wiring. IMP ORT A NT The 24 V ac wir e conduit may not contai n input/output or communica- tion wir es. Failur e to compl ...

  • Trane Building Automation System - page 34

    ® Chapt er 3 T er mination board wir ing 26 BMTK-S VN0 1 D-EN Wir e optional inp uts and outputs The T racker c ontro ller pr ovides inp ut and o utput t ermin als as follows : • Input for an o ptional priorit y shutdown device • Inpu t for an o ptional utili ty pulse me ter • Inpu t for an opt iona l ou tdoo r a ir tem pera tu re se ns or ? ...

  • Trane Building Automation System - page 35

    Wire optional inpu ts and output s BMTK-S VN0 1D-EN 27 ® Wir e the alar m r elay W i re th e alarm rela y to the termin ation bo ard ou tput. CA UTION A v oid Equipment D amage! Use a dedicated pow er transfor mer for this output. Failur e to do so will damag e the main module, if the alar m output is pow ered from the T rac ke r 24 V ac input (TB ...

  • Trane Building Automation System - page 36

    ® Chapt er 3 T er mination board wir ing 28 BMTK-S VN0 1 D-EN Wir e the utility pulse meter W ire the uti lity pul se meter to the te rminat ion boa rd input. 1. Route inp ut wire s in to the te rminat ion m odule t hrough a cond uit openin g (Figu re 12 on page 19) or t he con duit b ox. 2. Connect the wi res to the M ETER I NPUT termin als o n t ...

  • Trane Building Automation System - page 37

    Wire the UCMs BMTK-S VN0 1D-EN 29 ® Wir e the UCMs The Comm5 communication link conne cts unit control modules (UCMs) to the T racker termination module. Each controller has one Comm5 communi cation li nk. This topic in cludes info rmation a nd proce dures for wiring a UCM to a te rminatio n module : Wir e specifications T racker Comm5 communicati ...

  • Trane Building Automation System - page 38

    ® Chapt er 3 T er mination board wir ing 30 BMTK-S VN0 1 D-EN T abl e 7 . T rane -appro ved wir e su ppliers Supplier Cable type Num ber of pairs Details Catalog numb er Connect-Air In ternational Phon e: 1-80 0 -24 7 -1 978 F AX : 1 -25 3- 813-56 99 W eb: www .connect-a ir .com Level 4 22 AWG (0.643mm 2 ) 1 Shielde d plenum UL type CMP W221P -20 ...

  • Trane Building Automation System - page 39

    Wire the UCMs BMTK-S VN0 1D-EN 31 ® T able 8. Specifications for Ec helon Level 4 compliant cables Specificatio n Va l u e dc re sistance (Max imum resista nce of a single copper c onductor reg ardless of whether o r not it is sol id or strande d a nd r egardle ss o f whether o r not it is meta l coated.) 18. 0 Ω /1 0 0 0 feet at 2 0°C dc resis ...

  • Trane Building Automation System - page 40

    ® Chapt er 3 T er mination board wir ing 32 BMTK-S VN0 1 D-EN UCM wir i ng configurations The T racker UCM Comm5 communication -link wiring mu st be ins talled in a daisy-chai n configuration (Figure 15 o n page 32 and Figure 16 on page 33). Figur e 15. Daisy -ch ain configurat ion for UCM com munication-link wir ing (pref er r ed configura tion) ...

  • Trane Building Automation System - page 41

    Wire the UCMs BMTK-S VN0 1D-EN 33 ® Figur e 16. Daisy -chain configur ation for UCM com munication-link wir ing wit h T rac k er contr oller in middle of link T rac ker Controller T rane UCM T rane UCM T rane UCM T rane UCM T rane UCM T rane UCM F i g u re N o te : • Maximum wire l ength for daisy -c hained wiring is 4593 f t (1 40 0 m) unless a ...

  • Trane Building Automation System - page 42

    ® Chapt er 3 T er mination board wir ing 34 BMTK-S VN0 1 D-EN T er mination resist or pla cement for Comm5 links Install one 105 Ω resistor across the communication link t erminals of the device at t he beginning of the daisy chain, which is typically a T racker con trolle r . Then in stall a seco nd 10 5 Ω resistor across the communication te ...

  • Trane Building Automation System - page 43

    Wire the UCMs BMTK-S VN0 1D-EN 35 ® Figur e 1 7 . D aisy -chain t er m ination r esistor placement Comm5 device 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 AA AA BB BB COMM Comm5 device Splice 2 1 1 3 T rac k er termination board TB1 Legend T wisted pair , shielded wire per T rane specifications Shield termination Shield ground = = = Figure note = T ermin ...

  • Trane Building Automation System - page 44

    ® Chapt er 3 T er mination board wir ing 36 BMTK-S VN0 1 D-EN Figur e 18. T ermina tion r esistor placement with a T rac k er controller in the middle of the link Comm5 device Comm5 device 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A A A A A A A A B B B B B B B B COMM Comm5 device Splice Splice 2 2 1 3 3 T rac k er termination board TB1 Comm5 device Lege ...

  • Trane Building Automation System - page 45

    Wire the UCMs BMTK-S VN0 1D-EN 37 ® Wir e support ed UCMs W i re the supported UCMs to the T racker termination board. Wh en installing communication wire: • Keep th e polar ity c onsiste nt th rough out t he sit e. Alth ough Co mm5 is not polarit y sensit ive, cons istency w ill impro ve serviceab ility . • Strip away a maximum of 2 inches (5 ...

  • Trane Building Automation System - page 46

    ® Chapt er 3 T er mination board wir ing 38 BMTK-S VN0 1 D-EN • The li nk repeat er is limited t o 60 de vices o n eith er side of th e link (120 devices tot al). • The link repeater requi res an e arth grou nd. The in stalle r should be aware of th is before ma k ing power connecti ons. Recommended shield co nnections are shown in Fi gure 19. ...

  • Trane Building Automation System - page 47

    Wire the UCMs BMTK-S VN0 1D-EN 39 ® Figur e 20. Comm5 daisy -c hain re peater conne ction Comm5 device A AB B Comm5 device A AB B Link repeater Comm 2 4 VAC Comm COMM 13 14 15 Comm5 device AA AA BB BB Comm5 device Splice Splice Splice 2 1 1 1 1 3 3 3 T rac k er termination board TB1 Legend T wisted pair , shielded wire per T rane specifications Sh ...

  • Trane Building Automation System - page 48

    ® Chapt er 3 T er mination board wir ing 40 BMTK-S VN0 1 D-EN ...

  • Trane Building Automation System - page 49

    BMTK-S VN0 1D-EN 41 ® Chapt er 4 Main module mounting After mo unting and wir ing the term inatio n modu le, at tach t he main module to the terminat ion mo dule . This chapter provides information and proced ures that e nable y ou to mount the mai n mod ule. 1. V erify that all wires on the termin ation modu le are securely fasten ed in place. 2. ...

  • Trane Building Automation System - page 50

    ® Chapt er 4 Main m odule mounting 42 BMTK-S VN0 1 D-EN Figur e 21 . Main module mounting T ermination module Main module Alignment pin (four places) ...

  • Trane Building Automation System - page 51

    BMTK-S VN0 1D-EN 43 ® Chapt er 5 Displa y module mounting After m ountin g the main m odule , attach the disp lay m odule to the m ain module . This chapt er provides in formation and procedures t hat enabl e you to mount the display module. 1. T ilt the top of t he display mod ule about 3 0 degrees toward yo u. 2. L ine up th e three tab s on the ...

  • Trane Building Automation System - page 52

    ® Chapt er 5 Display module mounting 44 BMTK-S VN0 1 D-EN Figure 22. T a b and sl ot al ignment ...

  • Trane Building Automation System - page 53

    Display mo dule mounting BMTK-S VN0 1D-EN 45 ® Figur e 23. Display module eng agement ...

  • Trane Building Automation System - page 54

    ® Chapt er 5 Display module mounting 46 BMTK-S VN0 1 D-EN ...

  • Trane Building Automation System - page 55

    BMTK-S VN0 1D-EN 47 ® Chapt er 6 PC w or k station wir ing The T racker controller connect s to a PC workstation with a direct connection cable, an internal mo dem, or an Ethernet connection. V er ify PC w or kstation s pecifications V erif y that the P C co nforms to the minim um sp ecifi cation s liste d on t he insert in the CD jewel case and t ...

  • Trane Building Automation System - page 56

    ® Chapter 6 P C wor kst ation wir ing 48 BMTK-S VN0 1 D-EN IMP ORTANT Do not use a standar d phone cable fo r a dir ect connection. The RJ-12 cable is a 6-wir e straight-thr ough cable. F ailur e to co mply will cause the T rac k er contr oller to ma lfunction. IMP ORTANT The maxim um allow able length of t he RJ-12 cable is 50 f t (15 m). F ailur ...

  • Trane Building Automation System - page 57

    Direct connection to PC works tation BMTK-S VN0 1D-EN 49 ® Figur e 2 5. T ra ck er direct co nnection to a PC w or kstation LAN port for fut ure Ethernet connection (bot tom side) RJ-45 Connect RJ-1 2 to 9-pin f emale adapter T o PC workstation serial port Connect RJ-1 2 to 25-pin f emale adapter RJ-1 2 port for PC direct connection (bot tom side) ...

  • Trane Building Automation System - page 58

    ® Chapter 6 P C wor kst ation wir ing 50 BMTK-S VN0 1 D-EN Modem con nection t o PC w or kstation T o make a modem connection betw een the controller and a PC workstati on, you need an RJ -1 1 cable (s tandard t elepho ne cable). 1. Connect a RJ-1 1 ca ble (st andard te lephon e cable) into the RJ-1 1 port on th e bo ttom s ide of the con trolle r ...

  • Trane Building Automation System - page 59

    Modem connection to PC workstation BMTK-S VN0 1D-EN 51 ® Figur e 26. T rac ke r modem connection t o a PC wor kstation Phone jac k RJ-1 1 modem (bot tom side) port RJ-1 1 cable RJ-1 1 modem (bac k) port ...

  • Trane Building Automation System - page 60

    ® Chapter 6 P C wor kst ation wir ing 52 BMTK-S VN0 1 D-EN Ether net co nnectio n t o PC wor kstati on Connecting ov er an existing LAN T o make an Ethernet LAN con nection between the T racker controller and a T racker PC W orkstation t hrough an existing custome r LAN, you need two CA T 5 pa tch c able s. 1. Con nect one end of t he first CA T 5 ...

  • Trane Building Automation System - page 61

    Ethernet connection to PC worksta tion BMTK-S VN0 1D-EN 53 ® Connecting through a hub T o make an Ethernet connection be tween the T rack er controller and a T racker PC W orksta tion through a hub, you need two CA T 5 patch cables. 1. Conn ect one end of t he first CA T 5 patc h cable to the RJ-4 5 Ethernet port on the botto m side of the T racke ...

  • Trane Building Automation System - page 62

    ® Chapter 6 P C wor kst ation wir ing 54 BMTK-S VN0 1 D-EN Connecting with one cab le T o make an Ethernet connection be tween the T rack er controller and a T racker PC W orkstat ion using one cable, yo u need one CA T 5 crossover cable. 1. Con nect one end of t he CA T 5 crossover ca ble to the RJ -45 Etherne t LAN port on the bottom side of the ...

  • Trane Building Automation System - page 63

    BMTK-S VN0 1D-EN 55 ® Chapt er 7 T r oubleshooting T roublesho oting comp onents Light- emitting diode s (LEDs) and service pi n buttons ar e used for troubl eshooting t he T racker syst em. LEDs The LEDs on the T rack er controller main lo gic board an d display module show cen tral processing un it (CPU) st atus and traf fic on the C omm5 commun ...

  • Trane Building Automation System - page 64

    ® Chapt er 7 T rouble shooting 56 BMTK-S VN0 1 D-EN Figur e 3 0. T rac ker cont roller main logic boar d component location HI TX LED6 BOP SERVICE COMM LED3 LED9 LED2 S2 HRT J1 CODE PC RX PC TX LED5 LED4 S1 LED7 LED8 Ethernet board Right LED Left LED ...

  • Trane Building Automation System - page 65

    T roubleshooting c omponents BMTK-S VN0 1D-EN 57 ® T able 1 1 . T rac k er main logic board L EDs LED name LED number Color Descr iption HI TX LED6 Green Flashes whe n the main module atte mpts to communic ate with the displa y module. The main modu le attem pts to communicate with the display module even when the display m odule is n ot installed ...

  • Trane Building Automation System - page 66

    ® Chapt er 7 T rouble shooting 58 BMTK-S VN0 1 D-EN T able 13. M ain logic boar d service pin but tons and jumper Service pin but tons/ jumper Fun c t io n S1 This se rvice pin is the reset but ton. P ressing S1 reboots the c ontroller . It star ts the same operation as does rebooting the c ontroller from either the controller or the PC sof twa re ...

  • Trane Building Automation System - page 67

    Sy mptom/action troublesh ooting BMTK-S VN0 1D-EN 59 ® S ympt om/action tr oubleshooting T able 14 provides a list of symptoms that indicate a problem in the T racker system. For each symp tom, the table pro vides on e or more actions that yo u can perfo rm in an attempt to resolve the problem . T able 14. Symptom/action tr oubleshooting Symp tom ...

  • Trane Building Automation System - page 68

    ® Chapt er 7 T rouble shooting 60 BMTK-S VN0 1 D-EN T rac k er alarm output is not work ing as ex pect ed. • Confirm proper wi ring of the ala rm relay output. Consult the po st-installation c hec klist (T able 18 on page 70) for detail s. • Initiate the BO P self tes t from the display module. Note: The binary output is for alarm notificat io ...

  • Trane Building Automation System - page 69

    Sy mptom/action troublesh ooting BMTK-S VN0 1D-EN 61 ® T rac k er controller disp lays the wrong d ate. • V erify if the electrical pow er has been of f for more than 1 week (the actual time varies depe nding on sto rage temperature ). • V erify that ju mper pin J1 o n the main mo dule is in plac e. Note: The controller default date (display e ...

  • Trane Building Automation System - page 70

    ® Chapt er 7 T rouble shooting 62 BMTK-S VN0 1 D-EN ...

  • Trane Building Automation System - page 71

    BMTK-S VN0 1D-EN 63 ® Chapt er 8 Maint enance The only maintenance necessary fo r the controller is to occasionally clean and calibrat e the touc h screen. Cleaning the touc h scr een T o clean the touch screen, wipe it off with a non-abrasive cl oth. For more aggressive cl eaning, use low-pressu re compressed air to blow off the surface an d then ...

  • Trane Building Automation System - page 72

    ® Ch a pte r 8 Ma i nte n a nc e 64 BMTK-S VN0 1 D-EN ...

  • Trane Building Automation System - page 73

    BMTK-S VN0 1D-EN 65 ® Appendix A Installation c hec klists Requir ed supplies T able 15 lists the sup plies required for al l T racke r install ati ons. Optio nal supp lies T able 16 lists th e supp lies th at may o r may not b e nece ssary , depe nding on the T rac ker in stalla tion. T able 15. Requir ed supplies chec klist ; Wir ing installatio ...

  • Trane Building Automation System - page 74

    ® Appendix A Installation chec k lists 66 BMTK-S VN0 1 D-EN Comm5 UCM ide ntification an d locatio n Each UCM has a uni que 12-di git iden tifier th at serves as its address . The T racker controller uses the address to communicate with the UCM. The insta ller must kno w the UCM addre sses when a ssigning na mes to UCMs during s etup. Use T able 1 ...

  • Trane Building Automation System - page 75

    Comm5 UC M identifica tion and location BMTK-S VN0 1D-EN 67 ® Space Comf ort Contr ollers (continued) Edited nam e Locati on or area serv ed 12 di git ID T able 17 . Comm5 UCM identific ation and location (Cont inued) ...

  • Trane Building Automation System - page 76

    ® Appendix A Installation chec k lists 68 BMTK-S VN0 1 D-EN V ar iT ra c central c ontrol panels (1 0 maxim um) Edited nam e Locati on or area serv ed 12 di git ID I/O modules (4 maximum) Edited nam e Locati on or area serv ed 12 di git ID T able 17 . Comm5 UCM identific ation and location (Cont inued) ...

  • Trane Building Automation System - page 77

    Pre-installation wiring notes BMTK-S VN0 1D-EN 69 ® Pr e-installation wir ing not es The wiring for the T racker system will have been completed prior to T racker installation. All T racker wiring conforms to the following guid elines: • The T racker controller receives 24 V a c from a dedicated power circuit. If not, the T ra cker controller ma ...

  • Trane Building Automation System - page 78

    ® Appendix A Installation chec k lists 70 BMTK-S VN0 1 D-EN T er mination m odule post-install ation ch e ck l i s t Use T able 18 to verify that the circuits connected to the termination board on th e terminat ion mod ule are wired correctly . Record test results in the “Actual value” co lumn. T able 18. T er mination module post-installation ...

  • Trane Building Automation System - page 79

    T ermination module post-installation c hec klist BMTK-S VN0 1D-EN 71 ® T a ble 19. Th er mistor senso r electrical c haracter i stics T emper atur e ( ºF ) T em perature ( ºC ) Sensor r esistan ce (ohms x 1 0 0 0) –30 –34 24 1 .1 –20 –29 170.1 –1 0 –23 121 . 4 0– 1 8 8 7 . 6 10 – 1 2 6 3 . 8 20 –7 46.9 30 –1 34.5 40 4 26.2 5 ...

  • Trane Building Automation System - page 80

    ® Appendix A Installation chec k lists 72 BMTK-S VN0 1 D-EN ...

  • Trane Building Automation System - page 81

    BMTK-S VN0 1D-EN 73 ® Appendix B Declar ation of Conf or mity This ap pendix pr ovides the Decl aration of Conformit y statement for the T racker model 12, 24 , and WSHP cont roll ers. All T racker models are currently CE certified. ...

  • Trane Building Automation System - page 82

    ® Appendix B Declar a tion of Conf ormity 74 BMTK-S VN0 1 D-EN Declar ation of Conf ormity Manufactur er’s Name: Manufactu rer’s Add ress: Trane 4833 Wh it e Bea r Parkw ay Sain t Paul, Minnesot a 55110 USA The manufacturer hereby de clares that the product: Product Na me: Product N umber: Tracke r mo del 1 2, 2 4, and wa ter- sou rce h eat p ...

  • Trane Building Automation System - page 83

    BMTK-S VN0 1D-EN 75 ® Index Numer ics 24 V ac power wiring, 25 A adap ter s for direct co nnection to P C, 47 alar m rel ay wire requirements, 26 wiring procedures, 27 anal og i npu t, 9 thermistor , gene ral, 26 thermistor , wiring , 28 B binary input priority shutd own device in put, wiring, 27 priority shutd own device, g eneral, 26 utility pul ...

  • Trane Building Automation System - page 84

    Index 76 BMTK-S VN0 1 D-EN E EIA-232 co nnection installing , 47 LEDs , 5 5 electrica l conduit install ation, 19, 21 electr ical interferen ce, 15 Ethernet co mmunication por t, 48 Ethe rnet con ne cti on to PC proced ures, 52 I I/O modul es maximum c apacity pe r controller , 10, 11 I/O option s, 26 installati on after , 13 before, 12 c hec klist ...

  • Trane Building Automation System - page 85

    Ind ex BMTK-S VN0 1D-EN 77 descriptio n, 37 limitations , 37 requirem ents, 37 wiring, 29 RJ-1 1 cable ins tallation, 5 0 modem co nnection procedures, 50 PC communi cation por t, 48 RJ-12 cable ins tallation, 4 7 direct con nection procedures, 48 par ts specific ations, 47 PC communi cation por t, 48 RJ-45 Ethernet co nnection proc edures, 52 S SC ...

  • Trane Building Automation System - page 86

    Index 78 BMTK-S VN0 1 D-EN wire Comm5, 29 requirem ents for alarm relay , 26 requirements for meter , 26 requirem ents for outdoo r air tempera ture sensor , 26 requirements for priority shut down device i nput, 26 specific ations, 29 wiring 24 V ac, 25 alarm re lay , 27 configuratio ns for Comm5 UCM commu nica tion , 32 daisy -cha in configuratio ...

  • Trane Building Automation System - page 87

    ...

  • Trane Building Automation System - page 88

    ® T rane has a poli cy of cont inuous product a nd produc t data im prove ment and reserve s the righ t to c hang e design and spe cificati ons with out no tice. Only qual ified technicians s hould per form th e installa - tion a nd servi cing of e quipmen t referred t o in this publicat ion. Lite ratu re O rde r Num ber BMTK -SVN01D-EN File Nu mb ...

Manufacturer Trane Category Thermostat

Documents that we receive from a manufacturer of a Trane Building Automation System can be divided into several groups. They are, among others:
- Trane technical drawings
- Building Automation System manuals
- Trane product data sheets
- information booklets
- or energy labels Trane Building Automation System
All of them are important, but the most important information from the point of view of use of the device are in the user manual Trane Building Automation System.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Trane Building Automation System, service manual, brief instructions and user manuals Trane Building Automation System. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Trane Building Automation System.

A complete manual for the device Trane Building Automation System, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Trane Building Automation System by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Trane Building Automation System.

A complete Trane manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Trane Building Automation System - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Trane Building Automation System, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Trane Building Automation System, that we can find in the current document
3. Tips how to use the basic functions of the device Trane Building Automation System - which should help us in our first steps of using Trane Building Automation System
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Trane Building Automation System
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Trane Building Automation System in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Trane Building Automation System?

Use the form below

If you did not solve your problem by using a manual Trane Building Automation System, ask a question using the form below. If a user had a similar problem with Trane Building Automation System it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)