Manual Hobart ML-130250

44 pages 2.37 mb
Download

Go to site of 44

Summary
  • Hobart ML-130250 - page 1

    701 S. RIDGE A VENUE TROY , OHIO 45374-0001 937 332-3000 www .hobartcorp.com F47505 (October 2014) FT1000-SERIES DISHW ASHERS MODEL ML-130250 COVERS ALL OF THE FOLLOWING MODELS FT1000 FT1000-ER FT1000-ER-BD FT1000S FT1000S-ER FT1000S-ER-BD ...

  • Hobart ML-130250 - page 2

    – 2 – © HOBART 2008 ...

  • Hobart ML-130250 - page 3

    – 3 – T ABLE OF CONTENTS NOTES FOR THE INST ALLERS ................................................... 4 How to Reduce the Clearance Height of the Control Box During Move-In ................ 4 UNP ACKING .................................................................. 6 Removing Each Section From Its Skid ..................................... ...

  • Hobart ML-130250 - page 4

    – 4 – Installation and Care Of FT1000 SERIES DISHW ASHERS SA VE THESE INSTRUCTIONS GENERAL NOTES FOR THE INST ALLERS Read the entire manual befor e installing the machine . 1. Do not use a forklift to move or unskid machine sections. 2. Do not throw out any loose parts. These may be required for installation or operation. 3. Electrical Connecti ...

  • Hobart ML-130250 - page 5

    – 5 – 1. Remove the two shipping hinges from the side of the control box by removing the two 5/16-18 bolts from each bracket. 2. While two people are securely supporting the main control box, remove the four 5/16-18 nuts, lock washers, and washers from the inside of the shipping braces behind the control box. 3. Using at least two people, CAREF ...

  • Hobart ML-130250 - page 6

    – 6 – UNP ACKING Immediately after unpacking the dishwasher , check for possible shipping damage. If the machine is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery . Before installation, test the electrical service to make sure it agrees with the specicationsonthemachinedatap ...

  • Hobart ML-130250 - page 7

    – 7 – 7. Remove any packaging, tape, wire and bracing from each section. Remove all rear and lower panels. 8. V erify that shipping tape has been removed from all oats in each tank and that theoatsarefreetooperateproperly . NOTE: Do no throw out any loose parts. These may be r ...

  • Hobart ML-130250 - page 8

    – 8 – • Continue to level the center section front to back by removing the top panels and placing level across the top of the chambers on both ends of center section (Fig. 3). Fig. 3 ASSEMBL Y Rotating Control Box 90 Degrees The main control box is shipped with the upper and lower shipping hinges connected to the side of the control box. Remo ...

  • Hobart ML-130250 - page 9

    – 9 – TRIM EXCESS TAPE FROM INSIDE OF CHAMBER FLANGE FOLD FRONT EDGE OF FOAM TAPE 1/2 ” FRONT OF MACHINE Fig. 4 Fig. 5 Fig. 6 Apply foam tape to unload chamber section where the rear perimeter of the control box will be mounted. ...

  • Hobart ML-130250 - page 10

    – 10 – Attaching Control Box to Unload Section 1. For ease of control box installation, remove the detachable leg section on the front leg of the unload section where the control box will be mounted by removing the upper and lower ¼-20 hardware. This will allow the wires, which are preinstalled in the control box, to pass by the leg assembly f ...

  • Hobart ML-130250 - page 11

    – 1 1 – 8. Remove the two shipping braces from the end of the dual rinse section by removing the three 5/16 bolts and associated hardware from each brace. 9. Reinstall the detachable leg section removed in step 1. Positioning the Adjacent Load or Unload Sections Move the adjoining (load or unload) section to within several inches of the prepare ...

  • Hobart ML-130250 - page 12

    – 12 – SECURE VERTICAL FRAME CORNER POSTS AT TWO LOCATIONS Fig. 8 Installing the Curtain Bafes and Unload Air Bafe - T op of Chamber Flanges On prewash/wash section joint, install curtain bafe plate on wash side at the top of the chamber where sections are being joined using appropriate fast ...

  • Hobart ML-130250 - page 13

    – 13 – Fig. 9 On dual rinse/unload section joint, install the unload air bafe and two curtain hangers. The curtainhangers mounton totheair bafestuds wheretheyprotrude thru theupper front andrear corner chamberholes on thena ...

  • Hobart ML-130250 - page 14

    – 14 – CHAMBER FLANGE AND BOL T ASSEMBL Y A T EACH SECTION JOINT Description Qty . Bolt Size Assembly Order Instructions Short Bolt-Use except where long bolts or medium bolts are required 22 ¼-20 x 5/8” [Bolt, W asher] [W asher , Lockwasher , Nut] Use permagum on insides of washers on both sides of chamberanges. Medium Bolt-Use for cu ...

  • Hobart ML-130250 - page 15

    – 15 – PERMAGUM SADDLE JOINT PERMAGUM Fig. 13 Control Box Connections Refer to the electrical diagram stored inside the main control box door . After use, make sure that the diagram is placed inside the control box. Although each section is prewired, components in the load and unload sections must be electrically connected to the main control b ...

  • Hobart ML-130250 - page 16

    – 16 – Installing the Flowback Pipe (W ash to Prewash T anks) Installtheowbackpipebetweenthewashtankandtheprewashtank(Fig.14). Make sure the owback pipe is adequately lubricated with O-ring lube (not supplied). Make sure O-rings are in their proper places on the ...

  • Hobart ML-130250 - page 17

    – 17 – Relocating Master Drain to Load End (Only Machines Equipped with Auto Clean, Auto Delime, & the ASR Section) NOTE: If the dish machine is equipped with the Auto Clean and Auto Delime features, but does not contain the ASR section, then the Master Drain assembly must remain located at the unload end of the machine. With this congur ...

  • Hobart ML-130250 - page 18

    – 18 – For a R-L machine (steps 9-1 1): 9. Remove pipe (00-948761-00018) connecting the master drain and the nearest drain tee. 00-948761-00018 can be discarded. See Fig. 16. 00-948761-00018 Fig. 16 10. Remove rubber hose connected to drain tee located at load end of the unit. 1 1. Swap load end drain tee including drain ca ...

  • Hobart ML-130250 - page 19

    – 19 – 21. Loosen clamps securing rubber hoses to drain solenoid valve and rotate solenoid valve 180 degrees. Retighten clamps. 22. Attach rubber hoses to plastic drain tee and barbed tting on master drain assembly and tighten clamps. Ensure assembly matches correct diagram for direction of unit (Fig. 1 ...

  • Hobart ML-130250 - page 20

    – 20 – 29. Remove two bolts, nuts, and washers attached to the load support bracket shipped with the machine (00-950109). See Fig. 19. TWO STUDS 00-950109 Bottom View (R-L Machine) Fig. 19 30. Attach load support bracket to load master drain platform using two studs located on the bottom of the load drain platform. Ensure bracket wraps over the ...

  • Hobart ML-130250 - page 21

    – 21 – DRAIN BACK PAN SLOPES TOWARD PREWASH TANK WASH SECTION LOWER TRACK Fig. 20 Fig. 21 Install the pan between the dual rinse and unload section ensuring that the pan slopes towards the dual rinse tank (Fig. 22). Secure the pan to the lower front and rear tracks using two ¼-20 x ½” bolts, lock washers, and? ...

  • Hobart ML-130250 - page 22

    – 22 – REAR PANEL TOP PANEL FRONT PANEL Fig. 24 2. Install one of the blower assemblies on top of the heater housing by lowering the blower assembly on an angle so that the front tabs hook underneath the notches on the top plate of the heater housing (Fig. 25 and 26). BLOWER ASSEMBLY NOTCH FRONT TAB FRONT TAB NOTCH Fig. 25 Fig. 26 3. Lower the ...

  • Hobart ML-130250 - page 23

    – 23 – 5. Repeat steps 2 thru 4 to install the second blower assembly . 6. Route both blower cables between the blower assemblies and the vertical enclosure panel to the rear of the control box. NOTE: Ensure that the cables are not routed on the side of the blowers where the air intake chamber openings are located. 7. Connect blower motor wires ...

  • Hobart ML-130250 - page 24

    – 24 – ELECTRICAL CONNECTION(S) Electrical and grounding connections must comply with applicable portions of the National Electrical Code (NFP A No. 70, latest edition) and/or other local electrical codes. Disconnect the electrical power to the machine and follow lockout/tagout procedures. There may be multiple circuits. Be sure all circuits ar ...

  • Hobart ML-130250 - page 25

    – 25 – Separate Electrical Connections Separate electrical connections in the main control box may be required for an optional electric blower dryer heater (when equipped) and for optional electric tank heaters (when equipped) unless equipped with optional circuit breakers. When equipped with an optional electric booster heater , a separate ele ...

  • Hobart ML-130250 - page 26

    – 26 – V ent Fan Control Machine electrical circuits can be used to switch a vent fan, supplied by others. On all models, the vent fan is ON when the main power switch is on. The two terminal connections for the vent fan control are both labeled VFC and are provided as a switchingcircuittocontroltheventfan. A location ...

  • Hobart ML-130250 - page 27

    – 27 – Final Rinse For FT1000 Base models, the required minimum hot water temperature for the nal rinse is 1 10° F when an electric or steam booster heater is supplied (same connectionpointfor ll).ForFT1000 EnergyRecovery models,theminimum cold water temp ...

  • Hobart ML-130250 - page 28

    – 28 – STEAM USAGE / REQUIREMENTS – POUNDS PER HOUR Model T ank Heat Booster 1 10 F Incoming W ater , 75 F Rise Dryer TOT AL T ank Heat & Booster TOT AL T ank Heat, Booster , & Dryer FT1000-Base 209 47 - 256 - FT1000S-Base 171 47 - 218 - FT1000-ER 213 42 - 255 - FT1000S-ER 171 42 - 213 - FT1000-ER-BD 213 42 30 255 285 FT1000S-ER-BD 17 ...

  • Hobart ML-130250 - page 29

    – 29 – Auto Clean Hose Connections (When Equipped) Route Auto Clean hoses, located beneath unload section, to appropriate tank barbed connectionttings.Seebelowdiagramsforsolenoidvalvetotankdesignations. Right to Left FT1000 V alve Section Solonoid Designation 1 ASR 9 sol 2 PW/W Low 10 sol 3 PW 1 1 sol 4 W 12 sol ...

  • Hobart ML-130250 - page 30

    – 30 – Auto Clean Hose Part Numbers T o Each Chamber Machine Conguration ASR Prewash Upper Prewash/wash Lower W ash Upper Power Rinse Dual Rinse Standard w/ ASR 949942-1 949942-2 949942-3 949942-3 949942-3 949942-5 Standard w/o ASR Shorty w/ ASR 949942-2 949942-4 Shorty w/o ASR 949942-3 CONVEYOR ASSEMBL Y Prior to installing the conveyor , l ...

  • Hobart ML-130250 - page 31

    – 31 – Fig. 32 • T ie a rope to the rst conveyor rod. Feed the rope through the machine following thedesiredpathof theconveyorwiththeight linkspointingup. Theconveyor rollers must be fed between the upper roller guides and the tracks (Fig. 33). TRACKS ...

  • Hobart ML-130250 - page 32

    – 32 – • Remove the conveyor roller from one end of the last conveyor rod on the rst section. Then pull the conveyor rod out and save the roller and washers for re- assembly . T o join the sections, thread the rod back through the side bars and washerandthenthroughtheightlin ...

  • Hobart ML-130250 - page 33

    – 33 – Conveyor Offset Side Bar Conveyor offset side bars are supplied for use with the standard conveyors and are to be used, if necessary , when making the nal connection to join the two conveyor ends. The total length of all conveyor sections shipped may slightly exceed the optimal length requi ...

  • Hobart ML-130250 - page 34

    – 34 – Fig. 38 NOTE:  The proper length of conveyor , when adjusted, will have the ight links close to engaging the load ngers at the load platform. It may be necessary to remove oneortwoconveyorrods(withrowsofightlinks) ...

  • Hobart ML-130250 - page 35

    – 35 – If the conveyor is tracking straight but travels closer to the front (door side) or toward the rear of the machine, then do the following: • If tracking closer to the front, tighten the adjusting bolt on the front take-up unit. • If tracking closer to the rear , tighten the adjusting bolt on the rear take-up unit. Run the conveyor fo ...

  • Hobart ML-130250 - page 36

    – 36 – Prewash, W ash, and Power Rinse Arms The upper and lower prewash, wash, and power rinse arms must be installed in their correct locations. T o install each of the upper or lower arms, slide manifolds on the supports toward the rear of the machine and ensure the tabs on the sides of the arms drop into the notches in the supports (Fig. 40) ...

  • Hobart ML-130250 - page 37

    – 37 – Automatic Soil Removal (ASR) Arms (When Equipped) ASR arms must be in their proper locations (Fig. 42). Fig. 42 ...

  • Hobart ML-130250 - page 38

    – 38 – Bafe Settings The below diagram and chart outlines the standard bafe settings for eachof the machinecongurations. 5/6 2 3 4 7 1 ...

  • Hobart ML-130250 - page 39

    – 39 – BAFFLE SETTINGS Machine T ype Bafe Setting Machine T ype Bafe Setting Standard Machine 1 Closed Shorty Machine 1 Closed 2 Open 2 Open 3 N/A 3 N/A 4 N/A 4 N/A 5 Closed 5 Closed 6 Closed 6 Closed 7 N/A 7 N/A Standard Machine with Blower Dryer 1 Closed Shorty Machine with Blower Dryer 1 Closed 2 Open 2 Closed 3 Closed 3 Closed 4 Open ...

  • Hobart ML-130250 - page 40

    – 40 – Lower T rim Panels (Front) and Rear Panels When installing the lower trim panels on the front of the machine, butt each panel end to end. With the bottom of the panel held out on a 45° angle (Fig. 43), hang the upper lip of the panel over the hooks located just below the doors (Fig. 44). Swing the bottom of the panel down and snap the l ...

  • Hobart ML-130250 - page 41

    – 41 – This may cause the dish limit arm to trip and stop the conveyor movement. If the conveyor stops for any reason during the 20 minute calibration period, the procedure should be rerun from the beginning to ensure proper calibration. After 20 minutes, unblock the photo detector . When the nal rinse output ...

  • Hobart ML-130250 - page 42

    – 42 – ...

  • Hobart ML-130250 - page 43

    – 43 – ...

  • Hobart ML-130250 - page 44

    – 44 – ...

Manufacturer Hobart Category Dishwasher

Documents that we receive from a manufacturer of a Hobart ML-130250 can be divided into several groups. They are, among others:
- Hobart technical drawings
- ML-130250 manuals
- Hobart product data sheets
- information booklets
- or energy labels Hobart ML-130250
All of them are important, but the most important information from the point of view of use of the device are in the user manual Hobart ML-130250.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Hobart ML-130250, service manual, brief instructions and user manuals Hobart ML-130250. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Hobart ML-130250.

Similar manuals

A complete manual for the device Hobart ML-130250, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Hobart ML-130250 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Hobart ML-130250.

A complete Hobart manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Hobart ML-130250 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Hobart ML-130250, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Hobart ML-130250, that we can find in the current document
3. Tips how to use the basic functions of the device Hobart ML-130250 - which should help us in our first steps of using Hobart ML-130250
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Hobart ML-130250
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Hobart ML-130250 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Hobart ML-130250?

Use the form below

If you did not solve your problem by using a manual Hobart ML-130250, ask a question using the form below. If a user had a similar problem with Hobart ML-130250 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)