Bedienungsanleitung Emerson Process Management I-0320

47 Seiten 5.21 mb
Download

Zur Seite of 47

Summary
  • Emerson Process Management I-0320 - page 1

    (I-0320--.doc/1) 1 SERVICE MANUAL No. I-0320 MULTIPORT FLOW SELECTOR CUSTOMER: P.O. # W.O. # TAG: DATE: OPERATOR MODEL I-0320--.DOC/1 REV 1: AUG-31-04 Bettis Canada Ltd. 4112-91A Street Edmonton, Alberta Canada T6E 5V2 Tel: 780-450-3600 Fax: 780-450-1400 ...

  • Emerson Process Management I-0320 - page 2

    (I-0320--.doc/2) 2 TABLE OF CONTENTS I INTRODUCTION ............................................................................................................................... ............ 4 II MULTIPORT SPECIFICATIONS ................................................................................................................ 4 IIB ACTUATOR ...

  • Emerson Process Management I-0320 - page 3

    (I-0320--.doc/3) 3 OBSERVE ALL WARNING DECALS AND TAGS MINIMUM TOOLS REQUIRED: A torque wrench, socket wre nch, and allen head wrench es are required to install the Multiport and Actuator assembly. MULTI PO RT SIZE NPS 2” NPS 3” ANSI 600 NPS 3” ANSI 900/1500 NPS 4” ANSI 600 NPS 4” ANSI 900 BONNET NUT SOCKET SIZE 1 7/16” 2” 2 3/8” 2 ...

  • Emerson Process Management I-0320 - page 4

    (I-0320--.doc/4) 4 I INTRODUCTION As many as eight flow-lines c an be manifolded through one BETTIS Multiport Flow Sele ctor. The multiport allows diversion of an individual flow-line to a test outlet for testing or sampling, while combining t he flow of t he other fl ow-lines in to a separate g roup outl et. II MULTIPORT SPECIFICATIONS RATING SIZE ...

  • Emerson Process Management I-0320 - page 5

    (I-0320--.doc/5) 5 MULTIPORT SIZE AND RATING NPS 2" ANSI 600 NPS 3" ANSI 600 NPS 3" ANSI 900/1500 NPS 4" ANSI 600 NPS 4" ANSI 900 TEST OUTLETC V 67 151 100 27 0 218 GROUP OUTLET C V 262 594 429 1040 830 SHELL HYDROSTATIC TEST PRESSURE PSIG (KPa) 2200-2220 (13780-15300) 2160 (14900) 5560 (38310) 2220 (15300) 3330 (22950) MAX ...

  • Emerson Process Management I-0320 - page 6

    (I-0320--.doc/6) 6 III MULTIPORT INSTALLATION Before installing the unit, observe all warning tags and: 1. Check for external physical damage. 2. Check for any visible leak age of gear oil from th e speed reducer (426). 3. Visually inspect the inside of the multipo r t through the group outlet port checking fo r d amage, rust, and de bris. 4. Check ...

  • Emerson Process Management I-0320 - page 7

    (I-0320--.doc/7) 7 with the #6 well connection. This allows for the installation of the connector pin. Note that installing the pin may require elect rical power so that the upper section of the connector c an be rotated to align the bolt hole. 2. Install the lower section of the connect or onto th e stem flat. Orient th e lower section of the conn ...

  • Emerson Process Management I-0320 - page 8

    (I-0320--.doc/8) 8 2. Controll er address ( I-0168 Se ction J). 3. Control room M ODBUS RTU operation ( I-0168 Secti on D). 4. Installation and use of Bettis Multiport Electronic Controller software on laptop PC. IV MULTIPORT MAINTENANC E Refer to the typical multiport assembly drawing AB0461 on page 14 and the multiport cutaway drawing AB0462 on p ...

  • Emerson Process Management I-0320 - page 9

    (I-0320--.doc/9) 9 NOTE:If the seal wave springs are not properly alig ned and seated the plug seal may not h old rated differential pressure. 3. Install the seal back-up plate (143) against the shoulder in the plug. 4. Lubricate and install the plug seal o-ring (149) on the stainless steel portion of the plug seal assembly (142). Lubricate and ins ...

  • Emerson Process Management I-0320 - page 10

    (I-0320--.doc/10) 10 bonnet in place on the multip o rt body with the s eal injection fitting over the group ou tlet. The bonnet stud h oles must be al igned with t he body’s t apped stud hol es. NOTE:Ensure the b onnet is flat and low ered slowly onto the top of th e multiport body in or der to prevent damaging th e body o-ring and plug seals. P ...

  • Emerson Process Management I-0320 - page 11

    (I-0320--.doc/11) 11 3. Turn the plug (130) at least one complete revolution while checking for smooth movement. If the plug seal asse mbly (142 ) is bindin g at inlet ports when the plug is rotated, the plug seal assembly or the seal wave springs (140) are not in thei r proper position(s). See disassembly procedure below, if required. 4. Install t ...

  • Emerson Process Management I-0320 - page 12

    (I-0320--.doc/12) 12 NOTE: An index mark on one flat on the square end of the plug (130) indicates port position. Ins tall the connector so that the index mark is visible. 4. Install the indicator (188) on th e upper connector (410) using th e nut (192). Ensure that the indicator is al igned wi th the inde x mark o n the square e nd of the pl ug. 5 ...

  • Emerson Process Management I-0320 - page 13

    (I-0320--.doc/13) 13 VIII TROUBLESHOOTING A. Actuator Does Not Align Plug (130) t o Port. 1. Check the multiport/actuator co nn ector for looseness. 2. Check the Switchpak/actuat o r connector for looseness. 3. Check the motor for stalling or overload. 4. Check the speed reducer for visual leakage or noisy gear. 5. Check the accuracy of the positio ...

  • Emerson Process Management I-0320 - page 14

    (I-0320--.doc/14) 14 IX DRAWINGS ...

  • Emerson Process Management I-0320 - page 15

    (I-0320--.doc/15) 15 ...

  • Emerson Process Management I-0320 - page 16

    (I-0320--.doc/16) 16 ...

  • Emerson Process Management I-0320 - page 17

    (I-0320--.doc/17) 17 ...

  • Emerson Process Management I-0320 - page 18

    (I-0320--.doc/18) 18 ...

  • Emerson Process Management I-0320 - page 19

    (I-0320--.doc/19) 19 ...

  • Emerson Process Management I-0320 - page 20

    (I-0320--.doc/20) 20 X TYPICAL MULTIPORT SEAL COMPONENTS PLUG SEAL COMPONENTS SEAL ASSEMBLY (L–>R: BACKUP PL ATE, O-RING, SEAT R ING, SEAL I NSERT, ASSEM B LY ) ...

  • Emerson Process Management I-0320 - page 21

    (I-0320--.doc/21) 21 SEAL ASSEMBLY (TOP: ASSEMBLY. B OTTOM (L–> R): SEAL ADJUSTME NT NUT, SEAL W AVE SPRINGS, SEAT RING/PLA TE/O- RING/SEAL IN SERT, SCRAPER WAVE SPRINGS, SCRAPER) PLUG SEAL ADJ USTMENT TOOL SHOWN WIT H BASE PARALL EL TO SHANK F OR INSERTION, BASE PERP ENDICU LAR TO SHANK, AND ENGA GED IN SEAL ADJUSTMENT NUT. ...

  • Emerson Process Management I-0320 - page 22

    (I-0320--.doc/22) 22 PLUG (Index mark can be found on the stem flat that faces the sam e way as the plug sea l opening.) PLUG SEAL ADJUSTMENT TO OL IN PLUG ...

  • Emerson Process Management I-0320 - page 23

    (I-0320--.doc/23 or ig:ss/ss-2004-02-09 rev1:ss/ss- 2004-08-31 app DIST :(EF)O ; ( SM)P) 23 XI MULTIPORT FLOW SELECTOR NOTES ...

  • Emerson Process Management I-0320 - page 24

    (I-0320--.doc/appendix) 24 APPENDIX 1: MOTORS A: Baldor Motors ...

  • Emerson Process Management I-0320 - page 25

    (I-0320--.doc/appendix) 25 ...

  • Emerson Process Management I-0320 - page 26

    (I-0320--.doc/appendix) 26 ...

  • Emerson Process Management I-0320 - page 27

    (I-0320--.doc/appendix) 27 B: Elnor Motors ...

  • Emerson Process Management I-0320 - page 28

    (I-0320--.doc/appendix) 28 ...

  • Emerson Process Management I-0320 - page 29

    (I-0320--.doc/appendix) 29 ...

  • Emerson Process Management I-0320 - page 30

    (I-0320--.doc/appendix) 30 ...

  • Emerson Process Management I-0320 - page 31

    (I-0320--.doc/appendix) 31 ...

  • Emerson Process Management I-0320 - page 32

    (I-0320--.doc/appendix) 32 C: Pacific Scientific Motors ...

  • Emerson Process Management I-0320 - page 33

    (I-0320--.doc/appendix) 33 ...

  • Emerson Process Management I-0320 - page 34

    (I-0320--.doc/appendix) 34 ...

  • Emerson Process Management I-0320 - page 35

    (I-0320--.doc/appendix) 35 ...

  • Emerson Process Management I-0320 - page 36

    (I-0320--.doc/appendix) 36 APPENDIX 2 : GEAR RE DUCERS A: Morse Gearbox ...

  • Emerson Process Management I-0320 - page 37

    (I-0320--.doc/appendix) 37 ...

  • Emerson Process Management I-0320 - page 38

    (I-0320--.doc/appendix) 38 ...

  • Emerson Process Management I-0320 - page 39

    (I-0320--.doc/appendix) 39 B: Boston Gear Gearbox ...

  • Emerson Process Management I-0320 - page 40

    (I-0320--.doc/appendix) 40 ...

  • Emerson Process Management I-0320 - page 41

    (I-0320--.doc/appendix) 41 ...

  • Emerson Process Management I-0320 - page 42

    (I-0320--.doc/appendix) 42 ...

  • Emerson Process Management I-0320 - page 43

    (I-0320--.doc/appendix) 43 ...

  • Emerson Process Management I-0320 - page 44

    (I-0320--.doc/appendix) 44 ...

  • Emerson Process Management I-0320 - page 45

    (I-0320--.doc/appendix) 45 ...

  • Emerson Process Management I-0320 - page 46

    (I-0320--.doc/appendix) 46 ...

  • Emerson Process Management I-0320 - page 47

    (I-0320--.doc/appendix) 47 C: Baldor Ge arbox ...

Produzent Emerson Process Management Kategorie Oxygen Equipment

Dokumente, die wir vom Produzenten des Geräts Emerson Process Management I-0320 erhalten, können wir in mehrere Gruppen teilen. Unteranderem in:
- technische Zeichnungen Emerson Process Management
- Bedienungsanleitungen I-0320
- Produktkarten Emerson Process Management
- Informationsbroschüren
- oder Energieetiketten Emerson Process Management I-0320
Jede von ihnen ist wichtig, jedoch finden wir die wichtigsten Informationen für den Nutzer des Geräts in der Bedienungsanleitung Emerson Process Management I-0320.

Die Dokumentengruppe, die als Bedienungsanleitungen bezeichnet wird, wird ebenfalls in detaillierte Arten geteilt, solche wie: Montageanleitungen Emerson Process Management I-0320, Wartungsanleitungen, Kurzanleitungen oder Benutzeranleitungen Emerson Process Management I-0320. Abhängig vom Bedarf, sollten Sie das Dokument finden, das Sie brauchen. In unserem Service können Sie sich die populärste Bedienungsanleitung des Produkts Emerson Process Management I-0320 ansehen.

Die komplette Bedienungsanleitung des Geräts Emerson Process Management I-0320, wie sollte sie aussehen?
Die Bedienungsanleitung, auch bezeichnet als Benutzerhandbuch, oder einfach nur „Anleitung”, ist ein technisches Dokument, das dem Benutzer bei der Nutzung von Emerson Process Management I-0320 hilfreich sein soll. Die Bedienungsanleitungen werden in der Regel von technischen Schriftstellern geschrieben, aber in einer Sprache, die für alle Nutzer von Emerson Process Management I-0320 verständlich ist.

Eine gänzliche Bedienungsanleitung von Emerson Process Management sollte einige Grundelemente enthalten. Ein Teil von ihnen ist nicht so wichtig, wie z.B.: die Titelseite oder Autorenseiten. Die restlichen von ihnen jedoch, sollten Informationen liefern, die für den Nutzer von enormer Wichtigkeit sind.

1. Einführung und Hinweise, wie man sich in einer Bedienungsanleitung von Emerson Process Management I-0320 bewegt - Am Anfang jeder Bedienungsanleitung sollten wir Hinweise bezüglich der Nutzungsart eines bestimmten Ratgebers finden. In ihr sollten sich Informationen über die Lokalisierung des Inhaltsverzeichnisses von Emerson Process Management I-0320 befinden, FAQ oder über oft auftretende Probleme – also Stellen, die von den Benutzern in jeder Bedienungsanleitung am meisten gesucht werden
2. Inhaltsverzeichnis - Index aller Ratschläge bezüglich Emerson Process Management I-0320, die wir im aktuellen Dokument finden
3. Ratschläge zur Nutzung der Grundfunktionen des Geräts Emerson Process Management I-0320 - die uns die ersten Schritte während der Nutzung von Emerson Process Management I-0320 erleichtern sollten
4. Troubleshooting - geordneter Tätigkeitslauf, der uns bei der Diagnose und als nächstes bei der Lösung wichtiger Probleme mit Emerson Process Management I-0320 hilft
5. FAQ - häufig gestellte Fragen
6. Kontaktdaten Informationen darüber, wo man Kontakt zum Produzenten / Service von Emerson Process Management I-0320 im bestimmten Land suchen kann, wenn es nicht gelingt, das Problem selbst zu lösen.

Haben Sie eine Frage bezüglich Emerson Process Management I-0320?

Nutzen Sie das untere Formular

Wenn Sie mit Hilfe der gefundenen Bedienungsanleitung Ihr Problem mit Emerson Process Management I-0320 nicht gelöst haben, stellen Sie eine Frage, indem Sie das untere Formular nutzen. Wenn einer der Nutzer ein ähnliches Problem mit Emerson Process Management I-0320 hatte, ist es möglich, dass er mit Ihnen die Lösung teilen möchte.

Text vom Bild übertragen

Kommentare (0)