Manual Emerson Process Management I-0320

47 pages 5.21 mb
Download

Go to site of 47

Summary
  • Emerson Process Management I-0320 - page 1

    (I-0320--.doc/1) 1 SERVICE MANUAL No. I-0320 MULTIPORT FLOW SELECTOR CUSTOMER: P.O. # W.O. # TAG: DATE: OPERATOR MODEL I-0320--.DOC/1 REV 1: AUG-31-04 Bettis Canada Ltd. 4112-91A Street Edmonton, Alberta Canada T6E 5V2 Tel: 780-450-3600 Fax: 780-450-1400 ...

  • Emerson Process Management I-0320 - page 2

    (I-0320--.doc/2) 2 TABLE OF CONTENTS I INTRODUCTION ............................................................................................................................... ............ 4 II MULTIPORT SPECIFICATIONS ................................................................................................................ 4 IIB ACTUATOR ...

  • Emerson Process Management I-0320 - page 3

    (I-0320--.doc/3) 3 OBSERVE ALL WARNING DECALS AND TAGS MINIMUM TOOLS REQUIRED: A torque wrench, socket wre nch, and allen head wrench es are required to install the Multiport and Actuator assembly. MULTI PO RT SIZE NPS 2” NPS 3” ANSI 600 NPS 3” ANSI 900/1500 NPS 4” ANSI 600 NPS 4” ANSI 900 BONNET NUT SOCKET SIZE 1 7/16” 2” 2 3/8” 2 ...

  • Emerson Process Management I-0320 - page 4

    (I-0320--.doc/4) 4 I INTRODUCTION As many as eight flow-lines c an be manifolded through one BETTIS Multiport Flow Sele ctor. The multiport allows diversion of an individual flow-line to a test outlet for testing or sampling, while combining t he flow of t he other fl ow-lines in to a separate g roup outl et. II MULTIPORT SPECIFICATIONS RATING SIZE ...

  • Emerson Process Management I-0320 - page 5

    (I-0320--.doc/5) 5 MULTIPORT SIZE AND RATING NPS 2" ANSI 600 NPS 3" ANSI 600 NPS 3" ANSI 900/1500 NPS 4" ANSI 600 NPS 4" ANSI 900 TEST OUTLETC V 67 151 100 27 0 218 GROUP OUTLET C V 262 594 429 1040 830 SHELL HYDROSTATIC TEST PRESSURE PSIG (KPa) 2200-2220 (13780-15300) 2160 (14900) 5560 (38310) 2220 (15300) 3330 (22950) MAX ...

  • Emerson Process Management I-0320 - page 6

    (I-0320--.doc/6) 6 III MULTIPORT INSTALLATION Before installing the unit, observe all warning tags and: 1. Check for external physical damage. 2. Check for any visible leak age of gear oil from th e speed reducer (426). 3. Visually inspect the inside of the multipo r t through the group outlet port checking fo r d amage, rust, and de bris. 4. Check ...

  • Emerson Process Management I-0320 - page 7

    (I-0320--.doc/7) 7 with the #6 well connection. This allows for the installation of the connector pin. Note that installing the pin may require elect rical power so that the upper section of the connector c an be rotated to align the bolt hole. 2. Install the lower section of the connect or onto th e stem flat. Orient th e lower section of the conn ...

  • Emerson Process Management I-0320 - page 8

    (I-0320--.doc/8) 8 2. Controll er address ( I-0168 Se ction J). 3. Control room M ODBUS RTU operation ( I-0168 Secti on D). 4. Installation and use of Bettis Multiport Electronic Controller software on laptop PC. IV MULTIPORT MAINTENANC E Refer to the typical multiport assembly drawing AB0461 on page 14 and the multiport cutaway drawing AB0462 on p ...

  • Emerson Process Management I-0320 - page 9

    (I-0320--.doc/9) 9 NOTE:If the seal wave springs are not properly alig ned and seated the plug seal may not h old rated differential pressure. 3. Install the seal back-up plate (143) against the shoulder in the plug. 4. Lubricate and install the plug seal o-ring (149) on the stainless steel portion of the plug seal assembly (142). Lubricate and ins ...

  • Emerson Process Management I-0320 - page 10

    (I-0320--.doc/10) 10 bonnet in place on the multip o rt body with the s eal injection fitting over the group ou tlet. The bonnet stud h oles must be al igned with t he body’s t apped stud hol es. NOTE:Ensure the b onnet is flat and low ered slowly onto the top of th e multiport body in or der to prevent damaging th e body o-ring and plug seals. P ...

  • Emerson Process Management I-0320 - page 11

    (I-0320--.doc/11) 11 3. Turn the plug (130) at least one complete revolution while checking for smooth movement. If the plug seal asse mbly (142 ) is bindin g at inlet ports when the plug is rotated, the plug seal assembly or the seal wave springs (140) are not in thei r proper position(s). See disassembly procedure below, if required. 4. Install t ...

  • Emerson Process Management I-0320 - page 12

    (I-0320--.doc/12) 12 NOTE: An index mark on one flat on the square end of the plug (130) indicates port position. Ins tall the connector so that the index mark is visible. 4. Install the indicator (188) on th e upper connector (410) using th e nut (192). Ensure that the indicator is al igned wi th the inde x mark o n the square e nd of the pl ug. 5 ...

  • Emerson Process Management I-0320 - page 13

    (I-0320--.doc/13) 13 VIII TROUBLESHOOTING A. Actuator Does Not Align Plug (130) t o Port. 1. Check the multiport/actuator co nn ector for looseness. 2. Check the Switchpak/actuat o r connector for looseness. 3. Check the motor for stalling or overload. 4. Check the speed reducer for visual leakage or noisy gear. 5. Check the accuracy of the positio ...

  • Emerson Process Management I-0320 - page 14

    (I-0320--.doc/14) 14 IX DRAWINGS ...

  • Emerson Process Management I-0320 - page 15

    (I-0320--.doc/15) 15 ...

  • Emerson Process Management I-0320 - page 16

    (I-0320--.doc/16) 16 ...

  • Emerson Process Management I-0320 - page 17

    (I-0320--.doc/17) 17 ...

  • Emerson Process Management I-0320 - page 18

    (I-0320--.doc/18) 18 ...

  • Emerson Process Management I-0320 - page 19

    (I-0320--.doc/19) 19 ...

  • Emerson Process Management I-0320 - page 20

    (I-0320--.doc/20) 20 X TYPICAL MULTIPORT SEAL COMPONENTS PLUG SEAL COMPONENTS SEAL ASSEMBLY (L–>R: BACKUP PL ATE, O-RING, SEAT R ING, SEAL I NSERT, ASSEM B LY ) ...

  • Emerson Process Management I-0320 - page 21

    (I-0320--.doc/21) 21 SEAL ASSEMBLY (TOP: ASSEMBLY. B OTTOM (L–> R): SEAL ADJUSTME NT NUT, SEAL W AVE SPRINGS, SEAT RING/PLA TE/O- RING/SEAL IN SERT, SCRAPER WAVE SPRINGS, SCRAPER) PLUG SEAL ADJ USTMENT TOOL SHOWN WIT H BASE PARALL EL TO SHANK F OR INSERTION, BASE PERP ENDICU LAR TO SHANK, AND ENGA GED IN SEAL ADJUSTMENT NUT. ...

  • Emerson Process Management I-0320 - page 22

    (I-0320--.doc/22) 22 PLUG (Index mark can be found on the stem flat that faces the sam e way as the plug sea l opening.) PLUG SEAL ADJUSTMENT TO OL IN PLUG ...

  • Emerson Process Management I-0320 - page 23

    (I-0320--.doc/23 or ig:ss/ss-2004-02-09 rev1:ss/ss- 2004-08-31 app DIST :(EF)O ; ( SM)P) 23 XI MULTIPORT FLOW SELECTOR NOTES ...

  • Emerson Process Management I-0320 - page 24

    (I-0320--.doc/appendix) 24 APPENDIX 1: MOTORS A: Baldor Motors ...

  • Emerson Process Management I-0320 - page 25

    (I-0320--.doc/appendix) 25 ...

  • Emerson Process Management I-0320 - page 26

    (I-0320--.doc/appendix) 26 ...

  • Emerson Process Management I-0320 - page 27

    (I-0320--.doc/appendix) 27 B: Elnor Motors ...

  • Emerson Process Management I-0320 - page 28

    (I-0320--.doc/appendix) 28 ...

  • Emerson Process Management I-0320 - page 29

    (I-0320--.doc/appendix) 29 ...

  • Emerson Process Management I-0320 - page 30

    (I-0320--.doc/appendix) 30 ...

  • Emerson Process Management I-0320 - page 31

    (I-0320--.doc/appendix) 31 ...

  • Emerson Process Management I-0320 - page 32

    (I-0320--.doc/appendix) 32 C: Pacific Scientific Motors ...

  • Emerson Process Management I-0320 - page 33

    (I-0320--.doc/appendix) 33 ...

  • Emerson Process Management I-0320 - page 34

    (I-0320--.doc/appendix) 34 ...

  • Emerson Process Management I-0320 - page 35

    (I-0320--.doc/appendix) 35 ...

  • Emerson Process Management I-0320 - page 36

    (I-0320--.doc/appendix) 36 APPENDIX 2 : GEAR RE DUCERS A: Morse Gearbox ...

  • Emerson Process Management I-0320 - page 37

    (I-0320--.doc/appendix) 37 ...

  • Emerson Process Management I-0320 - page 38

    (I-0320--.doc/appendix) 38 ...

  • Emerson Process Management I-0320 - page 39

    (I-0320--.doc/appendix) 39 B: Boston Gear Gearbox ...

  • Emerson Process Management I-0320 - page 40

    (I-0320--.doc/appendix) 40 ...

  • Emerson Process Management I-0320 - page 41

    (I-0320--.doc/appendix) 41 ...

  • Emerson Process Management I-0320 - page 42

    (I-0320--.doc/appendix) 42 ...

  • Emerson Process Management I-0320 - page 43

    (I-0320--.doc/appendix) 43 ...

  • Emerson Process Management I-0320 - page 44

    (I-0320--.doc/appendix) 44 ...

  • Emerson Process Management I-0320 - page 45

    (I-0320--.doc/appendix) 45 ...

  • Emerson Process Management I-0320 - page 46

    (I-0320--.doc/appendix) 46 ...

  • Emerson Process Management I-0320 - page 47

    (I-0320--.doc/appendix) 47 C: Baldor Ge arbox ...

Manufacturer Emerson Process Management Category Oxygen Equipment

Documents that we receive from a manufacturer of a Emerson Process Management I-0320 can be divided into several groups. They are, among others:
- Emerson Process Management technical drawings
- I-0320 manuals
- Emerson Process Management product data sheets
- information booklets
- or energy labels Emerson Process Management I-0320
All of them are important, but the most important information from the point of view of use of the device are in the user manual Emerson Process Management I-0320.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Emerson Process Management I-0320, service manual, brief instructions and user manuals Emerson Process Management I-0320. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Emerson Process Management I-0320.

A complete manual for the device Emerson Process Management I-0320, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Emerson Process Management I-0320 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Emerson Process Management I-0320.

A complete Emerson Process Management manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Emerson Process Management I-0320 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Emerson Process Management I-0320, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Emerson Process Management I-0320, that we can find in the current document
3. Tips how to use the basic functions of the device Emerson Process Management I-0320 - which should help us in our first steps of using Emerson Process Management I-0320
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Emerson Process Management I-0320
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Emerson Process Management I-0320 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Emerson Process Management I-0320?

Use the form below

If you did not solve your problem by using a manual Emerson Process Management I-0320, ask a question using the form below. If a user had a similar problem with Emerson Process Management I-0320 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)